t JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS DECEMBER, 1982 In the month of December there was one unit shutdown.
The following safety-related maintenance was performed in the month of December:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repacked #4 River Water pump.
4 i
n P301240041 830114 PDR ADOCK 05000348 R
t OPERATING DATA REPORT DOCKET NO. 50-348 DATE 1/06/83 COMPLETED BY W.G.Hairston,Ill TELEPilONE (205)899-5156 OPERATING STATUS
- 1. Unit Name:
J seph M. Farley - Unit 1 Notes
- 2. Reporting Period:
December, 1982
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 12/01/77, date" of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation.
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe):
844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
N/A This Month Yr..to.Date Curimlatise
- 11. Hours In Reporting Period 744 8,760 44,568
- 12. Number Of flours Reactor Was Critical 736.5 7,165.7 28,147.5
- 13. Reactor Reserve Shutdown Hours 0
122.5 3,614.5 t
l
- 14. Hours Generator On-Line 731.2 6,938.5 27,268.2
- 15. Unit Reserve Shutdown Hours 0
0 0-
- 16. Gross Thermal Energy Generated (MWH) i As6 457 17.545.138 68.490.049
- 17. Gross Electrical Energy Generated (MWH) 590.llft_,_.
5.536.596 21.773,548 t
- 18. Net Electrical Energy Generated (MWH) 559.140 5,216,496 20,440,220 l
- 19. Unit Service Factor 98.3 79.2 61.2
- 20. Unit Availability Factor 98.3 79.2 61.2 l
- 21. Unit Capacity Factor IUsing MDC Net) 93.5 74.1 57.1 l
- 22. Unit Capacity FactoriUsing DER Net) 90.7
.71.8 55.3
- 23. Unit Forced Outage Rate 1.7 20.6 18.2
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
Refuelinc Outane. January 15, 1983, Approximately 11 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCI AL OPER ATION 12 /n 1/ 7.7 12/01/77 (4/77)
L:
..n..
.a
.n....
..,.;.-~.~....
a DOCKET NO.
50-348
~
~
UNIT 1
~
DAE 1/06/83 CO5!PLETED BY W.G.Hairston, III
. TELEPl!ONE (205)899-5156 December MONTl!
DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (AlWe Net)
(51We Net) g, g7 810 796 2
663 33 812 3
77 g9 808 807 260 2g 4
587 807 3
21 799 805 6
22 7
809 23 803 809 797 g
24 9
809 25-797 10 808 26 809 800 801 27 gg 12 806 23 797 801 13 812
- 9 810 800 g4 30 IS 803 33 795 16 808 INSTRUCDONS On this fonnst. list the svenge daily unit power levelin MWe-Net for esch d
- y in the reporting inonth. Compute to
, the neare:t whole ne;swait.
(9p7)
O g
~
.. ~,
a 6
UNIT SilUTDOWNS AND POWER REDUCI10NS DOCKET NO.50-34o UNIT NAME J.M_FARLEY-UNIT 1 DATE 1/06/R7 COMPLETED BY W C nairston,III REPORT MONTil Decomho v-TELEPilONE (2051 899-5156 w.
E E
.! E
}
j E5 Licensee h
h Cause & Corrective No.
Date g
gg 2g5 Event g
jE 5
j5g Repori
- g{
Action to H
mU Prevent Recurrence 6
011 821202 F
12.8 A
3 NA CH INSTRU Unit tripped due to the failure of a control driver card for lA feed regulating valve power supply.
A subsequent reactor trip occurred due to Lo-Lo S/G level caused by operator error.
r l
5 l
t l
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions i
S; Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for I.icensee C Refueling 3 Automatic Scram.
Event ReporI (1.ER) File (NUREG-l l
D Regulatosy Restriction 4 Other (Explain) 0161) i E Operator Training & IJcense Examination l
F-Administ rative 5
G-Opes.;tional Litor (Explain)
Exhibit 1 Same Source (9/77) ll Othes (Explain)
U