ML20054B906: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,               n                                                   _
{{#Wiki_filter:,
                                                                                                        ,          ~           w-OPERATING DATA REPORT DOCKET NO.     50-369 DATE      4- N C051PLETED BY     J.A. Reavis TELEPilONE 704-373-8552 OPERATING ST.\TUS McGuire #1                                       Notes
n
~
w-OPERATING DATA REPORT 50-369 DOCKET NO.
4-N DATE C051PLETED BY J.A. Reavis TELEPilONE 704-373-8552 OPERATING ST.\\TUS McGuire #1 Notes
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period: March 1, 1982-March 31, 1982
: 2. Reporting Period: March 1, 1982-March 31, 1982
: 3. Licensed Thennal Power IN!Wt):         3 411
: 3. Licensed Thennal Power IN!Wt):
: 4. Nameplate Rating (Grow SlWe g         1 220
3 411 1 220
: 5. Design Electrical Rating (Net .stWen   1  180
: 4. Nameplate Rating (Grow SlWe g 1 180
: 6. 31asimum Dependable Capacity (Grow .\1We):
: 5. Design Electrical Rating (Net.stWen
: 7. hlasimum Dependable Capacity (Net .\lhe):                         !
: 6. 31asimum Dependable Capacity (Grow.\\1We):
: 7. hlasimum Dependable Capacity (Net.\\lhe):
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Give Reasons:
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Give Reasons:
: 9. Power Lesel To which Restricted. If Any tNet >!We):
: 9. Power Lesel To which Restricted. If Any tNet >!We):
: 10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:
This 51onth           Yr..to.Date         Cumulative
This 51onth Yr..to.Date Cumulative 744.0 2 160.0 2 904.0
: 11. Ilours in Reporting Period                          744.0                 2 160.0             2 904.0
: 11. Ilours in Reporting Period 315.9 1 583.0 1 628.7
: 12. Number Of Hours Reactor % Critical                  315.9                 1 583.0             1 628.7
: 12. Number Of Hours Reactor % Critical
: 13. Reactor Resene Shutdown llours
: 13. Reactor Resene Shutdown llours
: 14. Ilours Generator On-Line                           312.8                 1 567.5             1 613.2
: 14. Ilours Generator On-Line 312.8 1 567.5 1 613.2
: 15. Unit Resene Shutdown Hours
: 15. Unit Resene Shutdown Hours
: 16. Gross Thermal Energy Generated OlWH)               530 357               2 858 574           2 943 529         -
: 16. Gross Thermal Energy Generated OlWH) 530 357 2 858 574 2 943 529
: 17. Grow Electrical Energy Generated (31Wil)           176   700                 959 591             988 027
: 17. Grow Electrical Energy Generated (31Wil) 176 700 959 591 988 027 160 576 893 029 912 085
: 18. Net Electrical Energy Generated (N!WH)             160  576                893 029            912 085
: 18. Net Electrical Energy Generated (N!WH) 42.0 72.6 55.6
: 19. Unit Service Factor                                42.0                       72.6               55.6
: 19. Unit Service Factor
: 20. Unit Asailability Factor                           42.0                       72.6               55.6
: 20. Unit Asailability Factor 42.0 72.6 55.6
: 21. Unit Capacity Factor IUsing .\lDC Neti             1R.3                       35.0               26.6
: 21. Unit Capacity Factor IUsing.\\lDC Neti 1R.3 35.0 26.6
: 22. Unit Capacity Factor (Usm; DER Net)               24.4                     46.7                 35.5
: 22. Unit Capacity Factor (Usm; DER Net) 24.4 46.7 35.5
: 23. Unit Forced Outace Rate                             58.0                       27.4               44.5
: 23. Unit Forced Outace Rate 58.0 27.4 44.5
: 24. Shutdowns Scheduled Oser Nest 6 \1onths (Type. Date,and Duration of Each t:
: 24. Shutdowns Scheduled Oser Nest 6 \\1onths (Type. Date,and Duration of Each t:
Eddy Current Testing - June 18 - 3 weeks
Eddy Current Testing - June 18 - 3 weeks
: 25. If Shut Down \t End Of Report Permd. Estim.ited Date of Startup:
: 25. If Shut Down \\t End Of Report Permd. Estim.ited Date of Startup:
: 26. Units in Test Status tPrmr to Commercul Operation):                       Forecast             Achiesed 1NITI \ L CRITICAlll Y INilI A L 1.LITl RICIIV COT 1.\1l.RCIT L OPl.R A flON 8204190303 820415 PDR ADOCK 05000369                                                                                               N/773 R                         PDR J
: 26. Units in Test Status tPrmr to Commercul Operation):
Forecast Achiesed 1NITI \\ L CRITICAlll Y INilI A L 1.LITl RICIIV COT 1.\\1l.RCIT L OPl.R A flON 8204190303 820415 PDR ADOCK 05000369 N/773 R
PDR J


                                                                                =
=
DOCKET NO.               50-369         .
UNIT SilUTDOWNS AND POWER REDUCllONS DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCllONS UNil NAhf E           McGuire 1 DATE         4-15-82 March, 1982                     COMPLETED fly             J. A. Reavis REPORT Af0NTII                                                           (704)373-8552 TELEPIIONE I
50-369 UNil NAhf E McGuire 1 DATE 4-15-82 March, 1982 COMPLETED fly J. A.
Reavis REPORT Af0NTII TELEPIIONE (704)373-8552 I
n.
n.
_      E                               E
E E
                            -,        3?       3j    $ E5 jgy Licensee     ,E-t,     *%
3?
g                      Cause & Cor rective No.             Date     g       3g                               Event       g7         93                           Actiam to
3
                                      $5         d     j if3 g         Repost a     m' U       j'                       Prevent Recurrente 6
$ E5 Licensee
9A       82-03-01       F     431.25       B         --
,E-t, Cause & Cor rective g
CB       HTEXCH       Eddy current inspection of steam generator tubes in progress.
No.
5-p       82-03-20       F       --
Date g
B         --
3g j
ZZ       ZZZZZZ       Holding at 75% power to complete steam                   ,
jgy Event g7 93 Actiam to
generator flow test readings.
$5 d
6p       82-03-20       F       --
j if3 g Repost a m' U j'
H         --
Prevent Recurrente 6
CB       HTEXCH       Reduced to 50% power awaiting further analysis of steam generator condition.
9A 82-03-01 F
I                       2                                                       3                                 4 F: Fmeed               Reason:                                                 Mettuid:                             lixliibit G - Instructiims S: Sclicif uleil       A Et[uipment Failure (Explain)                         141.mual                             for Preparatnen of Data Il4taintenance of Test                                 24tanual Scram.                     lintry Slicets for 1.ieensee C.Refacting                                             3 Automatic Sci.im.                 Event Report (I.LRI File int!RI:G.
431.25 B
D. Regulatory Resirietion                               4 O her(Explain)                     0161) 1: Ope.ator Training & License Examination F Administrative                                                                         5 G Opciational liiror (Espl.iin)                                                             Esinbit 1 -Same Source (9/77)                     lI-Other ( Explain) l
CB HTEXCH Eddy current inspection of steam generator tubes in progress.
5-p 82-03-20 F
B ZZ ZZZZZZ Holding at 75% power to complete steam generator flow test readings.
6p 82-03-20 F
H CB HTEXCH Reduced to 50% power awaiting further analysis of steam generator condition.
I 2
3 4
F: Fmeed Reason:
Mettuid:
lixliibit G - Instructiims S: Sclicif uleil A Et[uipment Failure (Explain) 141.mual for Preparatnen of Data Il4taintenance of Test 24tanual Scram.
lintry Slicets for 1.ieensee C.Refacting 3 Automatic Sci.im.
Event Report (I.LRI File int!RI:G.
D. Regulatory Resirietion 4 O her(Explain) 0161) 1: Ope.ator Training & License Examination F Administrative 5
G Opciational liiror (Espl.iin)
Esinbit 1 -Same Source (9/77) lI-Other ( Explain) l


AVERAGE D Al).Y L* NIT ?OWER LEVEL 1
AVERAGE D Al).Y L* NIT ?OWER LEVEL OCCKET NO, 50-369 LNIT McGuire #1 4 82 OATE COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 310 NTH March, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER.4GE D41LY ?OWER :.EVEL (5the-Neti v 3f we.Ner:
1 OCCKET NO,               50-369 LNIT     McGuire #1 4 82 OATE COMPLETED BY               J. A. Reavis TELEPHONE             (704)373-8552 310 NTH                 March, 1982 DAY         AVERAGE DAILY POWER LEVEL                                               DAY         AVER.4GE D41LY ?OWER :.EVEL (5the-Neti                                                                     v 3f we.Ner:
I 17 2
I                                                                                 17 2                                                                                                                 -
13 J
13 J                                                                                                               451 19 4                                                                                                               556
451 19 4
:o 5-                                                                                 21                           518
556
                                          ~
:o 5-518 21
22                           524 7
~
23                           537 3                                                                                                               536 24 9                                                                                                               539 25 10                                                                                                               536 25 1!                                                                                                               535 12                                                                                                               535 23 l'
22 524 7
29 541 14 30 545 15 31 545 16
537 23 3
      !NSTRL'CTICNS Cn t.".:s (c r: sc . [is t :,s.e y,,7:g,- ,,80. .. . it ;';w er 'e . e ;3 *,l*,v e'.N,,''-
536 24 9
                                                                                                    ,3*.,
25 539 10 536 25 1!
                                                                                                  - .-    ,3*.
535 12 23 535 l'
                                                                                                              " ' 7 * - ;, - . ., ;
541 29 14 545 30 15 545 31 16
                                                                                                                                .    .. g;3  ,. ,  ,
!NSTRL'CTICNS Cn t.".:s (c r: sc. [is t :,s.e y,,7:g,-,,80.... it ;';w er 'e. e ;3 *,l*,v
      ,_,- Ud 3f 11.b nete , ,e g:w:g.
.N,,
                                                                                                                                                    .. - g
.,,,3*.,
,3*.
e'
" ' 7 * - ;, -.., ;
,_, Ud 3f 11.b nete,,e g:w:g.
g;3
.. - g


R MONTHLY REFUELING INFORMATION RE00EST
R MONTHLY REFUELING INFORMATION RE00EST 1.
: 1.       Facility name:                       McGuire Unit 1                                                   .
Facility name:
: 2.      Scheduled next refueling shutdcwn:                               June, 1983                           .
McGuire Unit 1 2.
: 3.      Scheduled restart following refueling:                                                                 .
Scheduled next refueling shutdcwn:
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?                                           .
June, 1983 3.
<                      If yes, what will these be?
Scheduled restart following refueling:
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
i i
i i
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A                                       -
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A If no, when is review scheduled?
If no, when is review scheduled?                                 N/A                                 -
N/A 5.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion:                           N/A                                                         ,
Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion:
: 6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).                                     N/A
N/A 6.
: 7. Number of fuel asse=blies (a) in the core:                                   193     .
I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
(b) in the spent fuel pool:                 23     -
N/A 7.
: 8. Present licensed fuel pool capacity:                                 500 Size of requested or planned increase:                                                               .
Number of fuel asse=blies (a) in the core:
: 9. Projected date of last refueling which can be accoc=odated by present licensed capacity:                                                                                     .
193 (b) in the spent fuel pool:
23 500 8.
Present licensed fuel pool capacity:
Size of requested or planned increase:
9.
Projected date of last refueling which can be accoc=odated by present licensed capacity:
I J
I J
DUKE PC'4ER COMPANY                                       Date:               A Pril 15, 1982 l
A ril 15, 1982 l
I                   Name of Contact :                 J. A. Reavis                                                       .
DUKE PC'4ER COMPANY Date:
4
P I
Name of Contact :
J. A. Reavis 4


DOCKET NO:   50-369 UNIT: McGuire Unit 1 DATE: April 15, 1982 NARRATIVE sum!ARY Month: March, 1982 McGuire 1 began the month of March in an outage for eddy current inspection of the steam generator tubes. The steam generator tube inspection and other maintenance was completed and the unit returned to service on March 18 at 2315.
DOCKET NO:
50-369 UNIT:
McGuire Unit 1 DATE:
April 15, 1982 NARRATIVE sum!ARY Month: March, 1982 McGuire 1 began the month of March in an outage for eddy current inspection of the steam generator tubes. The steam generator tube inspection and other maintenance was completed and the unit returned to service on March 18 at 2315.
Steam generator flow test readings were recorded to the 75% power level.
Steam generator flow test readings were recorded to the 75% power level.
After completion of the test readings, the unit was reduced to 50% power and continued the remainder of the month awaiting further analysis of steam generator condition.
After completion of the test readings, the unit was reduced to 50% power and continued the remainder of the month awaiting further analysis of steam generator condition.
Line 117: Line 157:
I
I


McCUIRE NUCLEAR STATION Operating Status Report
McCUIRE NUCLEAR STATION Operating Status Report 1.
: 1. Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of their allowable annual rad'ation dose limit.
Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of their allowable annual rad'ation dose limit.
: 2. The total station liquid release contribution to whole body dose for February has been compared with the Technical Specifications annual value of 3 mrem; the total release for February was less than 10 percent of this limit.
2.
The total station liquid release contribution to whole body dose for February has been compared with the Technical Specifications annual value of 3 mrem; the total release for February was less than 10 percent of this limit.
The total station gaseous release contribution to any organ dose for February has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for February was less than 10 percent of this limit.
The total station gaseous release contribution to any organ dose for February has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for February was less than 10 percent of this limit.
                                                                                -.}}
-.}}

Latest revision as of 19:01, 17 December 2024

Monthly Operating Rept for Mar 1982
ML20054B906
Person / Time
Site: McGuire 
Issue date: 04/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20054B902 List:
References
NUDOCS 8204190303
Download: ML20054B906 (6)


Text

,

n

~

w-OPERATING DATA REPORT 50-369 DOCKET NO.

4-N DATE C051PLETED BY J.A. Reavis TELEPilONE 704-373-8552 OPERATING ST.\\TUS McGuire #1 Notes

1. Unit Name:
2. Reporting Period: March 1, 1982-March 31, 1982
3. Licensed Thennal Power IN!Wt):

3 411 1 220

4. Nameplate Rating (Grow SlWe g 1 180
5. Design Electrical Rating (Net.stWen
6. 31asimum Dependable Capacity (Grow.\\1We):
7. hlasimum Dependable Capacity (Net.\\lhe):
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Lesel To which Restricted. If Any tNet >!We):
10. Reasons For Restrictions. If Any:

This 51onth Yr..to.Date Cumulative 744.0 2 160.0 2 904.0

11. Ilours in Reporting Period 315.9 1 583.0 1 628.7
12. Number Of Hours Reactor % Critical
13. Reactor Resene Shutdown llours
14. Ilours Generator On-Line 312.8 1 567.5 1 613.2
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated OlWH) 530 357 2 858 574 2 943 529
17. Grow Electrical Energy Generated (31Wil) 176 700 959 591 988 027 160 576 893 029 912 085
18. Net Electrical Energy Generated (N!WH) 42.0 72.6 55.6
19. Unit Service Factor
20. Unit Asailability Factor 42.0 72.6 55.6
21. Unit Capacity Factor IUsing.\\lDC Neti 1R.3 35.0 26.6
22. Unit Capacity Factor (Usm; DER Net) 24.4 46.7 35.5
23. Unit Forced Outace Rate 58.0 27.4 44.5
24. Shutdowns Scheduled Oser Nest 6 \\1onths (Type. Date,and Duration of Each t:

Eddy Current Testing - June 18 - 3 weeks

25. If Shut Down \\t End Of Report Permd. Estim.ited Date of Startup:
26. Units in Test Status tPrmr to Commercul Operation):

Forecast Achiesed 1NITI \\ L CRITICAlll Y INilI A L 1.LITl RICIIV COT 1.\\1l.RCIT L OPl.R A flON 8204190303 820415 PDR ADOCK 05000369 N/773 R

PDR J

=

UNIT SilUTDOWNS AND POWER REDUCllONS DOCKET NO.

50-369 UNil NAhf E McGuire 1 DATE 4-15-82 March, 1982 COMPLETED fly J. A.

Reavis REPORT Af0NTII TELEPIIONE (704)373-8552 I

n.

E E

3?

3

$ E5 Licensee

,E-t, Cause & Cor rective g

No.

Date g

3g j

jgy Event g7 93 Actiam to

$5 d

j if3 g Repost a m' U j'

Prevent Recurrente 6

9A 82-03-01 F

431.25 B

CB HTEXCH Eddy current inspection of steam generator tubes in progress.

5-p 82-03-20 F

B ZZ ZZZZZZ Holding at 75% power to complete steam generator flow test readings.

6p 82-03-20 F

H CB HTEXCH Reduced to 50% power awaiting further analysis of steam generator condition.

I 2

3 4

F: Fmeed Reason:

Mettuid:

lixliibit G - Instructiims S: Sclicif uleil A Et[uipment Failure (Explain) 141.mual for Preparatnen of Data Il4taintenance of Test 24tanual Scram.

lintry Slicets for 1.ieensee C.Refacting 3 Automatic Sci.im.

Event Report (I.LRI File int!RI:G.

D. Regulatory Resirietion 4 O her(Explain) 0161) 1: Ope.ator Training & License Examination F Administrative 5

G Opciational liiror (Espl.iin)

Esinbit 1 -Same Source (9/77) lI-Other ( Explain) l

AVERAGE D Al).Y L* NIT ?OWER LEVEL OCCKET NO, 50-369 LNIT McGuire #1 4 82 OATE COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 310 NTH March, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER.4GE D41LY ?OWER :.EVEL (5the-Neti v 3f we.Ner:

I 17 2

13 J

451 19 4

556

o 5-518 21

~

22 524 7

537 23 3

536 24 9

25 539 10 536 25 1!

535 12 23 535 l'

541 29 14 545 30 15 545 31 16

!NSTRL'CTICNS Cn t.".:s (c r: sc. [is t :,s.e y,,7:g,-,,80.... it ;';w er 'e. e ;3 *,l*,v

.N,,

.,,,3*.,

,3*.

e'

" ' 7 * - ;, -.., ;

,_, Ud 3f 11.b nete,,e g:w:g.

g;3

.. - g

R MONTHLY REFUELING INFORMATION RE00EST 1.

Facility name:

McGuire Unit 1 2.

Scheduled next refueling shutdcwn:

June, 1983 3.

Scheduled restart following refueling:

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

i i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A If no, when is review scheduled?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion:

N/A 6.

I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

N/A 7.

Number of fuel asse=blies (a) in the core:

193 (b) in the spent fuel pool:

23 500 8.

Present licensed fuel pool capacity:

Size of requested or planned increase:

9.

Projected date of last refueling which can be accoc=odated by present licensed capacity:

I J

A ril 15, 1982 l

DUKE PC'4ER COMPANY Date:

P I

Name of Contact :

J. A. Reavis 4

DOCKET NO:

50-369 UNIT:

McGuire Unit 1 DATE:

April 15, 1982 NARRATIVE sum!ARY Month: March, 1982 McGuire 1 began the month of March in an outage for eddy current inspection of the steam generator tubes. The steam generator tube inspection and other maintenance was completed and the unit returned to service on March 18 at 2315.

Steam generator flow test readings were recorded to the 75% power level.

After completion of the test readings, the unit was reduced to 50% power and continued the remainder of the month awaiting further analysis of steam generator condition.

F l

I l

l

{

l I

{

1 1

I

McCUIRE NUCLEAR STATION Operating Status Report 1.

Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of their allowable annual rad'ation dose limit.

2.

The total station liquid release contribution to whole body dose for February has been compared with the Technical Specifications annual value of 3 mrem; the total release for February was less than 10 percent of this limit.

The total station gaseous release contribution to any organ dose for February has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for February was less than 10 percent of this limit.

-.