ML20058H116: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
NOTICE OF VIOLATION Wisconsin Electric Power Company                     Docket Nos. 50-266; 50-301 Point Beach Nuclear Plant                           Licenses No. DPR-24;-DPR-27 As a result of the inspection conducted from September 5 through October 15,.
NOTICE OF VIOLATION Wisconsin Electric Power Company Docket Nos. 50-266; 50-301 Point Beach Nuclear Plant Licenses No. DPR-24;-DPR-27 As a result of the inspection conducted from September 5 through October 15,.
1990, ar.d in accordance with the " General Statement of Policy and Procedure forKRCEnforcementActions,"10CFRPart2,AppendixC(1989)(Enforcement Policy) the following violation was identified:
1990, ar.d in accordance with the " General Statement of Policy and Procedure forKRCEnforcementActions,"10CFRPart2,AppendixC(1989)(Enforcement Policy) the following violation was identified:
10 CFR 50,73, " Licensee Event Report System," requires that the licensee shall submit a Licensee Event Report (LER) for any type of event described in this     ;
10 CFR 50,73, " Licensee Event Report System," requires that the licensee shall submit a Licensee Event Report (LER) for any type of event described in this parograph within 30 deys af ter the discovery of the event.
parograph within 30 deys af ter the discovery of the event. Sectiona.2.(iv) of this paragraph specifies that an LER is required for any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature, including the Reactor Protection System.
Sectiona.2.(iv) of this paragraph specifies that an LER is required for any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature, including the Reactor Protection System.
Contrary to the above, on October 8,1989, an inadvertent actuation of the Reactor Protection System occurred when two out of three containment pressure bistables were tripped. This event was not reported until October 11, 1990,     ,
Contrary to the above, on October 8,1989, an inadvertent actuation of the Reactor Protection System occurred when two out of three containment pressure bistables were tripped.
over one year from the date of the occurrence.                                   ,
This event was not reported until October 11, 1990, over one year from the date of the occurrence.
This is a Severity Level V violation (Supplement 1).
This is a Severity Level V violation (Supplement 1).
I l
I l
The inspection shcwed that actions had been taken to correct the identified violation and to prevent recurrence. Consequently, no reply to the violation is required and we have no further questions regarding this matter.
The inspection shcwed that actions had been taken to correct the identified violation and to prevent recurrence.
OCT 301990 Dated Me Q C Richard C. Knop, Chief Reactor Projects Branch 3 i
Consequently, no reply to the violation is required and we have no further questions regarding this matter.
OCT 301990 Me Q C Dated Richard C. Knop, Chief Reactor Projects Branch 3 i
i r
i r
F 9011U60262 901030 PDR  ADOCK 05000266 PDC 0                                                                         [}}
F 9011U60262 901030 ADOCK 05000266 PDR PDC 0
[}}

Latest revision as of 09:08, 17 December 2024

Notice of Violation from Insp on 900905-1015.Violation Noted:Inadvertent Actuation of RPS Occurred When Two of Three Containment Pressure Bistables Tripped & Was Not Reported Until 901011,over One Yr from Date of Occurrence
ML20058H116
Person / Time
Site: Point Beach  
Issue date: 10/30/1990
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20058H113 List:
References
50-266-90-19, 50-301-90-19, NUDOCS 9011140262
Download: ML20058H116 (1)


Text

.

NOTICE OF VIOLATION Wisconsin Electric Power Company Docket Nos. 50-266; 50-301 Point Beach Nuclear Plant Licenses No. DPR-24;-DPR-27 As a result of the inspection conducted from September 5 through October 15,.

1990, ar.d in accordance with the " General Statement of Policy and Procedure forKRCEnforcementActions,"10CFRPart2,AppendixC(1989)(Enforcement Policy) the following violation was identified:

10 CFR 50,73, " Licensee Event Report System," requires that the licensee shall submit a Licensee Event Report (LER) for any type of event described in this parograph within 30 deys af ter the discovery of the event.

Sectiona.2.(iv) of this paragraph specifies that an LER is required for any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature, including the Reactor Protection System.

Contrary to the above, on October 8,1989, an inadvertent actuation of the Reactor Protection System occurred when two out of three containment pressure bistables were tripped.

This event was not reported until October 11, 1990, over one year from the date of the occurrence.

This is a Severity Level V violation (Supplement 1).

I l

The inspection shcwed that actions had been taken to correct the identified violation and to prevent recurrence.

Consequently, no reply to the violation is required and we have no further questions regarding this matter.

OCT 301990 Me Q C Dated Richard C. Knop, Chief Reactor Projects Branch 3 i

i r

F 9011U60262 901030 ADOCK 05000266 PDR PDC 0

[