t JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER, 1982 In the month of December there was one unit shutdown.

The following safety-related maintenance was performed in the month of December:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Repacked #4 River Water pump.

4 i

n P301240041 830114 PDR ADOCK 05000348 R

PDR

t OPERATING DATA REPORT DOCKET NO. 50-348 DATE 1/06/83 COMPLETED BY W.G.Hairston,Ill TELEPilONE (205)899-5156 OPERATING STATUS

1. Unit Name:

J seph M. Farley - Unit 1 Notes

2. Reporting Period:

December, 1982

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2652 12/01/77, date" of

4. Nameplate Rating (Gross MWe):

860 commercial operation.

5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe):

844.6

7. Maximum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any:

N/A This Month Yr..to.Date Curimlatise

11. Hours In Reporting Period 744 8,760 44,568
12. Number Of flours Reactor Was Critical 736.5 7,165.7 28,147.5
13. Reactor Reserve Shutdown Hours 0

122.5 3,614.5 t

l

14. Hours Generator On-Line 731.2 6,938.5 27,268.2
15. Unit Reserve Shutdown Hours 0

0 0-

16. Gross Thermal Energy Generated (MWH) i As6 457 17.545.138 68.490.049
17. Gross Electrical Energy Generated (MWH) 590.llft_,_.

5.536.596 21.773,548 t

18. Net Electrical Energy Generated (MWH) 559.140 5,216,496 20,440,220 l
19. Unit Service Factor 98.3 79.2 61.2
20. Unit Availability Factor 98.3 79.2 61.2 l
21. Unit Capacity Factor IUsing MDC Net) 93.5 74.1 57.1 l
22. Unit Capacity FactoriUsing DER Net) 90.7

.71.8 55.3

23. Unit Forced Outage Rate 1.7 20.6 18.2
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

Refuelinc Outane. January 15, 1983, Approximately 11 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status tPrior to Commercial Operation):

Forecast Achiesed INITI A L CRITICALITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCI AL OPER ATION 12 /n 1/ 7.7 12/01/77 (4/77)

L:

..n..

.a

.n....

..,.;.-~.~....

a DOCKET NO.

50-348

~

~

UNIT 1

~

DAE 1/06/83 CO5!PLETED BY W.G.Hairston, III

. TELEPl!ONE (205)899-5156 December MONTl!

DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (AlWe Net)

(51We Net) g, g7 810 796 2

663 33 812 3

77 g9 808 807 260 2g 4

587 807 3

21 799 805 6

22 7

809 23 803 809 797 g

24 9

809 25-797 10 808 26 809 800 801 27 gg 12 806 23 797 801 13 812

9 810 800 g4 30 IS 803 33 795 16 808 INSTRUCDONS On this fonnst. list the svenge daily unit power levelin MWe-Net for esch d
y in the reporting inonth. Compute to

, the neare:t whole ne;swait.

(9p7)

O g

~

.. ~,

a 6

UNIT SilUTDOWNS AND POWER REDUCI10NS DOCKET NO.50-34o UNIT NAME J.M_FARLEY-UNIT 1 DATE 1/06/R7 COMPLETED BY W C nairston,III REPORT MONTil Decomho v-TELEPilONE (2051 899-5156 w.

E E

.! E

}

j E5 Licensee h

h Cause & Corrective No.

Date g

gg 2g5 Event g

jE 5

j5g Repori

  • g{

Action to H

mU Prevent Recurrence 6

011 821202 F

12.8 A

3 NA CH INSTRU Unit tripped due to the failure of a control driver card for lA feed regulating valve power supply.

A subsequent reactor trip occurred due to Lo-Lo S/G level caused by operator error.

r l

5 l

t l

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions i

S; Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for I.icensee C Refueling 3 Automatic Scram.

Event ReporI (1.ER) File (NUREG-l l

D Regulatosy Restriction 4 Other (Explain) 0161) i E Operator Training & IJcense Examination l

F-Administ rative 5

G-Opes.;tional Litor (Explain)

Exhibit 1 Same Source (9/77) ll Othes (Explain)

U