Text

, n _

, ~ w-OPERATING DATA REPORT DOCKET NO. 50-369 DATE 4- N C051PLETED BY J.A. Reavis TELEPilONE 704-373-8552 OPERATING ST.\TUS McGuire #1 Notes

1. Unit Name:
2. Reporting Period: March 1, 1982-March 31, 1982
3. Licensed Thennal Power IN!Wt): 3 411
4. Nameplate Rating (Grow SlWe g 1 220
5. Design Electrical Rating (Net .stWen 1 180
6. 31asimum Dependable Capacity (Grow .\1We):
7. hlasimum Dependable Capacity (Net .\lhe):  !
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Lesel To which Restricted. If Any tNet >!We):
10. Reasons For Restrictions. If Any:

This 51onth Yr..to.Date Cumulative

11. Ilours in Reporting Period 744.0 2 160.0 2 904.0
12. Number Of Hours Reactor % Critical 315.9 1 583.0 1 628.7
13. Reactor Resene Shutdown llours
14. Ilours Generator On-Line 312.8 1 567.5 1 613.2
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated OlWH) 530 357 2 858 574 2 943 529 -
17. Grow Electrical Energy Generated (31Wil) 176 700 959 591 988 027
18. Net Electrical Energy Generated (N!WH) 160 576 893 029 912 085
19. Unit Service Factor 42.0 72.6 55.6
20. Unit Asailability Factor 42.0 72.6 55.6
21. Unit Capacity Factor IUsing .\lDC Neti 1R.3 35.0 26.6
22. Unit Capacity Factor (Usm; DER Net) 24.4 46.7 35.5
23. Unit Forced Outace Rate 58.0 27.4 44.5
24. Shutdowns Scheduled Oser Nest 6 \1onths (Type. Date,and Duration of Each t:

Eddy Current Testing - June 18 - 3 weeks

25. If Shut Down \t End Of Report Permd. Estim.ited Date of Startup:
26. Units in Test Status tPrmr to Commercul Operation): Forecast Achiesed 1NITI \ L CRITICAlll Y INilI A L 1.LITl RICIIV COT 1.\1l.RCIT L OPl.R A flON 8204190303 820415 PDR ADOCK 05000369 N/773 R PDR J

=

DOCKET NO. 50-369 .

UNIT SilUTDOWNS AND POWER REDUCllONS UNil NAhf E McGuire 1 DATE 4-15-82 March, 1982 COMPLETED fly J. A. Reavis REPORT Af0NTII (704)373-8552 TELEPIIONE I

n.

_ E E

-, 3? 3j $ E5 jgy Licensee ,E-t, *%

g Cause & Cor rective No. Date g 3g Event g7 93 Actiam to

$5 d j if3 g Repost a m' U j' Prevent Recurrente 6

9A 82-03-01 F 431.25 B --

CB HTEXCH Eddy current inspection of steam generator tubes in progress.

5-p 82-03-20 F --

B --

ZZ ZZZZZZ Holding at 75% power to complete steam ,

generator flow test readings.

6p 82-03-20 F --

H --

CB HTEXCH Reduced to 50% power awaiting further analysis of steam generator condition.

I 2 3 4 F: Fmeed Reason: Mettuid: lixliibit G - Instructiims S: Sclicif uleil A Et[uipment Failure (Explain) 141.mual for Preparatnen of Data Il4taintenance of Test 24tanual Scram. lintry Slicets for 1.ieensee C.Refacting 3 Automatic Sci.im. Event Report (I.LRI File int!RI:G.

D. Regulatory Resirietion 4 O her(Explain) 0161) 1: Ope.ator Training & License Examination F Administrative 5 G Opciational liiror (Espl.iin) Esinbit 1 -Same Source (9/77) lI-Other ( Explain) l

AVERAGE D Al).Y L* NIT ?OWER LEVEL 1

1 OCCKET NO, 50-369 LNIT McGuire #1 4 82 OATE COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 310 NTH March, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER.4GE D41LY ?OWER :.EVEL (5the-Neti v 3f we.Ner:

I 17 2 -

13 J 451 19 4 556

o 5- 21 518

~

22 524 7

23 537 3 536 24 9 539 25 10 536 25 1! 535 12 535 23 l'

29 541 14 30 545 15 31 545 16

!NSTRL'CTICNS Cn t.".:s (c r: sc . [is t :,s.e y,,7:g,- ,,80. .. . it ;';w er 'e . e ;3 *,l*,v e'.N,,-

,3*.,

- .- ,3*.

" ' 7 * - ;, - . ., ;

. .. g;3 ,. , ,

,_,- Ud 3f 11.b nete , ,e g:w:g.

.. - g

R MONTHLY REFUELING INFORMATION RE00EST

1. Facility name: McGuire Unit 1 .
2. Scheduled next refueling shutdcwn: June, 1983 .
3. Scheduled restart following refueling: .
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? .

< If yes, what will these be?

i i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A -

If no, when is review scheduled? N/A -

5. Scheduled date(s) for submitting proposed licensing action and supporting inf o rma tion: N/A ,
6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A
7. Number of fuel asse=blies (a) in the core: 193 .

(b) in the spent fuel pool: 23 -

8. Present licensed fuel pool capacity: 500 Size of requested or planned increase: .
9. Projected date of last refueling which can be accoc=odated by present licensed capacity: .

I J

DUKE PC'4ER COMPANY Date: A Pril 15, 1982 l

I Name of Contact : J. A. Reavis .

4

DOCKET NO: 50-369 UNIT: McGuire Unit 1 DATE: April 15, 1982 NARRATIVE sum!ARY Month: March, 1982 McGuire 1 began the month of March in an outage for eddy current inspection of the steam generator tubes. The steam generator tube inspection and other maintenance was completed and the unit returned to service on March 18 at 2315.

Steam generator flow test readings were recorded to the 75% power level.

After completion of the test readings, the unit was reduced to 50% power and continued the remainder of the month awaiting further analysis of steam generator condition.

F l

I l

l

{

l I

{

1 1

I

McCUIRE NUCLEAR STATION Operating Status Report

1. Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of their allowable annual rad'ation dose limit.
2. The total station liquid release contribution to whole body dose for February has been compared with the Technical Specifications annual value of 3 mrem; the total release for February was less than 10 percent of this limit.

The total station gaseous release contribution to any organ dose for February has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for February was less than 10 percent of this limit.

-.