ML20058H330
| ML20058H330 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/25/1982 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML20058H245 | List: |
| References | |
| NUDOCS 8208030546 | |
| Download: ML20058H330 (3) | |
See also: IR 05000280/1982005
Text
OFFICIAL RECORD COPY
(
..
,
MAY Z 51982
Docket NoQ0-280 and 50-281
Virginia Electric and Power Company
ATTN: Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
To verify that licensees have attained an adequate state of onsite emergency
preparedness, the Office of Ir.spection and Enforcement is conducting special
appraisals at each power reactor site. These appraisals are being performed in
lieu of certain routine inspections normally conducted in the area of emergency
preparedness. The objectives of the appraisal at each facility are to evaluate
the overall adequacy and effectiveness of emergency preparedness and to identify
areas of weakness that need to be strengthened. We will use the findings from
these appraisals as a basis not only for requesting individual applicant and
licensee action to correct deficiencies and effect improvements, but also for
effecting improvements in NRC requirements and guidance.
During the period of March 15-26, 1982, the NRC conducted an appraisal of the
emergency preparedness program at the Surry Power Station Units 1 and 2.
Areas
examined during this appraisal are described in the enclosed report (50-280,
281/82-05). Within these areas, the appraisal team reviewed selected procedures
an_d representative records, inspected emergency facilities and equipment,
observed work practices, and interviewed personnel.
Emergency preparedness deficiencies identified during this appraisal, for which
you have made acceptable commitments to resolve, were discussed in our confirma-
tory letter (Appendix A) dated April 6,1982.
If the deficiencies addressed in
the confirmatory letter are not corrected by the commitment dates, enforcement
action will be considered.
Further review of this emergency preparedness appraisal also indicates that there
are other areas that should be evaluated and considered for improvement in your
emergency preparedness program.
These areas are identified in Appendix
B,
" Preparedness Improvement Items", and are discussed in the body of the enclosed
report.
8208030546 820727
PDR ADOCK 05000280
0
.
-
'
MAY 2 51982
Virginia Electric and Power Company
2
We recognize that an explicit regulatory requirement pertaining to each item
identified in Appendix B may not currently exist. Notwithstanding this, you are
requested to submit a written statement within thirty (30) days of the date of
this letter, describing the results of your consideration of each of the items in
Appendix B.
This request is made pursuant to Section 50.54(f) of Part 50,
Title 10, Code of Federal Regulations.
In conjunction with the aforementioned appraisal, the emergency plan for your
facility was reviewed.
The results of this review, included as Appendix C,
indicate that certain areas of your pian do not contain sufficient information
to demonstrate compliance with the planning standards of 10CFR50.47(b).
The
plan changes for correcting each deficiency are to be provided to this office
upon issuance or, at the latest, within 120 days of this letter.
Copies of
these changes are to be submitted in accordance with the procedures delineated
in 10CFR50.54(q) .
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
'
Should you have any questions concerning this appraisal, we will be pleased to
discuss them with you.
Sincerely,
James P. O'Reilly
Regional Administrator
Enclosures:
1.
Appendix A, Confirmation of Action
Letter April 6,1982
2.
Appendix B, Preparedness Improvement Items
3.
Appendix C, Emergency Plan Deficiencies
4.
Inspection Report Nos. 50-280, 281/82-05
cc w/ encl:
J. H. Ferguson, Executive
Vice President-Power
J. L. Wilson, Station Manager
P. G. Godwin, Director, Nuclear Security
,
MAY L 5 i982
-
c
,
,
Virginia Electric and Power Company
3
bec w/ encl:
Document Management Branch
Commonwealth of Virginia
IE:DEP B. Grimes /D. Matthews
NRC Resident Inspector
RII
RI
RII
IE:HQ
RII
&
607/F
fp
itwan:ejw
GRJ kins
JPS ohr AFPagano
HC0ance
5/2.(/82
5/j[/82
5/ (/82 1 a t rev idau,, 2l /82
5/z(/82
5/
2
s/ b. ILfla.a
e r J~/ 9/et