t JOSEPH M. FARLEY NUCLEAR PLANT
t JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE  
,                                                  UNIT 1 NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATIONS DECEMBER, 1982 In the month of December there was one unit shutdown.
OF OPERATIONS DECEMBER, 1982 In the month of December there was one unit shutdown.
The following safety-related maintenance was performed in the month of December:
The following safety-related maintenance was performed in the month of December:
: 1. Performed miscellaneous maintenance on diesel generators.
1.
: 2. Repacked #4 River Water pump.
Performed miscellaneous maintenance on diesel generators.
2.
Repacked #4 River Water pump.
4 i
4 i
n --
n P301240041 830114 PDR ADOCK 05000348 R
P301240041 830114 PDR ADOCK 05000348 R                 PDR   _
PDR


t OPERATING DATA REPORT DOCKET NO. 50-348 DATE 1/06/83 COMPLETED BY W.G.Hairston,Ill TELEPilONE (205)899-5156 OPERATING STATUS J seph M. Farley - Unit 1                              Notes                      -
t OPERATING DATA REPORT DOCKET NO. 50-348 DATE 1/06/83 COMPLETED BY W.G.Hairston,Ill TELEPilONE (205)899-5156 OPERATING STATUS
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period:     December, 1982                                   1) Cumulative data since 2652                                  12/01/77, date" of
J seph M. Farley - Unit 1 Notes
: 2. Reporting Period:
December, 1982
: 1) Cumulative data since
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):         860                                   commercial operation.
2652 12/01/77, date" of
: 5. Design Electrical Rating (Net MWe):     829
: 4. Nameplate Rating (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):       844.6
860 commercial operation.
: 7. Maximum Dependable Capacity (Net MWe):         803.6
: 5. Design Electrical Rating (Net MWe):
829
: 6. Maximum Dependable Capacity (Gross MWe):
844.6
: 7. Maximum Dependable Capacity (Net MWe):
803.6
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
N/A
: 9. Power Level To Which Restricted,If Any (Net MWe):           N/A
: 9. Power Level To Which Restricted,If Any (Net MWe):
: 10. Reasons For Restrictions.If Any:         N/A This Month             Yr..to.Date       Curimlatise
N/A
: 11. Hours In Reporting Period                                 744                     8,760         44,568
: 10. Reasons For Restrictions.If Any:
: 12. Number Of flours Reactor Was Critical                     736.5                   7,165.7       28,147.5 t      13. Reactor Reserve Shutdown Hours                             0                         122.5       3,614.5 l
N/A This Month Yr..to.Date Curimlatise
: 14. Hours Generator On-Line                                   731.2                   6,938.5       27,268.2
: 11. Hours In Reporting Period 744 8,760 44,568
: 15. Unit Reserve Shutdown Hours                               0                       0               0-
: 12. Number Of flours Reactor Was Critical 736.5 7,165.7 28,147.5
: 16. Gross Thermal Energy Generated (MWH)             i As6 457               17.545.138       68.490.049
: 13. Reactor Reserve Shutdown Hours 0
: 17. Gross Electrical Energy Generated (MWH)             590.llft_
122.5 3,614.5 t
t    ,_.       5.536.596       21.773,548
l
: 18. Net Electrical Energy Generated (MWH)               559.140                 5,216,496       20,440,220 l
: 14. Hours Generator On-Line 731.2 6,938.5 27,268.2
: 19. Unit Service Factor                                         98.3                 79.2             61.2
: 15. Unit Reserve Shutdown Hours 0
,      20. Unit Availability Factor                                     98.3                 79.2             61.2 l       21. Unit Capacity Factor IUsing MDC Net)                         93.5                 74.1             57.1 l       22. Unit Capacity FactoriUsing DER Net)                         90.7                 .71.8             55.3
0 0-
: 23. Unit Forced Outage Rate                                       1.7                 20.6             18.2
: 16. Gross Thermal Energy Generated (MWH) i As6 457 17.545.138 68.490.049
: 17. Gross Electrical Energy Generated (MWH) 590.llft_,_.
5.536.596 21.773,548 t
: 18. Net Electrical Energy Generated (MWH) 559.140 5,216,496 20,440,220 l
: 19. Unit Service Factor 98.3 79.2 61.2
: 20. Unit Availability Factor 98.3 79.2 61.2 l
: 21. Unit Capacity Factor IUsing MDC Net) 93.5 74.1 57.1 l
: 22. Unit Capacity FactoriUsing DER Net) 90.7
.71.8 55.3
: 23. Unit Forced Outage Rate 1.7 20.6 18.2
: 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
: 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
Refuelinc Outane. January 15, 1983, Approximately 11 weeks
Refuelinc Outane. January 15, 1983, Approximately 11 weeks
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:         N/A
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status tPrior to Commercial Operation):                       Forecast           Achiesed INITI A L CRITICALITY                                   8/06/77           8/09/77 INITIA L ELECTRICITY                                     8/20/77           8/18/77 COMMERCI AL OPER ATION                                 12 /n 1/ 7.7       12/01/77 (4/77)
N/A
: 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCI AL OPER ATION 12 /n 1/ 7.7 12/01/77 (4/77)


L:
L:
                                                                                  .a         .n....     ..,.;.-~.~....
..n..
  . .n . .                                                  -                                                                .
.a
a
.n....
                                                  ~
..,.;.-~.~....
DOCKET NO.           50-348
a DOCKET NO.
                                                                                  ~
50-348
          ~
~
UNIT           1 DAE         1/06/83 W.G.Hairston, III CO5!PLETED BY
~
                                                                                                    . TELEPl!ONE           (205)899-5156 December MONTl!
UNIT 1
DAY       AVERACE DAILY POWER LEVEL                             DAY       AVERAGE DAILY POWER LEVEL (AlWe Net)                                                 (51We Net) g,                     796                                  g7                       810 2                       663                                 33                       812 77                             g9                       808 3
~
260                                   2g                       807 4
DAE 1/06/83 CO5!PLETED BY W.G.Hairston, III
587                                   21 807 3
. TELEPl!ONE (205)899-5156 December MONTl!
        *-                              799                                 22                      805 6
DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (AlWe Net)
7                       809                                 23                       803 g                       809                                  24 797 9                       809                                 25-                     797 10                       808                                 26                       809 gg                        801                                 27                       800 12                       806                                 23                       797 13                       812                                 ;9                       801 g4                       810                                  30                       800 IS                       803                                 33                       795 16                       808 INSTRUCDONS On this fonnst. list the svenge daily unit power levelin MWe-Net for esch d:y in the reporting inonth. Compute to
(51We Net) g, g7 810 796 2
              , the neare:t whole ne;swait.
663 33 812 3
77 g9 808 807 260 2g 4
587 807 3
21 799 805 6
22 7
809 23 803 809 797 g
24 9
809 25-797 10 808 26 809 800 801 27 gg 12 806 23 797 801 13 812
;9 810 800 g4 30 IS 803 33 795 16 808 INSTRUCDONS On this fonnst. list the svenge daily unit power levelin MWe-Net for esch d:y in the reporting inonth. Compute to
, the neare:t whole ne;swait.
(9p7)
(9p7)
O
O g
                      -        -                        ~     .  ,.                -
~
                                                                                                . . ~ ,         .
.. ~,
g


6 a      .-
a 6
UNIT SilUTDOWNS AND POWER REDUCI10NS                     DOCKET NO. 50-34o UNIT NAME J.M_FARLEY-UNIT 1 DATE 1/06/R7 COMPLETED BY W C nairston,III REPORT MONTil Decomho v-TELEPilONE (2051 899-5156 w.
UNIT SilUTDOWNS AND POWER REDUCI10NS DOCKET NO. 50-34o UNIT NAME J.M_FARLEY-UNIT 1 DATE 1/06/R7 COMPLETED BY W C nairston,III REPORT MONTil Decomho v-TELEPilONE (2051 899-5156 w.
                                                                            -      E                               E
E E
                                                  -,      .! E     };;    j E5       Licensee         h         h                 Cause & Corrective No.         Date       g     gg               2g5         Event           g                                 Action to H      jE         5     j5g         Repori
.! E
* _
}
mU       g{                Prevent Recurrence 6
j E5 Licensee h
011     821202       F       12.8     A           3       NA             CH     INSTRU     Unit tripped due to the                                 '
h Cause & Corrective No.
failure of a control driver card for lA feed regulating valve power supply. A subsequent reactor trip occurred due to Lo-Lo S/G level caused by operator error.                                         '
Date g
* r 5
gg 2g5 Event g
l l
jE 5
j5g Repori
* g{
Action to H
mU Prevent Recurrence 6
011 821202 F
12.8 A
3 NA CH INSTRU Unit tripped due to the failure of a control driver card for lA feed regulating valve power supply.
A subsequent reactor trip occurred due to Lo-Lo S/G level caused by operator error.
r l
5 l
t l
t l
I                     2                                                   3                               4 F: Forced             Reason:                                               Method:                       Exhibit G . instructions                   ;
I 2
i                          S; Scheduled         A Equipment Failure (Explain)                         1-Manual                       for Preparation of Data
3 4
:                                                B Maintenance of Test                                 2 Manual Scram.               Entry Sheets for I.icensee                 :
F: Forced Reason:
C Refueling                                           3 Automatic Scram.             Event ReporI (1.ER) File (NUREG-l                                               D Regulatosy Restriction                                                                                                         l 4 Other (Explain)             0161)                                       ;
Method:
i E Operator Training & IJcense Examination                                                                                         '
Exhibit G. instructions i
l F-Administ rative                                                                 5                                               '
S; Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
G-Opes.;tional Litor (Explain)                                                       Exhibit 1 Same Source (9/77)                   ll Othes (Explain)
Entry Sheets for I.icensee C Refueling 3 Automatic Scram.
Event ReporI (1.ER) File (NUREG-l l
D Regulatosy Restriction 4 Other (Explain) 0161) i E Operator Training & IJcense Examination l
F-Administ rative 5
G-Opes.;tional Litor (Explain)
Exhibit 1 Same Source (9/77) ll Othes (Explain)
U}}
U}}

Latest revision as of 05:53, 15 December 2024

Monthly Operating Rept for Dec 1982
ML20072A495
Person / Time
Site: Farley 
Issue date: 01/05/1983
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20072A470 List:
References
NUDOCS 8301240041
Download: ML20072A495 (4)


Text

-

t JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER, 1982 In the month of December there was one unit shutdown.

The following safety-related maintenance was performed in the month of December:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repacked #4 River Water pump.

4 i

n P301240041 830114 PDR ADOCK 05000348 R

PDR

t OPERATING DATA REPORT DOCKET NO. 50-348 DATE 1/06/83 COMPLETED BY W.G.Hairston,Ill TELEPilONE (205)899-5156 OPERATING STATUS

1. Unit Name:

J seph M. Farley - Unit 1 Notes

2. Reporting Period:

December, 1982

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2652 12/01/77, date" of

4. Nameplate Rating (Gross MWe):

860 commercial operation.

5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe):

844.6

7. Maximum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any:

N/A This Month Yr..to.Date Curimlatise

11. Hours In Reporting Period 744 8,760 44,568
12. Number Of flours Reactor Was Critical 736.5 7,165.7 28,147.5
13. Reactor Reserve Shutdown Hours 0

122.5 3,614.5 t

l

14. Hours Generator On-Line 731.2 6,938.5 27,268.2
15. Unit Reserve Shutdown Hours 0

0 0-

16. Gross Thermal Energy Generated (MWH) i As6 457 17.545.138 68.490.049
17. Gross Electrical Energy Generated (MWH) 590.llft_,_.

5.536.596 21.773,548 t

18. Net Electrical Energy Generated (MWH) 559.140 5,216,496 20,440,220 l
19. Unit Service Factor 98.3 79.2 61.2
20. Unit Availability Factor 98.3 79.2 61.2 l
21. Unit Capacity Factor IUsing MDC Net) 93.5 74.1 57.1 l
22. Unit Capacity FactoriUsing DER Net) 90.7

.71.8 55.3

23. Unit Forced Outage Rate 1.7 20.6 18.2
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

Refuelinc Outane. January 15, 1983, Approximately 11 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status tPrior to Commercial Operation):

Forecast Achiesed INITI A L CRITICALITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCI AL OPER ATION 12 /n 1/ 7.7 12/01/77 (4/77)

L:

..n..

.a

.n....

..,.;.-~.~....

a DOCKET NO.

50-348

~

~

UNIT 1

~

DAE 1/06/83 CO5!PLETED BY W.G.Hairston, III

. TELEPl!ONE (205)899-5156 December MONTl!

DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (AlWe Net)

(51We Net) g, g7 810 796 2

663 33 812 3

77 g9 808 807 260 2g 4

587 807 3

21 799 805 6

22 7

809 23 803 809 797 g

24 9

809 25-797 10 808 26 809 800 801 27 gg 12 806 23 797 801 13 812

9 810 800 g4 30 IS 803 33 795 16 808 INSTRUCDONS On this fonnst. list the svenge daily unit power levelin MWe-Net for esch d
y in the reporting inonth. Compute to

, the neare:t whole ne;swait.

(9p7)

O g

~

.. ~,

a 6

UNIT SilUTDOWNS AND POWER REDUCI10NS DOCKET NO.50-34o UNIT NAME J.M_FARLEY-UNIT 1 DATE 1/06/R7 COMPLETED BY W C nairston,III REPORT MONTil Decomho v-TELEPilONE (2051 899-5156 w.

E E

.! E

}

j E5 Licensee h

h Cause & Corrective No.

Date g

gg 2g5 Event g

jE 5

j5g Repori

  • g{

Action to H

mU Prevent Recurrence 6

011 821202 F

12.8 A

3 NA CH INSTRU Unit tripped due to the failure of a control driver card for lA feed regulating valve power supply.

A subsequent reactor trip occurred due to Lo-Lo S/G level caused by operator error.

r l

5 l

t l

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions i

S; Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for I.icensee C Refueling 3 Automatic Scram.

Event ReporI (1.ER) File (NUREG-l l

D Regulatosy Restriction 4 Other (Explain) 0161) i E Operator Training & IJcense Examination l

F-Administ rative 5

G-Opes.;tional Litor (Explain)

Exhibit 1 Same Source (9/77) ll Othes (Explain)