{{#Wiki_filter:OFFICIAL RECORD COPY
{{#Wiki_filter:OFFICIAL RECORD COPY
  ( ..
(
      ,
..
                                            MAY Z 51982
,
    Docket NoQ0-280 and 50-281
MAY Z 51982
    Virginia Electric and Power Company
Docket NoQ0-280 and 50-281
    ATTN: Mr. R. H. Leasburg, Vice President
Virginia Electric and Power Company
                Nuclear Operations
ATTN: Mr. R. H. Leasburg, Vice President
    P. O. Box 26666
Nuclear Operations
    Richmond, VA 23261
P. O. Box 26666
    Gentlemen:
Richmond, VA 23261
    To verify that licensees have attained an adequate state of onsite emergency
Gentlemen:
    preparedness, the Office of Ir.spection and Enforcement is conducting special
To verify that licensees have attained an adequate state of onsite emergency
    appraisals at each power reactor site. These appraisals are being performed in
preparedness, the Office of Ir.spection and Enforcement is conducting special
    lieu of certain routine inspections normally conducted in the area of emergency
appraisals at each power reactor site. These appraisals are being performed in
    preparedness. The objectives of the appraisal at each facility are to evaluate
lieu of certain routine inspections normally conducted in the area of emergency
    the overall adequacy and effectiveness of emergency preparedness and to identify
preparedness. The objectives of the appraisal at each facility are to evaluate
    areas of weakness that need to be strengthened. We will use the findings from
the overall adequacy and effectiveness of emergency preparedness and to identify
    these appraisals as a basis not only for requesting individual applicant and
areas of weakness that need to be strengthened. We will use the findings from
    licensee action to correct deficiencies and effect improvements, but also for
these appraisals as a basis not only for requesting individual applicant and
    effecting improvements in NRC requirements and guidance.
licensee action to correct deficiencies and effect improvements, but also for
    During the period of March 15-26, 1982, the NRC conducted an appraisal of the
effecting improvements in NRC requirements and guidance.
    emergency preparedness program at the Surry Power Station Units 1 and 2.   Areas
During the period of March 15-26, 1982, the NRC conducted an appraisal of the
    examined during this appraisal are described in the enclosed report (50-280,
emergency preparedness program at the Surry Power Station Units 1 and 2.
    281/82-05). Within these areas, the appraisal team reviewed selected procedures
Areas
    an_d representative records, inspected emergency facilities and equipment,
examined during this appraisal are described in the enclosed report (50-280,
    observed work practices, and interviewed personnel.
281/82-05). Within these areas, the appraisal team reviewed selected procedures
    Emergency preparedness deficiencies identified during this appraisal, for which
an_d representative records, inspected emergency facilities and equipment,
    you have made acceptable commitments to resolve, were discussed in our confirma-
observed work practices, and interviewed personnel.
    tory letter (Appendix A) dated April 6,1982. If the deficiencies addressed in
Emergency preparedness deficiencies identified during this appraisal, for which
    the confirmatory letter are not corrected by the commitment dates, enforcement
you have made acceptable commitments to resolve, were discussed in our confirma-
    action will be considered.
tory letter (Appendix A) dated April 6,1982.
    Further review of this emergency preparedness appraisal also indicates that there
If the deficiencies addressed in
    are other areas that should be evaluated and considered for improvement in your
the confirmatory letter are not corrected by the commitment dates, enforcement
    emergency preparedness program.     These areas are identified in Appendix B,
action will be considered.
    " Preparedness Improvement Items", and are discussed in the body of the enclosed
Further review of this emergency preparedness appraisal also indicates that there
    report.
are other areas that should be evaluated and considered for improvement in your
    8208030546 820727
emergency preparedness program.
    0PDR ADOCK 05000280
These areas are identified in Appendix
                        PDR
B,
" Preparedness Improvement Items", and are discussed in the body of the enclosed
report.
8208030546 820727
PDR ADOCK 05000280
0
PDR
.
.


                                                                                    -
-
'   *
'
                                                                        MAY 2 51982
*
  Virginia Electric and Power Company       2
MAY 2 51982
  We recognize that an explicit regulatory requirement pertaining to each item
Virginia Electric and Power Company
  identified in Appendix B may not currently exist. Notwithstanding this, you are
2
  requested to submit a written statement within thirty (30) days of the date of
We recognize that an explicit regulatory requirement pertaining to each item
  this letter, describing the results of your consideration of each of the items in
identified in Appendix B may not currently exist. Notwithstanding this, you are
  Appendix B.     This request is made pursuant to Section 50.54(f) of Part 50,
requested to submit a written statement within thirty (30) days of the date of
  Title 10, Code of Federal Regulations.
this letter, describing the results of your consideration of each of the items in
  In conjunction with the aforementioned appraisal, the emergency plan for your
Appendix B.
  facility was reviewed. The results of this review, included as Appendix C,
This request is made pursuant to Section 50.54(f) of Part 50,
  indicate that certain areas of your pian do not contain sufficient information
Title 10, Code of Federal Regulations.
  to demonstrate compliance with the planning standards of 10CFR50.47(b). The
In conjunction with the aforementioned appraisal, the emergency plan for your
  plan changes for correcting each deficiency are to be provided to this office
facility was reviewed.
  upon issuance or, at the latest, within 120 days of this letter. Copies of
The results of this review, included as Appendix C,
  these changes are to be submitted in accordance with the procedures delineated
indicate that certain areas of your pian do not contain sufficient information
  in 10CFR50.54(q) .
to demonstrate compliance with the planning standards of 10CFR50.47(b).
  In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
The
  will be placed in the NRC's Public Document Room unless you notify this office,
plan changes for correcting each deficiency are to be provided to this office
  by telephone, within ten days of the date of this letter and submit written
upon issuance or, at the latest, within 120 days of this letter.
  application to withhold information contained therein within thirty days of the
Copies of
  date of this letter. Such application must be consistent with the requirements
these changes are to be submitted in accordance with the procedures delineated
  of 10 CFR 2.790(b)(1).
in 10CFR50.54(q) .
  The responses directed by this letter and the enclosures are not subject to the
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
  clearance procedures of the Office of Management and Budget as required by the
will be placed in the NRC's Public Document Room unless you notify this office,
  Paperwork Reduction Act of 1980, PL 96-511.                 '
by telephone, within ten days of the date of this letter and submit written
  Should you have any questions concerning this appraisal, we will be pleased to
application to withhold information contained therein within thirty days of the
  discuss them with you.
date of this letter. Such application must be consistent with the requirements
                                        Sincerely,
of 10 CFR 2.790(b)(1).
                                        James P. O'Reilly
The responses directed by this letter and the enclosures are not subject to the
                                        Regional Administrator
clearance procedures of the Office of Management and Budget as required by the
  Enclosures:
Paperwork Reduction Act of 1980, PL 96-511.
  1.     Appendix A, Confirmation of Action
'
          Letter April 6,1982
Should you have any questions concerning this appraisal, we will be pleased to
  2.     Appendix B, Preparedness Improvement Items
discuss them with you.
  3.     Appendix C, Emergency Plan Deficiencies
Sincerely,
  4.     Inspection Report Nos. 50-280, 281/82-05
James P. O'Reilly
  cc w/ encl:
Regional Administrator
  J. H. Ferguson, Executive
Enclosures:
      Vice President-Power
1.
  J. L. Wilson, Station Manager
Appendix A, Confirmation of Action
  P. G. Godwin, Director, Nuclear Security
Letter April 6,1982
2.
Appendix B, Preparedness Improvement Items
3.
Appendix C, Emergency Plan Deficiencies
4.
Inspection Report Nos. 50-280, 281/82-05
cc w/ encl:
J. H. Ferguson, Executive
Vice President-Power
J. L. Wilson, Station Manager
P. G. Godwin, Director, Nuclear Security


                                                                                  ,
,
MAY L 5 i982
-
-
  ,
c
    c
,
      ,
,
                                                                    MAY L 5 i982
Virginia Electric and Power Company
    Virginia Electric and Power Company       3
3
    bec w/ encl:
bec w/ encl:
    Document Management Branch
Document Management Branch
    Commonwealth of Virginia
Commonwealth of Virginia
    IE:DEP B. Grimes /D. Matthews
IE:DEP B. Grimes /D. Matthews
    NRC Resident Inspector
NRC Resident Inspector
    RII
RII
          &
RI
        itwan:ejw
RII
                      RI
IE:HQ
                      GRJ kins
RII
                                    RII        IE:HQ
&
                                                  607/F
607/F
                                    JPS ohr AFPagano
fp
                                                          RII
itwan:ejw
                                                              fp
GRJ kins
                                                          HC0ance
JPS ohr AFPagano
    5/2.(/82           5/j[/82     5/2 (/82 1 5/z(/82     5/
HC0ance
                                              a t rev idau,, 2l /82
5/2.(/82
                                              s/ b. ILfla.a
5/j[/82
                                                e r J~/ 9/et
5/ (/82 1 a t rev idau,, 2l /82
5/z(/82
5/
2
s/ b. ILfla.a
e r J~/ 9/et
}}
}}

Latest revision as of 09:04, 17 December 2024

Forwards IE Emergency Preparedness Appraisal Repts 50-280/82-05 & 50-281/82-05 on 820315-26.Planned Changes for Correcting Each Deficiency Due within 120 Days of Receipt of Ltr
ML20058H330
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/25/1982
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20058H245 List:
References
NUDOCS 8208030546
Download: ML20058H330 (3)


See also: IR 05000280/1982005

Text

OFFICIAL RECORD COPY

(

..

,

MAY Z 51982

Docket NoQ0-280 and 50-281

Virginia Electric and Power Company

ATTN: Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

To verify that licensees have attained an adequate state of onsite emergency

preparedness, the Office of Ir.spection and Enforcement is conducting special

appraisals at each power reactor site. These appraisals are being performed in

lieu of certain routine inspections normally conducted in the area of emergency

preparedness. The objectives of the appraisal at each facility are to evaluate

the overall adequacy and effectiveness of emergency preparedness and to identify

areas of weakness that need to be strengthened. We will use the findings from

these appraisals as a basis not only for requesting individual applicant and

licensee action to correct deficiencies and effect improvements, but also for

effecting improvements in NRC requirements and guidance.

During the period of March 15-26, 1982, the NRC conducted an appraisal of the

emergency preparedness program at the Surry Power Station Units 1 and 2.

Areas

examined during this appraisal are described in the enclosed report (50-280,

281/82-05). Within these areas, the appraisal team reviewed selected procedures

an_d representative records, inspected emergency facilities and equipment,

observed work practices, and interviewed personnel.

Emergency preparedness deficiencies identified during this appraisal, for which

you have made acceptable commitments to resolve, were discussed in our confirma-

tory letter (Appendix A) dated April 6,1982.

If the deficiencies addressed in

the confirmatory letter are not corrected by the commitment dates, enforcement

action will be considered.

Further review of this emergency preparedness appraisal also indicates that there

are other areas that should be evaluated and considered for improvement in your

emergency preparedness program.

These areas are identified in Appendix

B,

" Preparedness Improvement Items", and are discussed in the body of the enclosed

report.

8208030546 820727

PDR ADOCK 05000280

0

PDR

.

-

'

MAY 2 51982

Virginia Electric and Power Company

2

We recognize that an explicit regulatory requirement pertaining to each item

identified in Appendix B may not currently exist. Notwithstanding this, you are

requested to submit a written statement within thirty (30) days of the date of

this letter, describing the results of your consideration of each of the items in

Appendix B.

This request is made pursuant to Section 50.54(f) of Part 50,

Title 10, Code of Federal Regulations.

In conjunction with the aforementioned appraisal, the emergency plan for your

facility was reviewed.

The results of this review, included as Appendix C,

indicate that certain areas of your pian do not contain sufficient information

to demonstrate compliance with the planning standards of 10CFR50.47(b).

The

plan changes for correcting each deficiency are to be provided to this office

upon issuance or, at the latest, within 120 days of this letter.

Copies of

these changes are to be submitted in accordance with the procedures delineated

in 10CFR50.54(q) .

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

'

Should you have any questions concerning this appraisal, we will be pleased to

discuss them with you.

Sincerely,

James P. O'Reilly

Regional Administrator

Enclosures:

1.

Appendix A, Confirmation of Action

Letter April 6,1982

2.

Appendix B, Preparedness Improvement Items

3.

Appendix C, Emergency Plan Deficiencies

4.

Inspection Report Nos. 50-280, 281/82-05

cc w/ encl:

J. H. Ferguson, Executive

Vice President-Power

J. L. Wilson, Station Manager

P. G. Godwin, Director, Nuclear Security

,

MAY L 5 i982

-

c

,

,

Virginia Electric and Power Company

3

bec w/ encl:

Document Management Branch

Commonwealth of Virginia

IE:DEP B. Grimes /D. Matthews

NRC Resident Inspector

RII

RI

RII

IE:HQ

RII

&

607/F

fp

itwan:ejw

GRJ kins

JPS ohr AFPagano

HC0ance

5/2.(/82