Address R: ply to: Post Office Box 767 Chicago, Illinois 60690 November 30, 1981 Mr, James G. Keppler, Director Directorate of Inspection and o | |||
e Enforcement - Region III fgs U.S. Nuclear Regulatory Commission | |||
'.q, D | |||
kg l/f 799 Roosevelt Road y | |||
g Glen Ellyn, IL 60137 p ggC7 i | |||
Th %s. | |||
IO81u ] | |||
==Subject:== | ==Subject:== | ||
Dresden Station Units 2 and 3 | Dresden Station Units 2 and 3 D | ||
Quad Cities Station Units 1 and | IE@% | ||
I.E. Bulletin 80-11, " Masonry | Quad Cities Station Units 1 and | ||
Wall Design" - 180 Day Report | '95 I.E. Bulletin 80-11, " Masonry N | ||
NRC Docket Nos. 50-237/249 and 50-254/265 | Wall Design" - 180 Day Report af}i$ | ||
Reference (a): | NRC Docket Nos. 50-237/249 and 50-254/265 Reference (a): | ||
(b): | J. G. | ||
(c): | Keppler letter to Cordell Reed dated May 8, 1980. | ||
(b): | |||
J. S. Abel letter to J. G. Keppler dated November 6, 1980. | |||
(c): | |||
Cordell Reed letter to D. G. Eisenhut dated January 23, 1981. | |||
==Dear Mr. Keppler:== | ==Dear Mr. Keppler:== | ||
References (b) and (c) advised the NRC of the Commonwealth Edison Company intent to postpone, until November 1981, the comple-tion of the analysis and reporting requirements of I.E. Bulletin 80-11, Iter 2.b, for our Dresden Station Units 2 and 3 and Quad Cities Station Units 1 and 2. | |||
References (b) and (c) advised the NRC of the Commonwealth Edison Company intent to postpone, until November 1981, the comple-tion of the analysis and reporting requirements of I.E. Bulletin 80-11, Iter 2.b, | |||
Attached for your information and use are three (3) copies-each of our postponed 180 day response to the subject bulletin for our Dresden and Quad Cities Stations, as requested in Item 2.b of Reference (a). | Attached for your information and use are three (3) copies-each of our postponed 180 day response to the subject bulletin for our Dresden and Quad Cities Stations, as requested in Item 2.b of Reference (a). | ||
In both station responses, we indicate that a number of walls require further evaluation. Our estimate for completion of this evaluation ef fort with submittal of -the results to the NRC is January 29, 1982. | In both station responses, we indicate that a number of walls require further evaluation. | ||
Our estimate for completion of this evaluation ef fort with submittal of -the results to the NRC is January 29, 1982. | |||
For those masonry walls which do not meet our acceptance criteria, the schedule date for completion of the necessary repairs to such walls is June 1,1983. | |||
This schedule includes adequate time for design work and procurement of materials. | |||
Additionally, this schedule anticipates the difficulties associated with modifying many of these walls which are located in high radiation areas. | Additionally, this schedule anticipates the difficulties associated with modifying many of these walls which are located in high radiation areas. | ||
g2g[oh ^ | g2g[oh ^ | ||
/E// | |||
U 2N o | |||
?// | |||
f j' Mr. J. G. Keppler | f j' Mr. | ||
In some respects, these statements are not based upon my personal knowledge but upon information furnished by other Commonwealth Edison employees and consultants. Such information has been reviewed in accordance with Company practice and I believe it to be reliable. | J. | ||
G. | |||
Keppler Novembe r 30, 1981 To the best of my knowledge and belief, the statements contained herein and in the attached reports are true and correct. | |||
In some respects, these statements are not based upon my personal knowledge but upon information furnished by other Commonwealth Edison employees and consultants. | |||
Such information has been reviewed in accordance with Company practice and I believe it to be reliable. | |||
Please address any questions that you may have concerning this submittal to this office. | Please address any questions that you may have concerning this submittal to this office. | ||
Very truly yours, 2_ | Very truly yours, 2_ | ||
(.h.A y | (.h.A y | ||
E. Douglas Swartz Nuclear Licensing Administrator Attachment cc: | w -- | ||
E. Douglas Swartz Nuclear Licensing Administrator Attachment cc: | |||
NRC Of fice of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C. | |||
20555 Region III Inspector - Dresden Region III Inspector - Quad Cities SUBSCRIBED AND SWORN to befo e me this | |||
/ M day of _h 1981. | |||
''ond d $ $ ~ | |||
2 Notary Public EDS/lm 2967N J}} | |||
Latest revision as of 01:09, 20 December 2024
| ML20038B935 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Quad Cities |
| Issue date: | 11/30/1981 |
| From: | Swartz E COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20038B936 | List: |
| References | |
| REF-SSINS-6820 IEB-80-11, NUDOCS 8112090327 | |
| Download: ML20038B935 (2) | |
Text
r h Commonwealth Edison a
) ons First Netional Plaza, Chicago. Ulinois
/
O C
Address R: ply to: Post Office Box 767 Chicago, Illinois 60690 November 30, 1981 Mr, James G. Keppler, Director Directorate of Inspection and o
e Enforcement - Region III fgs U.S. Nuclear Regulatory Commission
'.q, D
kg l/f 799 Roosevelt Road y
g Glen Ellyn, IL 60137 p ggC7 i
Th %s.
IO81u ]
Subject:
Dresden Station Units 2 and 3 D
IE@%
Quad Cities Station Units 1 and
'95 I.E.Bulletin 80-11, " Masonry N
Wall Design" - 180 Day Report af}i$
NRC Docket Nos. 50-237/249 and 50-254/265 Reference (a):
J. G.
Keppler letter to Cordell Reed dated May 8, 1980.
(b):
J. S. Abel letter to J. G. Keppler dated November 6, 1980.
(c):
Cordell Reed letter to D. G. Eisenhut dated January 23, 1981.
Dear Mr. Keppler:
References (b) and (c) advised the NRC of the Commonwealth Edison Company intent to postpone, until November 1981, the comple-tion of the analysis and reporting requirements of I.E.Bulletin 80-11, Iter 2.b, for our Dresden Station Units 2 and 3 and Quad Cities Station Units 1 and 2.
Attached for your information and use are three (3) copies-each of our postponed 180 day response to the subject bulletin for our Dresden and Quad Cities Stations, as requested in Item 2.b of Reference (a).
In both station responses, we indicate that a number of walls require further evaluation.
Our estimate for completion of this evaluation ef fort with submittal of -the results to the NRC is January 29, 1982.
For those masonry walls which do not meet our acceptance criteria, the schedule date for completion of the necessary repairs to such walls is June 1,1983.
This schedule includes adequate time for design work and procurement of materials.
Additionally, this schedule anticipates the difficulties associated with modifying many of these walls which are located in high radiation areas.
g2g[oh ^
/E//
U 2N o
?//
f j' Mr.
J.
G.
Keppler Novembe r 30, 1981 To the best of my knowledge and belief, the statements contained herein and in the attached reports are true and correct.
In some respects, these statements are not based upon my personal knowledge but upon information furnished by other Commonwealth Edison employees and consultants.
Such information has been reviewed in accordance with Company practice and I believe it to be reliable.
Please address any questions that you may have concerning this submittal to this office.
Very truly yours, 2_
(.h.A y
w --
E. Douglas Swartz Nuclear Licensing Administrator Attachment cc:
NRC Of fice of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.
20555 Region III Inspector - Dresden Region III Inspector - Quad Cities SUBSCRIBED AND SWORN to befo e me this
/ M day of _h 1981.
ond d $ $ ~
2 Notary Public EDS/lm 2967N J