ML20072A468

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1982
ML20072A468
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/14/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20072A470 List:
References
NUDOCS 8301240034
Download: ML20072A468 (1)


Text

.

Milling Addr ts Alabama Power Company

~#

600 North 18th Street Post Office Box 2641 Birmingham Alabama 35291 A

Telephone 205 783-6081 F. L Clayton. Jr.

Sggc;;;g"'

Alabama Power the southern elecinc system January 14, 1983 Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE:

JOSEPH M. FARLEY NUCLEAR PLANT Unit 1 Monthly Operating Data Report Attached are two (2) copies of the December,1982 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications. As requested by letter from Mr. lohn F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very t ly, h

i g% F. L. Clayton, Jr.

FLCJr/KWM:bhj Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) l

'l C301240034 830114

'~

PDR ADOCK 05000348 R

PDR

.__ _