ML20070E565: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:L. | {{#Wiki_filter:L. | ||
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE | JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE | ||
| Line 23: | Line 23: | ||
OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued thrcugh the month of November. | OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued thrcugh the month of November. | ||
The following safety-related maintenance was performed in the month of November: | The following safety-related maintenance was performed in the month of November: | ||
1. | |||
Performed miscellaneous maintenance on diesel generators. | |||
2. | |||
Cleaned, inspected and repaired miscellaneous valves in containment. | |||
3. | |||
Performed hydraulic snubber functional test and repaired snubbers as necessary. | |||
4. | |||
Repacked #2, #4, #6, #7 and #10 River Water pumps. | |||
i I | i I | ||
l 82121703ca 821213 | |||
l | ~ | ||
I PDR ADOCK 05000364 R | |||
PDR | |||
4.-.., | |||
DOC)1T No. 50-364 UNIT | ,,...m.. | ||
.....,,. -. 3 | |||
. ~,.. s, m., c m m | |||
-.m DOC)1T No. 50-364 UNIT 2 | |||
12/04/82 DATT. | |||
( | ( | ||
t | t COSIPLETED BY W. G. Hairston, III | ||
COSIPLETED BY | ~ | ||
4 | TELEPl!ONE (205) 899-5156 510fGli November DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net ) | ||
7 | (SIWE Net) 0 0 | ||
I. | |||
37 2 | |||
0 13 0 | |||
0 0 | |||
g9 3 | |||
4 0 | |||
20 0 | |||
0 0 | |||
5 21 s-O 0 | |||
4 y | |||
7 0 | |||
23 0 | |||
0 g | |||
0 24 0 | |||
0-9 25 10 0 | |||
26 0 | |||
0 0 | |||
Ig 27 0 | |||
0 12 73 13 0 | |||
0 | |||
;9 0 | |||
0 14 30 0 | |||
r* | |||
IS 3g 16 0 | |||
l INSTR 11CITONS On this form:. list the avenge daily umt power !cvelin AlWe Net for esch d:y in the reporting inunth. Compute io | |||
, the nearc.t whole nr;2 wait. | |||
(997) l O | |||
~. | |||
aw | |||
~ | |||
~. | |||
/ | |||
: 1. Unit Name: J Seph M. Farley - Unit 2 | N (V | ||
: 2. Reporting Period: November, 1982 | I OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/04/82 COMPLETED BY W.G.Hairston,III TELEPHONE (205)899-5156 OPERATING STATUS | ||
: 1. Unit Name: J Seph M. Farley - Unit 2 Notes | |||
: 2. Reporting Period: November, 1982 | |||
: 1) Cumulative data since | |||
: 3. Licensed Thermal Power (MWt): | : 3. Licensed Thermal Power (MWt): | ||
: 4. Nameplate Rating (Gross MWe): | 2652 7/30/81, date of commer-860 cial operation. | ||
S. Design Electrical Rating (Net MWe): | : 4. Nameplate Rating (Gross MWe): | ||
: 6. Maximum Dependable Capacity (Gross MWe): | 829 S. Design Electrical Rating (Net MWe): | ||
: 7. Maximum Dependable Capacity (Net MWe): | 854.7 | ||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
813.7 | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | ||
N/A | N/A N/A | ||
: 9. Ib,er Level To Which Restricted,If Any (Net MWe): | : 9. Ib,er Level To Which Restricted,If Any (Net MWe): | ||
: 10. Reasons For Restrictions,if Any: | : 10. Reasons For Restrictions,if Any: | ||
N/A (O'J This Month Yr..to.Date | |||
: 13. Reactor Resene Shutdown llours | ' Cumulatise l | ||
: 11. Hours in Reporting Period 720 8.016 11,737 f | |||
: 15. Unit Resene Shutdown Hours | !2. Number Of flours Reactor Was Critical 12.4 6,358.6 10,044.8 l | ||
: 16. Gross Thermal Energy Generated (MWH) | : 13. Reactor Resene Shutdown llours 0 | ||
97.6 138.4 0 | |||
6,254.2 9,920.7 l | |||
: 18. Net Electrical Energy Generated (MWH) | : 14. Hours Generator On.Line | ||
: 15. Unit Resene Shutdown Hours 0 | |||
: 20. Unit Availability Factor | 0 0 | ||
0 15,955,657 64,400,880 a | |||
: | : 16. Gross Thermal Energy Generated (MWH) 28 | ||
: | .___,,, 5,102,548 8,173,926 | ||
: 17. Gross Electrical Energy Generated (MWH) | |||
-7,464 4,825,150 7,745,870 | |||
: 18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5 l | |||
: 19. Unit Senice Factor | |||
: 20. Unit Availability Factor 0.0 78.0 84.5 | |||
- 1.3 74.0 81.1 | |||
: 21. Unit Capacity Factor iUsing MDC Net) | |||
- 1.3 72.6 79.6 | |||
: 22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1 | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date and Duration of Each1: | : 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date and Duration of Each1: | ||
___ N/A | ___ N/A | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/03/82 | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/03/82 | ||
: 26. Units in Test Status (Prior to Commercial Operation): | : 26. Units in Test Status (Prior to Commercial Operation): | ||
INITI AL ELECTRICITY | Forecast Achiesed INITIAL CRITICALITY 5/06/81 5/08/81 fp | ||
\\ | |||
INITI AL ELECTRICITY 5/24/81 5/25/81 l | |||
COMMERCI A L OPERATION 8/01/81 7/30/81 (4/77 : | |||
UNIT SilUTDOWNS AND POWER REDUCTIONS | UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNITNAME J.M.Farlev - Unit 2 DATE 1?/nu/a7 COMPLETED BY W.G.Hairston, III REPORT MONTig November TELEPilONE (205)899-5156 | ||
{ | |||
_h* | |||
TELEPilONE (205)899-5156 | .! E | ||
{ | 'h I | ||
Licensec 6% | |||
Cause & Corrective E'.E Action o No. | |||
Date c. | |||
3g g | |||
j | jg5 Event r? | ||
013 | 50 V | ||
for refueling. | f | ||
$ 2., | |||
5 j g5 g Repost | |||
* Prevent Recurrence 6 | |||
j 013 821101 S | |||
720 C | |||
1 | |||
-NA NA NA Unit outage was continued from 10/31/82 for refueling. | |||
1 fi i | 1 fi i | ||
1 | 1 2 | ||
F: Furi.ed | 3 4 | ||
4-Other (Explain) | F: Furi.ed Reason: | ||
E Operator Training & Ucense Examination F-Administ rative | Method: | ||
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data ti. Maintenance or Test 2-Manual Scram. | |||
Entry Sheets for I.icensee C Refuehng 3 Automatic Scram. | |||
Event Repor (LER) File (NUREG-D Regulatosy Restriction 4-Other (Explain) 0161) | |||
E Operator Training & Ucense Examination F-Administ rative 5 | |||
G Opciational l.nor tlimplam) lisinhit I. Same Siance (9/17) 11 Oshes (lixplain) 1 | |||
l o. | |||
o | |||
9 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE | 9 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE | ||
| Line 100: | Line 166: | ||
OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued through the month of November. | OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued through the month of November. | ||
The following safety-related maintenance was performed in the month of November: | The following safety-related maintenance was performed in the month of November: | ||
1. | |||
Performed miscellaneous maintenance on diesel generators. | |||
2. | |||
Cleaned, inspected and repaired miscellaneous valves in containment. | |||
3. | |||
Performed hydraulic snubber functional test and repaired snubbers as necessary. | |||
4. | |||
Repacked #2, #4, #6, #7 and #10 River Water pumps. | |||
l | l | ||
. s.- | |||
DOCKET NO. 50-364 UNIT | -. :. :a, - | ||
..~.~m a. | |||
DA'II | DOCKET NO. 50-364 UNIT 2 | ||
12/04/82 | |||
/ | |||
DA'II | |||
g9 | ( | ||
COMPLETED BY W. C. Hairston, III TELEPl!ONE (205) 899-5156 | |||
)!OfG11 November DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER I.EVEL (alwe-Ner) | |||
4 | (51we. Net) 0 0 | ||
I. | |||
0 | 37 2 | ||
g | 0 is 0 | ||
0 0 | |||
g9 3 | |||
INSTRUCIIONS On this form: . list the svenge daily umt power levelin MWe Net for each d:y in the reporting month. Compute to | ^ | ||
4 0 | |||
20 0 | |||
0 0 | |||
* c -sum- | 5 21 0 | ||
0 g | |||
6 7 | |||
0 3 | |||
0 0 | |||
g 0 | |||
24 0 | |||
0 9 | |||
25 10 0 | |||
26 0 | |||
O 0 | |||
II 27 0 | |||
0 12 73 0 | |||
13 0 | |||
;9 0 | |||
0 14 30 0 | |||
e IS 3g I6 0 | |||
L INSTRUCIIONS On this form:. list the svenge daily umt power levelin MWe Net for each d:y in the reporting month. Compute to | |||
, the nearest whole nc;2 wait. | |||
(9(77) y | |||
. | |||
* c -sum- | |||
e I | e I | ||
OPERATING DATA REPORT DOCKET NO. 50-364 DATt 12/04/82 COMPLETED BY W.G.Hairston.III 2 | |||
TELEPHONE (205)899 5156 OPERATING STATUS Notes J seph M. Farley - Unit 2 | |||
: 1. Unit Name: | : 1. Unit Name: | ||
November, 1982 | |||
: 1) Cum 'ative data since | |||
: 2. Reporting Period: | : 2. Reporting Period: | ||
: 3. Licensed Thermal Power (MWt): | : 3. Licensed Thermal Power (MWt): | ||
860 | 2652 7/30/81, date of commer-860 cial operation. | ||
: 4. Nameplate Rating (Gross MWe): | : 4. Nameplate Rating (Gross MWe): | ||
829 | |||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
854.7 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | : 6. Maximum Dependable Capacity (Gross MWe): | ||
813.7 | |||
: 7. Maximum Dependable Capacity (Net MWe): | : 7. Maximum Dependable Capacity (Net MWe): | ||
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons: | : 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons: | ||
N/A | N/A | ||
~ | |||
: 9. Power Level To Which Restricted lf Any (Net MWe): | N/A | ||
: 10. Reasons For Restrictions,If Any: | : 9. Power Level To Which Restricted lf Any (Net MWe): | ||
This Month | : 10. Reasons For Restrictions,If Any: | ||
: 11. Hours in Reporting Period | N/A I | ||
: 12. Number Of Hours Reactor Was Critical . | This Month Yr..to.Date Cuniulatise 720 8,016 11,737 | ||
: 11. Hours in Reporting Period | |||
: 12. Number Of Hours Reactor Was Critical. | |||
: 13. Reactor Reserve Shutdown Hours 0 | 12.4 6,358.6 10,044.8 | ||
: 14. Hours Generator On.Line 0 | ~ | ||
: 15. Unit Rewrve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours 0 | ||
97.6 138.4 0 | |||
28 | 6,254.2 9,920.7 | ||
: 14. Hours Generator On.Line 0 | |||
0 0 | |||
: 15. Unit Rewrve Shutdown Hours 0 | |||
15,955,657 64,400,880 | |||
: 16. Gross Thermal Energy Generated (MWH) 28 | |||
: 17. Gross Electrical Energy Generated (MWH) | : 17. Gross Electrical Energy Generated (MWH) | ||
.,, 5,102,548 8,173,926 | |||
: 18. Net Electrical Energy Generated (MWH) 0.0 | -7,464 | ||
: 19. Unit Senice Factor | -4,825,150 7,745,870 | ||
: 18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5 | |||
: | : 19. Unit Senice Factor 0.0 78.0 84.5 | ||
: 20. Unit Availability Factor | |||
: 22. Unit Capacity Factor (Using DER Net) | - 1.3 74.0 81.1 | ||
: 21. Unit Capacity Factor (Using MDC Net) | |||
- 1.3 72.6 79.6 | |||
: 22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1 | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Erch): | : 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Erch): | ||
N/A | N/A 12/03/82 | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units in Test Status (Prior to Commercial Operation): | : 26. Units in Test Status (Prior to Commercial Operation): | ||
Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITI AL ELECTRICITY 5/24/81 5/25/81 COMMERCI AL OPER ATION 8/01/81 7/30/81 (9/77i | |||
e DOCKET NO. 50-364 | e DOCKET NO. 50-364 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farlev - Unit 2 DATE 17/na/g7 | ||
UNIT SIIUTDOWNS AND POWER REDUCTIONS | ~ | ||
COMPLETED BY W.G.Hairston, lII | COMPLETED BY W.G.Hairston, lII REPORT af0NTil November TELEPilONE (205)899-5156 i | ||
REPORT af0NTil November | .! p | ||
} | |||
E Licensec | |||
,Eg h. | |||
Cause & Currective No. | |||
h. | Daic g | ||
3g jg5 Event g? | |||
Report a | Q Action to mO | ||
$0 Pacvent Recurrence fE 5 | |||
U gg =! | |||
Report a u | |||
8-2 6 | |||
013 821101 S | |||
720 C | |||
1 NA NA NA Unit outage was continued from 10/31/82 for refueling.' | |||
t 4 | t 4 | ||
I | I 2 | ||
C.Rcfuchng | 3 4 | ||
F: Forced Reason: | |||
Method: | |||
Exhibit G Instructions S: Scheduled A-Fquipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. | |||
Entry Sheets for I.icensee i | |||
C.Rcfuchng 3 Autunutic Scram. | |||
Event ReporI (i.ER) File INUREG-D-Regulatosy Restriction 4-Other (Explain) 0161) | |||
E-Operator Training & Ucense Examination F-Administ rative 5 | |||
G Opciational I.nor (linplain) | |||
INhibii ! Same Sousee 19/11) 11 Othe II mplain) l}} | |||
Latest revision as of 09:48, 16 December 2024
| ML20070E565 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/04/1982 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20070E557 | List: |
| References | |
| NUDOCS 8212170302 | |
| Download: ML20070E565 (8) | |
Text
L.
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued thrcugh the month of November.
The following safety-related maintenance was performed in the month of November:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Cleaned, inspected and repaired miscellaneous valves in containment.
3.
Performed hydraulic snubber functional test and repaired snubbers as necessary.
4.
Repacked #2, #4, #6, #7 and #10 River Water pumps.
i I
l 82121703ca 821213
~
I PDR ADOCK 05000364 R
4.-..,
,,...m..
.....,,. -. 3
. ~,.. s, m., c m m
-.m DOC)1T No. 50-364 UNIT 2
12/04/82 DATT.
(
t COSIPLETED BY W. G. Hairston, III
~
TELEPl!ONE (205) 899-5156 510fGli November DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net )
(SIWE Net) 0 0
I.
37 2
0 13 0
0 0
g9 3
4 0
20 0
0 0
5 21 s-O 0
4 y
7 0
23 0
0 g
0 24 0
0-9 25 10 0
26 0
0 0
Ig 27 0
0 12 73 13 0
0
- 9 0
0 14 30 0
r*
IS 3g 16 0
l INSTR 11CITONS On this form:. list the avenge daily umt power !cvelin AlWe Net for esch d:y in the reporting inunth. Compute io
, the nearc.t whole nr;2 wait.
(997) l O
~.
aw
~
~.
/
N (V
I OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/04/82 COMPLETED BY W.G.Hairston,III TELEPHONE (205)899-5156 OPERATING STATUS
- 1. Unit Name: J Seph M. Farley - Unit 2 Notes
- 2. Reporting Period: November, 1982
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 7/30/81, date of commer-860 cial operation.
- 4. Nameplate Rating (Gross MWe):
829 S. Design Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Gross MWe):
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Ib,er Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
N/A (O'J This Month Yr..to.Date
' Cumulatise l
- 11. Hours in Reporting Period 720 8.016 11,737 f
!2. Number Of flours Reactor Was Critical 12.4 6,358.6 10,044.8 l
- 13. Reactor Resene Shutdown llours 0
97.6 138.4 0
6,254.2 9,920.7 l
- 14. Hours Generator On.Line
- 15. Unit Resene Shutdown Hours 0
0 0
0 15,955,657 64,400,880 a
- 16. Gross Thermal Energy Generated (MWH) 28
.___,,, 5,102,548 8,173,926
- 17. Gross Electrical Energy Generated (MWH)
-7,464 4,825,150 7,745,870
- 18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5 l
- 19. Unit Senice Factor
- 20. Unit Availability Factor 0.0 78.0 84.5
- 1.3 74.0 81.1
- 21. Unit Capacity Factor iUsing MDC Net)
- 1.3 72.6 79.6
- 22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date and Duration of Each1:
___ N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/03/82
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 5/06/81 5/08/81 fp
\\
INITI AL ELECTRICITY 5/24/81 5/25/81 l
COMMERCI A L OPERATION 8/01/81 7/30/81 (4/77 :
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNITNAME J.M.Farlev - Unit 2 DATE 1?/nu/a7 COMPLETED BY W.G.Hairston, III REPORT MONTig November TELEPilONE (205)899-5156
{
_h*
.! E
'h I
Licensec 6%
Cause & Corrective E'.E Action o No.
Date c.
3g g
jg5 Event r?
50 V
f
$ 2.,
5 j g5 g Repost
- Prevent Recurrence 6
j 013 821101 S
720 C
1
-NA NA NA Unit outage was continued from 10/31/82 for refueling.
1 fi i
1 2
3 4
F: Furi.ed Reason:
Method:
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data ti. Maintenance or Test 2-Manual Scram.
Entry Sheets for I.icensee C Refuehng 3 Automatic Scram.
Event Repor (LER) File (NUREG-D Regulatosy Restriction 4-Other (Explain) 0161)
E Operator Training & Ucense Examination F-Administ rative 5
G Opciational l.nor tlimplam) lisinhit I. Same Siance (9/17) 11 Oshes (lixplain) 1
l o.
9 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued through the month of November.
The following safety-related maintenance was performed in the month of November:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Cleaned, inspected and repaired miscellaneous valves in containment.
3.
Performed hydraulic snubber functional test and repaired snubbers as necessary.
4.
Repacked #2, #4, #6, #7 and #10 River Water pumps.
l
. s.-
-. :. :a, -
..~.~m a.
DOCKET NO. 50-364 UNIT 2
12/04/82
/
DA'II
(
COMPLETED BY W. C. Hairston, III TELEPl!ONE (205) 899-5156
)!OfG11 November DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER I.EVEL (alwe-Ner)
(51we. Net) 0 0
I.
37 2
0 is 0
0 0
g9 3
^
4 0
20 0
0 0
5 21 0
0 g
6 7
0 3
0 0
g 0
24 0
0 9
25 10 0
26 0
O 0
II 27 0
0 12 73 0
13 0
- 9 0
0 14 30 0
e IS 3g I6 0
L INSTRUCIIONS On this form:. list the svenge daily umt power levelin MWe Net for each d:y in the reporting month. Compute to
, the nearest whole nc;2 wait.
(9(77) y
.
- c -sum-
e I
OPERATING DATA REPORT DOCKET NO. 50-364 DATt 12/04/82 COMPLETED BY W.G.Hairston.III 2
TELEPHONE (205)899 5156 OPERATING STATUS Notes J seph M. Farley - Unit 2
- 1. Unit Name:
November, 1982
- 1) Cum 'ative data since
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2652 7/30/81, date of commer-860 cial operation.
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Gross MWe):
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
~
N/A
- 9. Power Level To Which Restricted lf Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
N/A I
This Month Yr..to.Date Cuniulatise 720 8,016 11,737
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical.
12.4 6,358.6 10,044.8
~
- 13. Reactor Reserve Shutdown Hours 0
97.6 138.4 0
6,254.2 9,920.7
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Rewrve Shutdown Hours 0
15,955,657 64,400,880
- 16. Gross Thermal Energy Generated (MWH) 28
- 17. Gross Electrical Energy Generated (MWH)
.,, 5,102,548 8,173,926
-7,464
-4,825,150 7,745,870
- 18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5
- 19. Unit Senice Factor 0.0 78.0 84.5
- 20. Unit Availability Factor
- 1.3 74.0 81.1
- 21. Unit Capacity Factor (Using MDC Net)
- 1.3 72.6 79.6
- 22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Erch):
N/A 12/03/82
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITI AL ELECTRICITY 5/24/81 5/25/81 COMMERCI AL OPER ATION 8/01/81 7/30/81 (9/77i
e DOCKET NO. 50-364 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farlev - Unit 2 DATE 17/na/g7
~
COMPLETED BY W.G.Hairston, lII REPORT af0NTil November TELEPilONE (205)899-5156 i
.! p
}
E Licensec
,Eg h.
Cause & Currective No.
Daic g
3g jg5 Event g?
Q Action to mO
$0 Pacvent Recurrence fE 5
U gg =!
Report a u
8-2 6
013 821101 S
720 C
1 NA NA NA Unit outage was continued from 10/31/82 for refueling.'
t 4
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A-Fquipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for I.icensee i
C.Rcfuchng 3 Autunutic Scram.
Event ReporI (i.ER) File INUREG-D-Regulatosy Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Examination F-Administ rative 5
G Opciational I.nor (linplain)
INhibii ! Same Sousee 19/11) 11 Othe II mplain) l