  .                              ViumNIA HLECTRIC AND POWER CObWANY                                     l i
ViumNIA HLECTRIC AND POWER CObWANY l
li t e n x ox n, VI H OINI A 20261 August 10, 1994 U. S. Nuclear Regulatory Commission                               Serial No. 94-461 Attention: Document Control Desk                                   NL&P/GSS Washington, D.C. 20555                                             Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
i li t e n x ox n, VI H OINI A 20261 August 10, 1994 U. S. Nuclear Regulatory Commission Serial No.
94-461 Attention: Document Control Desk NL&P/GSS Washington, D.C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of July 1994.
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of July 1994.
Very truly yours, d,y>w         b         Le
Very truly yours, d,y>w b
        ' ames P. O'Hanlon Senior Vice President - Nuclear Enclosure cc:     U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorier NRC Senior Resident Inspector North Anna Power Station Mr. John P. Edwards Old Dominion Electric Cooperative 4201 Dominion Blvd,3rd Floor Glen Allen, Virginia 23060 i C!!) P,7 Q                                                             '
Le
9408190199 94o733                                                                   1
' ames P. O'Hanlon Senior Vice President - Nuclear Enclosure cc:
{DR     ADOCK c500033s                                                                 '
U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorier NRC Senior Resident Inspector North Anna Power Station Mr. John P. Edwards Old Dominion Electric Cooperative 4201 Dominion Blvd,3rd Floor Glen Allen, Virginia 23060 i C!!) P,7 Q 9408190199 94o733 1
i    g PDR
{DR ADOCK c500033s i
g PDR


I l
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:
l l
Julv YEAR:
l l
1994 Approved:
l l
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: Julv     YEAR: 1994 Approved:
d Station Manager
d Station Manager


  ,                                                                                                                              4 I
4 OPERATING DATA REPO3T DOCKET NO.:
1 OPERATING DATA REPO3T DOCKET NO.:         50-338 DATE: August 5, 1994 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS
50-338 DATE: August 5, 1994 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.
: 1. Unit Name:................................ North Anna 1
Unit Name:................................ North Anna 1 2.
: 2. Reporting Period:......................... July 1994
Reporting Period:......................... July 1994 3.
: 3. Licensed Thermal Power (MWt):.............             2,893
Licensed Thermal Power (MWt):.............
: 4. Nameplate Rating (Gross MWe):... ..... ...                994
2,893 4.
: 5. Design Electrical Rating (Net MWe):.......               907
Nameplate Rating (Gross MWe):...
: 6. Maximum Dependable capacity (Gross MWe):..               948
994 5.
: 7. Maximum Dependable Capacity (Net MWe): ...                900
Design Electrical Rating (Net MWe):.......
: 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:_N/A
907 6.
: 9. Power level to which restricted, if any (Net MWe. _ N/A
Maximum Dependable capacity (Gross MWe):..
: 10. Reasons for restrictions, if any:             N/A This Month           Y-t D           Cumulative
948 7.
: 11. Hours in Reporting Period........ .... ............. ....                 744.0           5,087.0           141,203.0
Maximum Dependable Capacity (Net MWe):
: 12. Number of Hours Reactor was critical. ..... ..... .... ..                 744.0           5,087.0           105,492.7
900 8.
: 13. Reactor Reserve Shutdown Hours................         ..........          0.0                 0.0           6,826.8
If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:_N/A 9.
: 14. Hours Generator On-Line.... ................... ....... .                 744.0           5,087.0           102,527.9
Power level to which restricted, if any (Net MWe. _ N/A
: 15. Unit Reserve Shutdown Hours.. ........ ..... .. .......                      0.0                 0.0               0.0
: 10. Reasons for restrictions, if any:
: 16. Gross Thermal Energy Generated (MWH)...... ...... . .... 1,820,747.3                 14,361,221.5       272,813,457.9
N/A This Month Y-t D Cumulative
: 17. Cross Electrical Energy Generated (MWH)... . .. . . . ... . ....      600,165.0       4,736,345.0       89,651,702.0
: 11. Hours in Reporting Period.............................
: 18. Net Electrical Energy Generated (MWH)..... ..............              565,845.0       4,501,684.0       84,908.269.0
744.0 5,087.0 141,203.0
: 19. Unit Service factor.. ......... ..... ...... .......... .                 100.0%             100.0%             72.6%
: 12. Number of Hours Reactor was critical.................
: 20. Unit Availability Factor.................       ...............          100.0%             100.0%             72.6%
744.0 5,087.0 105,492.7
: 21. Unit capacity Factor (using MDC   Net)...............         ... .        84.5%               98.3%             67.3% I
: 13. Reactor Reserve Shutdown Hours................
: 22. Unit Capacity Factor (using DER Not).. ...       ..............            83.9%               97.6%             66.3%
0.0 0.0 6,826.8
1 J
: 14. Hours Generator On-Line...............................
: 23. Forced Outage Rate............     .... ...... ............                  0.0%               0.0%             10.3%
744.0 5,087.0 102,527.9
: 15. Unit Reserve Shutdown Hours..........
0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (MWH)......
........... 1,820,747.3 14,361,221.5 272,813,457.9
: 17. Cross Electrical Energy Generated (MWH).............
600,165.0 4,736,345.0 89,651,702.0
: 18. Net Electrical Energy Generated (MWH).....
565,845.0 4,501,684.0 84,908.269.0
: 19. Unit Service factor.................................
100.0%
100.0%
72.6%
: 20. Unit Availability Factor.................
100.0%
100.0%
72.6%
: 21. Unit capacity Factor (using MDC Net)...............
84.5%
98.3%
67.3%
: 22. Unit Capacity Factor (using DER Not).....
83.9%
97.6%
66.3%
J
: 23. Forced Outage Rate............
0.0%
0.0%
10.3%
l
l
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_ Refueling, 09/09/94, 48 days 25.'If Shutdown at end of Report Period, estimated time of Startup:_N/A
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_ Refueling, 09/09/94, 48 days 25.'If Shutdown at end of Report Period, estimated time of Startup:_N/A
: 26. Units in Test Status (Prior to Consnercial Operation):
: 26. Units in Test Status (Prior to Consnercial Operation):
Forecast         Achieved INITIAL CRITICALITY                                                                                 j l
Forecast Achieved INITIAL CRITICALITY j
INITIAL ELECTRICITY COMMERCIAL OPERATION
INITIAL ELECTRICITY COMMERCIAL OPERATION


AVERAGE DAILY UNIT POWER LEVEL Docket No.:       50-338 Unit:               NA-1 Date:           August   5, 1994
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unit:
NA-1 Date:
August 5,
1994


==Contact:==
==Contact:==
J. A. Stall Phone:       (703) 894-2101 MONTH:   July 1994 DAY     AVERAGE DAILY POWER             DAY     AVERAGE DAILY POWER LEVEL (MWe-Net)                           LEVEL (MWe-Net) 1               846                     17                 748 2               833                     18                 745 3               831                     19                 745 4               828                     20                 742 5               824                     21                 737 6               821                     22                 716 7               818                     23                 717 8               810                     24                 714 9               790                     25                 712 10               789                     26                 710 11               785   i                  27                 708 12               783                     28                 691 13               780                     29                 687 14               777                     30                 685         ;
J.
15               774                     31                 683         l 16               748 Instructions:
A.
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.         Compute to the nearest whole megawatt.
Stall Phone:
(703) 894-2101 MONTH:
July 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 846 17 748 2
833 18 745 3
831 19 745 4
828 20 742 5
824 21 737 6
821 22 716 7
818 23 717 8
810 24 714 9
790 25 712 10 789 26 710 i
11 785 27 708 12 783 28 691 13 780 29 687 14 777 30 685 15 774 31 683 16 748 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.


l NORTH ANNA POWER STATION
NORTH ANNA POWER STATION UNIT NO.:
    ~
1
UNIT NO.:   1 MONTH:     Julv
~
MONTH:
Julv


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a
Date         Time                 Data July 01, 1994       0000     Began month with unit at 96% power, 905 MWe in a   power coastdown for upcoming refueling outage.
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
July 31, 1994       2400     Ended month with unit at 76% power, 730 MWe in a   power coastdown for upcoming refueling outage.
Date Time Data July 01, 1994 0000 Began month with unit at 96% power, 905 MWe in a
l l
power coastdown for upcoming refueling outage.
July 31, 1994 2400 Ended month with unit at 76% power, 730 MWe in a
power coastdown for upcoming refueling outage.
l l
l l
l


Page 1 of 1 )
Page 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet 1
of 1
Docket No.:     50-338                     '
)
Report Month Julv Unit Name:       NA-1 Year:   1994   Date: August 5, 1994
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month Julv Unit Name:
NA-1 Year:
1994 Date: August 5,
1994


==Contact:==
==Contact:==
J. A. Stall
J.
      *No entry this month.
A.
Stall
*No entry this month.


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                               -
UNIT SHUTDOWNS AND POWER REDUCTIONS
                                                                                                                                                                  ~
~
DOCKET NO.: 50-338 UNIT NAME:                                               NA-1 DATE: August 5, 1994 REPORT MONTH: July 1994                     CONTACT: J. A. Stall PHONE: (703) 894-2101 1               _2           3                   4           5 No. Date                   Type   Duration Reason   Method of   Licensee   System   Component       Cause & Corrective (hrs)             Shutting.     Event     Code       Code               Action to Down Reactor Report #                             Prevent Recurrence
DOCKET NO.:
50-338 UNIT NAME:
NA-1 DATE: August 5, 1994 REPORT MONTH: July 1994 CONTACT:
J. A.
Stall PHONE: (703) 894-2101 1
_2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting.
Event Code Code Action to Down Reactor Report #
Prevent Recurrence
*No entry this month.
*No entry this month.
1: Type                 2: Reason                                               3: Method             4:
1: Type 2: Reason 3: Method 4:
F= Forced                   A= Equipment Failure (explain)                     1= Manual             Exhibit F - I-ntructions S= Scheduled                 B= Maintenance or Test                           2= Manual Scram       for preparation of Data C= Refueling                                     3= Automatic Scram     Entry Sheets for Licensee D= Regulatory Restriction                         4= Continuations       Event Report (LER) File E= Operator Training & License Examination       5= Load Reduction       (NUREG-0161)
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - I-ntructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative                                 9=Other G= Operational Error                                                     5:
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)                                                         Exhibit H - Same Source
H=Other (explain)
Exhibit H - Same Source


                                                                                                  ~
~
    .*                                                              OPERATING DATA REPORT DOCKET NO.:     50-339 DATE: August 5, 1994 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.:
: 1. Unit Name:     .........................                            ... North Anna 2
50-339 DATE: August 5, 1994 CONTACT:
: 2. R epor t i ng Per i od : . . . . . . . . . . . . . . . . . . . . . . . . J u l y 1994
J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.
: 3. Licensed Thermal Power (MWt):........                             .. .              2893
Unit Name:
: 4. Nameplate Rating (Gross MWe):...                       ....... .                    979
... North Anna 2 2.
: 5. Design Electrical Rating (Net MWe):..                             ....                907
R epor t i ng Per i od :........................ J u l y 1994 3.
: 6. Maxirum Dependable Capacity (Gross MWe):..                                           935
Licensed Thermal Power (MWt):........
: 7. Maximum Dependable Capacity (Net MWe):.                               .              887
2893 4.
: 8. If changes occur in Capacity Ratings (!tems No. 3 thru 7) since last report, give reasons: __N/A I
Nameplate Rating (Gross MWe):...
1
979 5.
: 9. Power level to which restricted, if any (Net MWe): ___N/A
Design Electrical Rating (Net MWe):..
: 10. Reasons for restrictions, if any:                                                         N/A This Month           Y-t-D         Cumulative       l
907 6.
: 11. Hours in Reporting         Period..................                         . ...........          744.0             5,087.0       119,471.0
Maxirum Dependable Capacity (Gross MWe):..
: 12. Number of Hours Reactor was Cri t ical . . . . . . . . . . . . . . . . . . .                         744.0             4,886.9         99,260.5
935 7.
: 13. Reactor Reserve Shutdown Hours........                               .    . ... .........            0.0               95.7         6,508.9
Maximum Dependable Capacity (Net MWe):.
: 14. Hours Generator On Line..................................                                           744.0             4,845.3         98,162.7
887 8.
: 15. Unit Reserve Shutdown Hours..............................                                             0.0                 0.0             0.0
If changes occur in Capacity Ratings (!tems No. 3 thru 7) since last report, give reasons: __N/A 1
: 16. Gross Thermal Energy Generated (MWH) ....... ........... 2,152,062.2                                             13,779,448.7     266,005,106.4
9.
: 17. Gross E lec t rical Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . .                 691,945.0       4,455,705.0     87,051,181.0
Power level to which restricted, if any (Net MWe): ___N/A
: 18. Net Electrical Energy Generated                       (MWH)....................                 656,804.0       4,234,283.0     83,283,984.0
: 10. Reasons for restrictions, if any:
: 19. Unit Service Factor.. ............ ..                             ...................              100.0%               95.2%           82.2%
N/A This Month Y-t-D Cumulative
: 20. Unit Availability Factor...........                           .................. ..                100.0%               95.2%           82.2%
: 11. Hours in Reporting Period..................
: 21. Unit Capacity Factor (using MDC Net)..... .. ...........                                              99.5%               93.8%           77.4%
744.0 5,087.0 119,471.0
: 22. Unit Capacity Factor (using DER Net). ... ..............                                              97.3%               91.8%           76.9%
: 12. Number of Hours Reactor was Cri t ical...................
: 23. Forced Outage Rate.................                           ....................                    0.0%               4.8%             5.4%
744.0 4,886.9 99,260.5
: 13. Reactor Reserve Shutdown Hours........
0.0 95.7 6,508.9
: 14. Hours Generator On Line..................................
744.0 4,845.3 98,162.7
: 15. Unit Reserve Shutdown Hours..............................
0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (MWH).................. 2,152,062.2 13,779,448.7 266,005,106.4
: 17. Gross E lec t rical Energy Generat ed (MWH)..................
691,945.0 4,455,705.0 87,051,181.0
: 18. Net Electrical Energy Generated (MWH)....................
656,804.0 4,234,283.0 83,283,984.0
: 19. Unit Service Factor................
100.0%
95.2%
82.2%
: 20. Unit Availability Factor...........
100.0%
95.2%
82.2%
: 21. Unit Capacity Factor (using MDC Net).....
99.5%
93.8%
77.4%
: 22. Unit Capacity Factor (using DER Net).
97.3%
91.8%
76.9%
: 23. Forced Outage Rate.................
0.0%
4.8%
5.4%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):, Refueling, 03/11/95, 60 days
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):, Refueling, 03/11/95, 60 days
: 25. If Shutdown at end of Report Period, estimated time of Startup:                                               N/A
: 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast         Achieved 1NITIAL CRITICALITY INITIAL ELECTRICITY LOMMERCIAL OPERATION
Forecast Achieved 1NITIAL CRITICALITY INITIAL ELECTRICITY LOMMERCIAL OPERATION


      ,                      AVERAGE DAILY UNIT POWER LEVEL Docket No.:       50-339 Unit:               NA-2 Date:         August   5, 1994
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-339 Unit:
NA-2 Date:
August 5,
1994


==Contact:==
==Contact:==
J. A. Stall Phone:       (703) 894-2101 MONTH:   July 1994 DAY     AVERAGE DAILY POWER           DAY     AVERAGE DAILY POWER LEVEL (MWe-Net)                         LEVEL (MWe -Ne t) 1               886                   17                 883 2               886                   18                 882 3               885                   19                 882 4               885                   20                 882 5               884                   21                 882 6               882                   22                 882 7               883                   23                 883 8               883                   24                 883 9               882                   25                 883 10               882                   26                 884 11               882                   27                 884 12               882                   28                 884 13               882                   29                 884 14               882                   30                 884 15               876                   31                 884 16               882 Instructions:
J.
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.       Compute to the nearest whole megawatt.
A.
Stall Phone:
(703) 894-2101 MONTH:
July 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe -Ne t) 1 886 17 883 2
886 18 882 3
885 19 882 4
885 20 882 5
884 21 882 6
882 22 882 7
883 23 883 8
883 24 883 9
882 25 883 10 882 26 884 11 882 27 884 12 882 28 884 13 882 29 884 14 882 30 884 15 876 31 884 16 882 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.


                                                                              )
)
NORTH ANNA POWER STATION                               )
NORTH ANNA POWER STATION
UNIT NO.: 2 MONTH:   Julv
)
UNIT NO.:
2 MONTH:
Julv


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary ot       operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary ot operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
l Date         Time               Data July 01, 1994       0000     Began month with unit at 100% power, 934 MWe.
l Date Time Data July 01, 1994 0000 Began month with unit at 100% power, 934 MWe.
July 15, 1994       0802     Commenced unit ramp-down for TVFT.
July 15, 1994 0802 Commenced unit ramp-down for TVFT.
0830     Unit stable at 94% power, 872 MWe for TVFT.
0830 Unit stable at 94% power, 872 MWe for TVFT.
0945     TVFT completed satisfactorily.
0945 TVFT completed satisfactorily.
0947     Commenced unit ramp-up to 100% power.
0947 Commenced unit ramp-up to 100% power.
1400     Unit stable at 100% power, 922 MWe.
1400 Unit stable at 100% power, 922 MWe.
July 31, 1994       2400     Ended month with unit at 100% power, 925 MWe.
July 31, 1994 2400 Ended month with unit at 100% power, 925 MWe.
e 1
e 1


Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:     50-339 l
Page 1
1 Report Month Julv Unit Name:       NA-2 Year:   1994   Date: Auaust 5, 1994           l
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 1
Report Month Julv Unit Name:
NA-2 Year:
1994 Date: Auaust 5, 1994 l


==Contact:==
==Contact:==
J. A. Stall
J.
* No entry this month.
A.
I
Stall No entry this month.
a--
a-u
-. a r-'


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                                 -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
DOCKET NO.:                                                                     50-339 UNIT NAME:                                                                       NA-2 DATE: August 5, 1994 REPORT MONTH: July 1994                                                                   CONTACT: J. A. Stall PHONE:                                                                 ',7 0 3 ) 894-2101 1                 2             3                                                               4             5 No. Date   Type   Duration Reason     Method of   Licensee                                               System   Component                                                               Cause & Corrective (hrs)             Shutting             Event                                         Code       Code                                                                               Action to Down Reactor Report #                                                                                                                                 Prevent Recurrence ONo entry this month.
50-339 UNIT NAME:
1: Type       2: Reason                                                                                     3: Method                       4:
NA-2 DATE: August 5, 1994 REPORT MONTH: July 1994 CONTACT:
F= Forced     A= Equipment Failure (explain)                                                                 1= Manual                                   Exhibit F- Instzdctions S= Scheduled B= Maintenance or Test                                                                         2= Manual Scram                             for prepara* ion o'                                                 lata C= Refueling                                                                                   3= Automatic Scram                         Entry Sheets for Licensee D= Regulatory Restriction                                                                     4= Continuations                           Event Report (LER) File E= Operator Training & License Examination                                                     5= Load Reduction                               (NUREG-0161)
J.
F= Administrative                                                                             9=Other G= Operational Error                                                                                                           5:
A.
H=Other (explain)                                                                                                                         Exhibit H - Same Source
Stall PHONE:
                                                                                                            ?
',7 0 3 ) 894-2101 1
_ _ _ _ _ _ _ - _ - _ _ _ _ - _ - _ _ - _ _ _ _ .                        _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - - _ _ _ _ - _ _}}
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence ONo entry this month.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F-Instzdctions S= Scheduled B= Maintenance or Test 2= Manual Scram for prepara* ion o' lata C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
?
-}}

Latest revision as of 05:36, 15 December 2024

Monthly Operating Repts for July 1994 for North Anna Power Station Units 1 & 2
ML20072D710
Person / Time
Site: North Anna  
Issue date: 07/31/1994
From: Ohanlon J, Stall J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
94-461, NUDOCS 9408190199
Download: ML20072D710 (12)


Text

1 o

ViumNIA HLECTRIC AND POWER CObWANY l

i li t e n x ox n, VI H OINI A 20261 August 10, 1994 U. S. Nuclear Regulatory Commission Serial No.94-461 Attention: Document Control Desk NL&P/GSS Washington, D.C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of July 1994.

Very truly yours, d,y>w b

Le

' ames P. O'Hanlon Senior Vice President - Nuclear Enclosure cc:

U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorier NRC Senior Resident Inspector North Anna Power Station Mr. John P. Edwards Old Dominion Electric Cooperative 4201 Dominion Blvd,3rd Floor Glen Allen, Virginia 23060 i C!!) P,7 Q 9408190199 94o733 1

{DR ADOCK c500033s i

g PDR

VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:

Julv YEAR:

1994 Approved:

d Station Manager

4 OPERATING DATA REPO3T DOCKET NO.:

50-338 DATE: August 5, 1994 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.

Unit Name:................................ North Anna 1 2.

Reporting Period:......................... July 1994 3.

Licensed Thermal Power (MWt):.............

2,893 4.

Nameplate Rating (Gross MWe):...

994 5.

Design Electrical Rating (Net MWe):.......

907 6.

Maximum Dependable capacity (Gross MWe):..

948 7.

Maximum Dependable Capacity (Net MWe):

900 8.

If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:_N/A 9.

Power level to which restricted, if any (Net MWe. _ N/A

10. Reasons for restrictions, if any:

N/A This Month Y-t D Cumulative

11. Hours in Reporting Period.............................

744.0 5,087.0 141,203.0

12. Number of Hours Reactor was critical.................

744.0 5,087.0 105,492.7

13. Reactor Reserve Shutdown Hours................

0.0 0.0 6,826.8

14. Hours Generator On-Line...............................

744.0 5,087.0 102,527.9

15. Unit Reserve Shutdown Hours..........

0.0 0.0 0.0

16. Gross Thermal Energy Generated (MWH)......

........... 1,820,747.3 14,361,221.5 272,813,457.9

17. Cross Electrical Energy Generated (MWH).............

600,165.0 4,736,345.0 89,651,702.0

18. Net Electrical Energy Generated (MWH).....

565,845.0 4,501,684.0 84,908.269.0

19. Unit Service factor.................................

100.0%

100.0%

72.6%

20. Unit Availability Factor.................

100.0%

100.0%

72.6%

21. Unit capacity Factor (using MDC Net)...............

84.5%

98.3%

67.3%

22. Unit Capacity Factor (using DER Not).....

83.9%

97.6%

66.3%

J

23. Forced Outage Rate............

0.0%

0.0%

10.3%

l

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_ Refueling, 09/09/94, 48 days 25.'If Shutdown at end of Report Period, estimated time of Startup:_N/A
26. Units in Test Status (Prior to Consnercial Operation):

Forecast Achieved INITIAL CRITICALITY j

INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-338 Unit:

NA-1 Date:

August 5,

1994

Contact:

J.

A.

Stall Phone:

(703) 894-2101 MONTH:

July 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 846 17 748 2

833 18 745 3

831 19 745 4

828 20 742 5

824 21 737 6

821 22 716 7

818 23 717 8

810 24 714 9

790 25 712 10 789 26 710 i

11 785 27 708 12 783 28 691 13 780 29 687 14 777 30 685 15 774 31 683 16 748 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

NORTH ANNA POWER STATION UNIT NO.:

1

~

MONTH:

Julv

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a

summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data July 01, 1994 0000 Began month with unit at 96% power, 905 MWe in a

power coastdown for upcoming refueling outage.

July 31, 1994 2400 Ended month with unit at 76% power, 730 MWe in a

power coastdown for upcoming refueling outage.

l l

l

Page 1

of 1

)

UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-338 Report Month Julv Unit Name:

NA-1 Year:

1994 Date: August 5,

1994

Contact:

J.

A.

Stall

  • No entry this month.

UNIT SHUTDOWNS AND POWER REDUCTIONS

~

DOCKET NO.:

50-338 UNIT NAME:

NA-1 DATE: August 5, 1994 REPORT MONTH: July 1994 CONTACT:

J. A.

Stall PHONE: (703) 894-2101 1

_2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting.

Event Code Code Action to Down Reactor Report #

Prevent Recurrence

  • No entry this month.

1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - I-ntructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source

~

OPERATING DATA REPORT DOCKET NO.:

50-339 DATE: August 5, 1994 CONTACT:

J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.

Unit Name:

... North Anna 2 2.

R epor t i ng Per i od :........................ J u l y 1994 3.

Licensed Thermal Power (MWt):........

2893 4.

Nameplate Rating (Gross MWe):...

979 5.

Design Electrical Rating (Net MWe):..

907 6.

Maxirum Dependable Capacity (Gross MWe):..

935 7.

Maximum Dependable Capacity (Net MWe):.

887 8.

If changes occur in Capacity Ratings (!tems No. 3 thru 7) since last report, give reasons: __N/A 1

9.

Power level to which restricted, if any (Net MWe): ___N/A

10. Reasons for restrictions, if any:

N/A This Month Y-t-D Cumulative

11. Hours in Reporting Period..................

744.0 5,087.0 119,471.0

12. Number of Hours Reactor was Cri t ical...................

744.0 4,886.9 99,260.5

13. Reactor Reserve Shutdown Hours........

0.0 95.7 6,508.9

14. Hours Generator On Line..................................

744.0 4,845.3 98,162.7

15. Unit Reserve Shutdown Hours..............................

0.0 0.0 0.0

16. Gross Thermal Energy Generated (MWH).................. 2,152,062.2 13,779,448.7 266,005,106.4
17. Gross E lec t rical Energy Generat ed (MWH)..................

691,945.0 4,455,705.0 87,051,181.0

18. Net Electrical Energy Generated (MWH)....................

656,804.0 4,234,283.0 83,283,984.0

19. Unit Service Factor................

100.0%

95.2%

82.2%

20. Unit Availability Factor...........

100.0%

95.2%

82.2%

21. Unit Capacity Factor (using MDC Net).....

99.5%

93.8%

77.4%

22. Unit Capacity Factor (using DER Net).

97.3%

91.8%

76.9%

23. Forced Outage Rate.................

0.0%

4.8%

5.4%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):, Refueling, 03/11/95, 60 days
25. If Shutdown at end of Report Period, estimated time of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved 1NITIAL CRITICALITY INITIAL ELECTRICITY LOMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-339 Unit:

NA-2 Date:

August 5,

1994

Contact:

J.

A.

Stall Phone:

(703) 894-2101 MONTH:

July 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe -Ne t) 1 886 17 883 2

886 18 882 3

885 19 882 4

885 20 882 5

884 21 882 6

882 22 882 7

883 23 883 8

883 24 883 9

882 25 883 10 882 26 884 11 882 27 884 12 882 28 884 13 882 29 884 14 882 30 884 15 876 31 884 16 882 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

)

NORTH ANNA POWER STATION

)

UNIT NO.:

2 MONTH:

Julv

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary ot operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

l Date Time Data July 01, 1994 0000 Began month with unit at 100% power, 934 MWe.

July 15, 1994 0802 Commenced unit ramp-down for TVFT.

0830 Unit stable at 94% power, 872 MWe for TVFT.

0945 TVFT completed satisfactorily.

0947 Commenced unit ramp-up to 100% power.

1400 Unit stable at 100% power, 922 MWe.

July 31, 1994 2400 Ended month with unit at 100% power, 925 MWe.

e 1

Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-339 1

Report Month Julv Unit Name:

NA-2 Year:

1994 Date: Auaust 5, 1994 l

Contact:

J.

A.

Stall No entry this month.

a--

a-u

-. a r-'

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-339 UNIT NAME:

NA-2 DATE: August 5, 1994 REPORT MONTH: July 1994 CONTACT:

J.

A.

Stall PHONE:

',7 0 3 ) 894-2101 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence ONo entry this month.

1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F-Instzdctions S= Scheduled B= Maintenance or Test 2= Manual Scram for prepara* ion o' lata C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source

?

-