MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2401998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8201998-06-30030 June 1998 Monthly Operating Repts for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236F0381998-05-31031 May 1998 Monthly Operating Repts for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8251998-05-31031 May 1998 Revised MOR for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247K3851998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for McGuire Nuclear Station ML20247L5981998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0681998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247L6181998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E3991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0811998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1997 for McGuire Nuclear Station,Units 1 & 2 ML20202G7531998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E4111998-01-31031 January 1998 Rev 1 to Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20202G7741997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station,Units 1 & 2 ML20198P2521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station ML20203H6491997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for McGuire Nuclear Station,Units 1 & 2 ML20199D3221997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station ML20203H6601997-10-31031 October 1997 Revised Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station,Units 1 & 2 ML20211P9841997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for McGuire Nuclear Station ML20216K1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2 ML20216K1561997-07-31031 July 1997 Revised Monthly Operating Status Rept for Jul 1997 for McGuire Nuclear Station,Units 1 & 2 ML20210L0691997-07-31031 July 1997 Monthly Operating Repts for July 1997 for MNS ML20149F2421997-06-30030 June 1997 Monthly Operating Repts for June 1997 for McGuire Nuclear Station,Units 1 & 2 ML20140H1171997-05-31031 May 1997 Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
Text
, n _
, ~ w-OPERATING DATA REPORT DOCKET NO. 50-369 DATE 4- N C051PLETED BY J.A. Reavis TELEPilONE 704-373-8552 OPERATING ST.\TUS McGuire #1 Notes
- 1. Unit Name:
- 2. Reporting Period: March 1, 1982-March 31, 1982
- 3. Licensed Thennal Power IN!Wt): 3 411
- 4. Nameplate Rating (Grow SlWe g 1 220
- 5. Design Electrical Rating (Net .stWen 1 180
- 6. 31asimum Dependable Capacity (Grow .\1We):
- 7. hlasimum Dependable Capacity (Net .\lhe): !
- 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Lesel To which Restricted. If Any tNet >!We):
- 10. Reasons For Restrictions. If Any:
This 51onth Yr..to.Date Cumulative
- 11. Ilours in Reporting Period 744.0 2 160.0 2 904.0
- 12. Number Of Hours Reactor % Critical 315.9 1 583.0 1 628.7
- 13. Reactor Resene Shutdown llours
- 14. Ilours Generator On-Line 312.8 1 567.5 1 613.2
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated OlWH) 530 357 2 858 574 2 943 529 -
- 17. Grow Electrical Energy Generated (31Wil) 176 700 959 591 988 027
- 18. Net Electrical Energy Generated (N!WH) 160 576 893 029 912 085
- 19. Unit Service Factor 42.0 72.6 55.6
- 20. Unit Asailability Factor 42.0 72.6 55.6
- 21. Unit Capacity Factor IUsing .\lDC Neti 1R.3 35.0 26.6
- 22. Unit Capacity Factor (Usm; DER Net) 24.4 46.7 35.5
- 23. Unit Forced Outace Rate 58.0 27.4 44.5
- 24. Shutdowns Scheduled Oser Nest 6 \1onths (Type. Date,and Duration of Each t:
Eddy Current Testing - June 18 - 3 weeks
- 25. If Shut Down \t End Of Report Permd. Estim.ited Date of Startup:
- 26. Units in Test Status tPrmr to Commercul Operation): Forecast Achiesed 1NITI \ L CRITICAlll Y INilI A L 1.LITl RICIIV COT 1.\1l.RCIT L OPl.R A flON 8204190303 820415 PDR ADOCK 05000369 N/773 R PDR J
=
DOCKET NO. 50-369 .
UNIT SilUTDOWNS AND POWER REDUCllONS UNil NAhf E McGuire 1 DATE 4-15-82 March, 1982 COMPLETED fly J. A. Reavis REPORT Af0NTII (704)373-8552 TELEPIIONE I
n.
_ E E
-, 3? 3j $ E5 jgy Licensee ,E-t, *%
g Cause & Cor rective No. Date g 3g Event g7 93 Actiam to
$5 d j if3 g Repost a m' U j' Prevent Recurrente 6
9A 82-03-01 F 431.25 B --
CB HTEXCH Eddy current inspection of steam generator tubes in progress.
5-p 82-03-20 F --
B --
ZZ ZZZZZZ Holding at 75% power to complete steam ,
generator flow test readings.
6p 82-03-20 F --
H --
CB HTEXCH Reduced to 50% power awaiting further analysis of steam generator condition.
I 2 3 4 F: Fmeed Reason: Mettuid: lixliibit G - Instructiims S: Sclicif uleil A Et[uipment Failure (Explain) 141.mual for Preparatnen of Data Il4taintenance of Test 24tanual Scram. lintry Slicets for 1.ieensee C.Refacting 3 Automatic Sci.im. Event Report (I.LRI File int!RI:G.
D. Regulatory Resirietion 4 O her(Explain) 0161) 1: Ope.ator Training & License Examination F Administrative 5 G Opciational liiror (Espl.iin) Esinbit 1 -Same Source (9/77) lI-Other ( Explain) l
AVERAGE D Al).Y L* NIT ?OWER LEVEL 1
1 OCCKET NO, 50-369 LNIT McGuire #1 4 82 OATE COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 310 NTH March, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER.4GE D41LY ?OWER :.EVEL (5the-Neti v 3f we.Ner:
I 17 2 -
13 J 451 19 4 556
- o 5- 21 518
~
22 524 7
23 537 3 536 24 9 539 25 10 536 25 1! 535 12 535 23 l'
29 541 14 30 545 15 31 545 16
!NSTRL'CTICNS Cn t.".:s (c r: sc . [is t :,s.e y,,7:g,- ,,80. .. . it ;';w er 'e . e ;3 *,l*,v e'.N,,-
,3*.,
- .- ,3*.
" ' 7 * - ;, - . ., ;
. .. g;3 ,. , ,
,_,- Ud 3f 11.b nete , ,e g:w:g.
.. - g
R MONTHLY REFUELING INFORMATION RE00EST
- 1. Facility name: McGuire Unit 1 .
- 2. Scheduled next refueling shutdcwn: June, 1983 .
- 3. Scheduled restart following refueling: .
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? .
< If yes, what will these be?
i i
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A -
If no, when is review scheduled? N/A -
- 5. Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion: N/A ,
- 6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A
- 7. Number of fuel asse=blies (a) in the core: 193 .
(b) in the spent fuel pool: 23 -
- 8. Present licensed fuel pool capacity: 500 Size of requested or planned increase: .
- 9. Projected date of last refueling which can be accoc=odated by present licensed capacity: .
I J
DUKE PC'4ER COMPANY Date: A Pril 15, 1982 l
I Name of Contact : J. A. Reavis .
4
DOCKET NO: 50-369 UNIT: McGuire Unit 1 DATE: April 15, 1982 NARRATIVE sum!ARY Month: March, 1982 McGuire 1 began the month of March in an outage for eddy current inspection of the steam generator tubes. The steam generator tube inspection and other maintenance was completed and the unit returned to service on March 18 at 2315.
Steam generator flow test readings were recorded to the 75% power level.
After completion of the test readings, the unit was reduced to 50% power and continued the remainder of the month awaiting further analysis of steam generator condition.
F l
I l
l
{
l I
{
1 1
I
McCUIRE NUCLEAR STATION Operating Status Report
- 1. Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of their allowable annual rad'ation dose limit.
- 2. The total station liquid release contribution to whole body dose for February has been compared with the Technical Specifications annual value of 3 mrem; the total release for February was less than 10 percent of this limit.
The total station gaseous release contribution to any organ dose for February has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for February was less than 10 percent of this limit.
-.