Forwards 180-day Response to IE Bulletin 80-11, Masonry Wall Design. Complete Evaluation of Walls Will Be Submitted by 820129.Walls Not Meeting Acceptance Criteria Will Be Repaired by 830601
ML20038B935
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 11/30/1981
From: Swartz E
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20038B936 List:
References
REF-SSINS-6820 IEB-80-11, NUDOCS 8112090327
Download: ML20038B935 (2)


Text

r .

a O

h Commonwealth Edison

/ ) ons First Netional Plaza, Chicago. Ulinois C Address R: ply to: Post Office Box 767 Chicago, Illinois 60690 November 30, 1981 Mr, James G. Keppler, Director Directorate of Inspection and Enforcement - Region III o e U.S. Nuclear Regulatory Commission fgs 799 Roosevelt Road y ' .q, D kg l/f g Glen Ellyn, IL 60137 i p ggC7 Th %s. IO81u ]

Subject:

Dresden Station Units 2 and 3 D IE@%

Quad Cities Station Units 1 and '95 -

I.E. Bulletin 80-11, " Masonry N ' -

Wall Design" - 180 Day Report af}i$

NRC Docket Nos. 50-237/249 and 50-254/265 -

Reference (a): J. G. Keppler letter to Cordell Reed dated May 8, 1980.

(b): J. S. Abel letter to J. G. Keppler dated November 6, 1980.

(c): Cordell Reed letter to D. G. Eisenhut dated January 23, 1981.

Dear Mr. Keppler:

References (b) and (c) advised the NRC of the Commonwealth Edison Company intent to postpone, until November 1981, the comple-tion of the analysis and reporting requirements of I.E. Bulletin 80-11, Iter 2.b, for our Dresden Station Units 2 and 3 and Quad Cities Station Units 1 and 2.

Attached for your information and use are three (3) copies-each of our postponed 180 day response to the subject bulletin for our Dresden and Quad Cities Stations, as requested in Item 2.b of Reference (a).

In both station responses, we indicate that a number of walls require further evaluation. Our estimate for completion of this evaluation ef fort with submittal of -the results to the NRC is January 29, 1982. For those masonry walls which do not meet our acceptance criteria, the schedule date for completion of the necessary repairs to such walls is June 1,1983. This schedule includes adequate time for design work and procurement of materials.

Additionally, this schedule anticipates the difficulties associated with modifying many of these walls which are located in high radiation areas.

g2g[oh ^

o U 2N

/E//

?//

f j' Mr. J. G. Keppler Novembe r 30, 1981 To the best of my knowledge and belief, the statements contained herein and in the attached reports are true and correct. <

In some respects, these statements are not based upon my personal knowledge but upon information furnished by other Commonwealth Edison employees and consultants. Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

Please address any questions that you may have concerning this submittal to this office.

Very truly yours, 2_

(.h.A y w --

E. Douglas Swartz Nuclear Licensing Administrator Attachment cc: NRC Of fice of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C. 20555 Region III Inspector - Dresden Region III Inspector - Quad Cities SUBSCRIBED AND SWORN to befo e me this / M day of _h , 1981.

ondNotary d $ $Public

~ 2 EDS/lm 2967N J