SCE ACTION PLAN FOR IMPROVEMENT OF THE OPERATION OF SAN ONOFRE NUCLEAR GENERATING STATION units a ^uo 3 O                         JULY 5, 1983 O
SCE ACTION PLAN FOR IMPROVEMENT OF THE OPERATION OF SAN ONOFRE NUCLEAR GENERATING STATION units a ^uo 3 O
t                       _
JULY 5, 1983 O
8300230221 830017 DR ADOCK 0500036y u__
t 8300230221 830017 DR ADOCK 0500036y u


TABLE OF CONTENTS i 'O I                           I. Preface                                                             1 1
TABLE OF CONTENTS i 'O I
;                            II. Executive Summary                                                     2
I.
;                            III. Introduction                                                         5 i
Preface 1
i                            IV. Recommendations and Action Plan                                       9 1
1 II. Executive Summary 2
4                            V. Appendix j                                   1. Categorization of Major Recommendations                           I
III. Introduction 5
;                                            with Specific-Recomendations                 -
i i
;                                  2. MAC Report I
IV. Recommendations and Action Plan 9
1 V.
Appendix 4
I j
1.
Categorization of Major Recommendations with Specific-Recomendations 2.
MAC Report I
i
i
}
}
l 4
l 4
i o
i o i
i 1
1 i
i 1
1 I
I l-4 4
l-4 4
i t
i O
O i'
t i '
L ~ ,. ., m
L ~,.., m


I. PREFACE The purpose of this report is to describe the action plans developed for responding to recommendations made by Management Analysis Company (MAC) for improvement of the operation of San Onofre Nuclear Generating Station, Units 2 and 3.
I.
d This report addresses all of the recommendations made by MAC and includes action plans                           : developed by SCE in response to each recommendation.
PREFACE The purpose of this report is to describe the action plans developed for responding to recommendations made by Management Analysis Company (MAC) for improvement of the operation of San Onofre Nuclear Generating Station, Units 2 and 3.
d This report addresses all of the recommendations made by MAC and includes action plans
: developed by SCE in response to each recommendation.
'N
'N
;3
;3 O
. O 4
4
    .O t
.O t
_i_
_i_


II.           EXECUTIVE  
II.
EXECUTIVE  


==SUMMARY==
==SUMMARY==
~
During the high activity period associated with power ascension testing of San Onofre Units 2 and 3 concerns developed with the adequacy of regulatory compliance.
These concerns resulted in a Nuclear Regulatory Commission enforcement conference with SCE on March 7, 1983.
In addition to action.already underway to ensure adequate levels of compliance immediate actions were taken directly as a result of this enforcement conference.
Included in these actions was engaging Management Analysis Company (MAC) to develop recommendations for the improvement of the operation of San Onofre Nuclear Generating Station, Units 2 and 3.
The result of the study performed by MAC was a number of broad major recommendations and several associated specific recommendations.
N r
O-The broad major recommendatiens are:
o Reaffirm that safety and compliance take precedence in any conflict with schedule objectives.
o Clearly establish that the Station is the lead organization.
o Integrate qualified Project personnel into the Station organization.
AV( _.,.


                                                                                                                                      ~
o Improve conditions in the control room area, focusing especially O
During the high activity period associated with power ascension testing of San Onofre Units 2 and 3 concerns developed with the adequacy of regulatory compliance.      These concerns resulted in a Nuclear Regulatory Commission enforcement conference with SCE on March 7, 1983.
upo# coasestioa. oistractio#s. commuaicetieas eae erste opereatiitr status information.
In addition to action .already underway to ensure adequate levels of compliance immediate actions were taken directly as a result of this enforcement conference.      Included in these actions was engaging Management Analysis Company (MAC) to develop recommendations for the improvement of the operation of San Onofre Nuclear Generating Station, Units 2 and 3.                                    The result of the study performed by MAC was a number of broad major recommendations and several r      associated specific recommendations.                                                    N O-The broad major recommendatiens are:
o Complete development in specific areas of the Station Technical support function.
o     Reaffirm that safety and compliance take precedence in any conflict with schedule objectives.
o Establish a Station work management function to coordinate all work activities.
o    Clearly establish that the Station is the lead organization.
1 o
o    Integrate qualified Project personnel into the Station organization.
Integrate Start-up Maintenance into Station Maintenance.
A V
i o
(
Improve the reporting of compliance issues by the safety review and quality assurance functions.
 
Also improve the tracking and timeliness of corrective action taken in respen: to the: 1: sues.
o    Improve conditions in the control room area, focusing especially O                                                                       opereatiitr    -
o Develop top level policies and administrative control procedures which define and clarify the functions, responsibilities and accountabilities of SONGS-related organizations.
upo# coasestioa. oistractio#s. commuaicetieas eae erste status information.
o Improve communications between and within SONGS organizations.
o   Complete development in specific areas of the Station Technical support function.
o   Establish a Station work management function to coordinate all work activities.
1 o   Integrate Start-up Maintenance into Station Maintenance.
i o   Improve the reporting of compliance issues by the safety review and
_          quality   assurance   functions. Also improve   the tracking and timeliness of corrective action taken in respen: to the: 1: sues.
o   Develop top level policies and administrative control procedures which   define   and clarify   the functions,   responsibilities and accountabilities of SONGS-related organizations.
o   Improve communications between and within SONGS organizations.
SCE studied these recommendations in consultation with MAC and developed action plans for each specific recommendation within these broad major t
SCE studied these recommendations in consultation with MAC and developed action plans for each specific recommendation within these broad major t
recommendations.                                                         Individuals within SCE were assigned responsibility and a O     schedule was developed for implementation of each action plan item associated with each specific recommendation.
recommendations.
MAC stated in their report " Development and implementation of specific action plans by SCE management addressing the MAC recommendations should result in improved performance in the operation of SONGS."                                                                                                                                                                 SCE agrees with that conclusion and also believes implementation of the specific action plans detailed in Section IV of this report will significantly improve regulatory compliance.
Individuals within SCE were assigned responsibility and a O
O                                                                                                                                                                                                                           -
schedule was developed for implementation of each action plan item associated with each specific recommendation.
I I
MAC stated in their report " Development and implementation of specific action plans by SCE management addressing the MAC recommendations should result in improved performance in the operation of SONGS."
a M
SCE agrees with that conclusion and also believes implementation of the specific action plans detailed in Section IV of this report will significantly improve regulatory compliance.
1 I
O I
i
I a
              .O r
M 1
t
I i
                                                                                                                                                                                                .4_
.O t
r
.4_
l i
l i
                ,.                                    . . _ - ~ _ . . - , , - - - - - , _ . , , , , _ , . - , , - . - . . _ , , . , , , _ , _ , , . , - . . - _ . . _ .                                                                                    -      . _.
.. _ - ~ _.. -,, - - - - -, _.,,,, _,. -,, -. -.. _,,.,,, _, _,,., -.. - _.. _.


III. INTRODUCTION O                                                                                         -
III.
San Onofre Nuclear Generating Station, Units 2 and 3 are duplicate 1140 MW nuclear power plants.     The Nuclear Steam Supply Systems were supplied by Combustion Engineering.     The Architect Engineer and Constructor was Bechtel Corporation.
INTRODUCTION O
    - A low power license for Unit 2 wa.s granted on February 16, 1982.       Fuel was loaded and initial criticality was achieved on July 26, 1982.       A full power license was received on September         7, 1982 and the unit synchronized on September 20, 1982. By March 1983 Unit 2 had operated up to 50% pcwer.
San Onofre Nuclear Generating Station, Units 2 and 3 are duplicate 1140 MW nuclear power plants.
;    A low power license was granted on November 15, 1982 for Unit 3.     Fuel loading was completed and a full power license was being requested for March 28, 1983.
The Nuclear Steam Supply Systems were supplied by Combustion Engineering.
    -In early March 1983, Unit 2 was still undergoing startup testing at the 50%
The Architect Engineer and Constructor was Bechtel Corporation.
power level and Unit 3 was proceeding at a pace which would result in power
- A low power license for Unit 2 wa.s granted on February 16, 1982.
;    testing in parallel with completion of Unit 2 power testing. This resulted in a high level of activity in the Project, Station and Organizations supporting the startup and operation of San Onofre.
Fuel was loaded and initial criticality was achieved on July 26, 1982.
During this period of high activity associated with power ascension, concerns with regulatory compliance developed.       These concerns resulted in a Nuclear Regulatory Commission enforcement conference with SCE on March 7,1983.
A full power license was received on September 7,
1982 and the unit synchronized on September 20, 1982. By March 1983 Unit 2 had operated up to 50% pcwer.
A low power license was granted on November 15, 1982 for Unit 3.
Fuel loading was completed and a full power license was being requested for March 28, 1983.
-In early March 1983, Unit 2 was still undergoing startup testing at the 50%
power level and Unit 3 was proceeding at a pace which would result in power testing in parallel with completion of Unit 2 power testing.
This resulted in a high level of activity in the Project, Station and Organizations supporting the startup and operation of San Onofre.
During this period of high activity associated with power ascension, concerns with regulatory compliance developed.
These concerns resulted in a Nuclear Regulatory Commission enforcement conference with SCE on March 7,1983.
t i
t i
Although SCE had already recognized the need, and was taking action, to deal O aggressively with many of tnese compliance issues, additional immediate action was taken to resped to the enforcement conference.
Although SCE had already recognized the need, and was taking action, to deal O
This action was initiated by Mr. William R. Gould, Chairman of the Board and Chief Executive Officer. The direction provided by Mr. Gould and the current status with respect to each item is presented below:
aggressively with many of tnese compliance issues, additional immediate action was taken to resped to the enforcement conference.
o   Startup of Unit 3 was deferred until adequate personnel resources were available to proceed and only when it would not in any way interfere with activities proceeding on Unit       2. As of mid-June 1983, Unit 2 has achieved 100". power and most testing has been completed.
This action was initiated by Mr. William R. Gould, Chairman of the Board and Chief Executive Officer.
The direction provided by Mr. Gould and the current status with respect to each item is presented below:
o Startup of Unit 3 was deferred until adequate personnel resources were available to proceed and only when it would not in any way interfere with activities proceeding on Unit 2.
As of mid-June 1983, Unit 2 has achieved 100". power and most testing has been completed.
O V
O V
o   Unit 3 was not t) be taken critical until. Mr. Gould personally approves the action. This is to occur only when Unit 3 is ready to go critical and when such action will not interfere with Unit 2 safety and progress.     Currently Unit 3 criticality is forecast for     !
o Unit 3 was not t) be taken critical until. Mr. Gould personally approves the action.
l mid-July 1983 after virtually all Unit 2 testing is complete.
This is to occur only when Unit 3 is ready to go critical and when such action will not interfere with Unit 2 safety and progress.
o   Based on this guidance, and the time required to assess the situation, tne scheduled March 28, 1983 Unit 3 full-power license meeting with the Commission was delayed for at least 30 days.       On June 22, 1983 a letter was sent to NRC requesting a full power license for Unit 3 in August, 1983.
Currently Unit 3 criticality is forecast for l
O t
mid-July 1983 after virtually all Unit 2 testing is complete.
o    In order to shorten the chain of command, Mr. David J. Fogarty,
o Based on this guidance, and the time required to assess the situation, tne scheduled March 28, 1983 Unit 3 full-power license meeting with the Commission was delayed for at least 30 days.
(]      Executive Vice President,      reporting directly to Mr.              Gould was    -
On June 22, 1983 a letter was sent to NRC requesting a full power license for Unit 3 in August, 1983.
assigned direct and onsite responsibility for the continued startup of these units. This was to augment the organizational structure and capability already in place.
o    On March 14, 1383, Mr. Gould met on site with the key officers, managers and supervisors      (35 personnel) from the Station, the Project, Quality Assurance and the Engineering, Licensing and Safety staff to insure that they understood the path to be followed.                  This information    was    then  communicated                  to personnel in    these organizations at all levels.
o    Efforts  'o tighten up any procedural problems and reinforce the absolute requirement for compliance as well as timely and candid communications  with    the  NRC were            increased.      This effort  is continuing. Disciplinary action has been taken when lapses in procedural complian'ce occur.      More management involvement in and approval of communications with NRC has been and will continue to be required.
O    Mr. Gould talked with the senior of ficers o'f the primary contractor, Bechtel, and directed them to proceed on the same deliberate path as outlined to SCE personnel.
O t
O t
o In order to shorten the chain of command, Mr. David J. Fogarty,
(]
Executive Vice President, reporting directly to Mr.
Gould was assigned direct and onsite responsibility for the continued startup of these units.
This was to augment the organizational structure and capability already in place.
o On March 14, 1383, Mr. Gould met on site with the key officers, managers and supervisors (35 personnel) from the Station, the Project, Quality Assurance and the Engineering, Licensing and Safety staff to insure that they understood the path to be followed.
This information was then communicated to personnel in these organizations at all levels.
o Efforts
'o tighten up any procedural problems and reinforce the absolute requirement for compliance as well as timely and candid communications with the NRC were increased.
This effort is continuing.
Disciplinary action has been taken when lapses in procedural complian'ce occur.
More management involvement in and approval of communications with NRC has been and will continue to be required.
O Mr. Gould talked with the senior of ficers o'f the primary contractor, Bechtel, and directed them to proceed on the same deliberate path as outlined to SCE personnel.
O t --


o    A qualified outside fi rm, Management Analysis Company (MAC) was
A qualified outside fi rm, Management Analysis Company (MAC) was o
                                                                                                              ~
O(./
O(./               engaged to independently assess all aspects of the organization and                           :
~
programs to startup San Onofre in order to determine the root causes of the problems and the actions required to correct them.
engaged to independently assess all aspects of the organization and programs to startup San Onofre in order to determine the root causes of the problems and the actions required to correct them.
The objectives of the study to be conducted by MAC were:
The objectives of the study to be conducted by MAC were:
I               o   Review and appraisal of . the startup, power ascension and initial operation activities associated with SONGS Units 2 and 3.                   Rather than attempting to examine every aspect of the entire station, the effort focused on specific processes and interaction among the Engineering,       Construction,         Start-up,   Operations   and   Quality Assurance (QA) organizations.               Particular attention was given to activities associated with safety and regulatory compliance.
I o
d o   Determination of the key factors adversely affectir.g startup, power ascension, initial operation and associated management systems.
Review and appraisal of. the startup, power ascension and initial operation activities associated with SONGS Units 2 and 3.
o   In   conjunction     with         key     SCE   personnel,     development   of 4
Rather than attempting to examine every aspect of the entire station, the effort focused on specific processes and interaction among the Engineering, Construction, Start-up, Operations and Quality Assurance (QA) organizations.
Particular attention was given to activities associated with safety and regulatory compliance.
d o
Determination of the key factors adversely affectir.g startup, power ascension, initial operation and associated management systems.
o In conjunction with key SCE personnel, development of 4
recommendations that will assist them in improving perform: ace, with emphasis upon current safety and compliance issues.
recommendations that will assist them in improving perform: ace, with emphasis upon current safety and compliance issues.
This study by MAC resulted in a report to SCE entitled " Recommendation for the Improvement of the Operation of San Onofre Nuclear Generating Station, Units 2 and   3." This report is included as Appendix 2.                   SCE's planned actions in response to these recommendations are included in Section IV of this report.
This study by MAC resulted in a report to SCE entitled " Recommendation for the Improvement of the Operation of San Onofre Nuclear Generating Station, Units 2 and 3."
O t
This report is included as Appendix 2.
SCE's planned actions in response to these recommendations are included in Section IV of this report.
O t.-


l m                        IV. RECOMMENDATION AND ACTION PLANS Q                                                                                      .
IV. RECOMMENDATION AND ACTION PLANS mQ In the overview section of the MAC Report, ten major recommendations were made.
In the overview section of the MAC Report, ten major recommendations were made. In the body of the report, forty-eight recommendations were made which provide more specifics associated with each major recommendation.         Appendix 1 of this report categorizes the forty-eight specific recommendations under each of the ten major recommendations.         Some of the specific recommendations are applicable to more than one major recommendation and therefore appear more than once. Appendix 1 demonstrates the ten major recommendations are fully addressed by the forty-eight specific recommendations.           Therefore, action plans and schedules for implementation were developed for each of the                   j l
In the body of the report, forty-eight recommendations were made which provide more specifics associated with each major recommendation.
forty-eight specific recommendations.         The Management Analysis Company           '
Appendix 1 of this report categorizes the forty-eight specific recommendations under each of the ten major recommendations.
i report is provided in Appendix 2 of this report.       Tracking of the status Q of each action item will be accomplished by entering them into the Nuclear Engineering and Operation Department Commitment Register.
Some of the specific recommendations are applicable to more than one major recommendation and therefore appear more than once.
SCE had action underway for approximately 40 percent of the recommendations when MAC began tfieir study. Where appropriate, these actions are included in the following action plans.
Appendix 1 demonstrates the ten major recommendations are fully addressed by the forty-eight specific recommendations.
I The format used for presentation of the action plans consists of the MAC               '
Therefore, action plans and schedules for implementation were developed for each of the j
recommendation followed by the action plan.         In many cases the action plan 1
forty-eight specific recommendations.
cons 1sts of several action items.
The Management Analysis Company i
report is provided in Appendix 2 of this report.
Tracking of the status Q
of each action item will be accomplished by entering them into the Nuclear Engineering and Operation Department Commitment Register.
SCE had action underway for approximately 40 percent of the recommendations when MAC began tfieir study.
Where appropriate, these actions are included in the following action plans.
The format used for presentation of the action plans consists of the MAC recommendation followed by the action plan.
In many cases the action plan cons 1sts of several action items.
t
t
_9 l
_9 l
1 i
1 i


2.0           ORGANIZATION ORJECTIVES AND PRIORITIES hl MAC Recommendation 1
2.0 ORGANIZATION ORJECTIVES AND PRIORITIES hl MAC Recommendation 1
2.1           Management must continue to reinforce to SONGS personnel at all levels that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant.           This reinforcement should occur in all formal and informal communications.
2.1 Management must continue to reinforce to SONGS personnel at all levels that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant.
Action Plan 2.1.1         Convene a meeting between                       senior management and                 key officers, q                      managers and supervisors to reinforce that safety and comoliance are V
This reinforcement should occur in all formal and informal communications.
their first priority, i
Action Plan 2.1.1 Convene a meeting between senior management and key officers, managers and supervisors to reinforce that safety and comoliance are qV their first priority, i
2.1.2         Convene       similiar meetings             between       middle management                       and         their subordinates at all levels, 2.1.3         Review September 13, 1982 letter from W. R. Gould on Review Process i
2.1.2 Convene similiar meetings between middle management and their subordinates at all levels, 2.1.3 Review {{letter dated|date=September 13, 1982|text=September 13, 1982 letter}} from W. R. Gould on Review Process for Nuclear Safety Concerns.
for Nuclear Safety Concerns.                   Revise as appropriate to reinforce that safety and compliance are the first priority for employees in executing their duties.                           ,
Revise as appropriate to reinforce that i
p
safety and compliance are the first priority for employees in executing their duties.
      --w - ,    ~ - ,    . , , - , ,
p.
                                        ,        - . - , - , -o .-  - , , , .      -  ...----.-,.e-   , - - , , , - - ~ . . . - . . , . -      . , , . - , , - - . -
--w
~ -,
-o
...----.-,.e-
,,, - - ~... -..,. -


2.1.4 Research   and itemize   existing policy directed   to sa fety   and compliance as a first priority. Review this material and supplement or revise as appropriate to reinforce safety and compliance as a first priority.
2.1.4 Research and itemize existing policy directed to sa fety and compliance as a first priority.
2.1.5 Document dates for CSI meetings with Operations personnel at which priorities have been discussed. Based on this review, insure that l
Review this material and supplement or revise as appropriate to reinforce safety and compliance as a first priority.
all operating section personnel have been advised that safety and
2.1.5 Document dates for CSI meetings with Operations personnel at which priorities have been discussed.
!          compliance are the first priority. _
Based on this review, insure that l
2.1.6 Document formal     group discussions with assigned personnel       since 3/7/83 at which priorities have been discussed.           Based on this review, insure that safety and compliance as the first priority has been discussed with all maintenance, technical and health physics personnel.
all operating section personnel have been advised that safety and compliance are the first priority.
2.1.6 Document formal group discussions with assigned personnel since 3/7/83 at which priorities have been discussed.
Based on this review, insure that safety and compliance as the first priority has been discussed with all maintenance, technical and health physics personnel.
2.1.7 Obtain similar information and take similar action to that above for the Project personnel responsible for the power ascension program.
2.1.7 Obtain similar information and take similar action to that above for the Project personnel responsible for the power ascension program.
h; 2.1.8 Provide required priority emphasis in regular staff meetings and at OSRC meetings.
h; 2.1.8 Provide required priority emphasis in regular staff meetings and at OSRC meetings.
O t
O t
MAC Recommendation 0                                                                                                                                                       -
MAC Recommendation 0
2.2           Management must take action to establish the Station as lead SONGS organization                       and             specifically   identify               that   the   Station   is responsible for resolving conflicts between safety and compliance and the power ascension schedule.
2.2 Management must take action to establish the Station as lead SONGS organization and specifically identify that the Station is responsible for resolving conflicts between safety and compliance and the power ascension schedule.
Action Plan 2.2.1         Review         the             Jurisdiction               Statements       for the           Nuclear   Operations Organization and San Onofre Nuclear Generating Station and revise as appropriate to assert lead responsibility in all matters involving safety and compliance.
Action Plan 2.2.1 Review the Jurisdiction Statements for the Nuclear Operations Organization and San Onofre Nuclear Generating Station and revise as appropriate to assert lead responsibility in all matters involving safety and compliance.
A V                  Review the Jurisdiction Statements for the Project and revise as 2.2.2                                                                                                                                            .
AV 2.2.2 Review the Jurisdiction Statements for the Project and revise as appropriate to indicate the Station is responsible for resolving conflicts between safety and compliance and the power ascension schedule.
appropriate to indicate the Station is responsible for resolving conflicts between safety and compliance and the power ascension schedule .
3.0 STATION 3.1 STATION MANAGEMENT t
3.0           STATION 3.1           STATION MANAGEMENT t
MAC Recommendation 3.1.1 Make maximum use of qualified Project personnel (also processes and CNJ systems) to infuse plant knowledge and experience into tne Station
MAC Recommendation 3.1.1         Make maximum use of qualified Project personnel (also processes and C
NJ                systems) to infuse plant knowledge and experience into tne Station
(
(
organization.
organization.


Action Plan
Action Plan I)
                                                                                          ~
~
I)s 3.1.1.1 Identify and plan for opportunities to achieve integration.
s 3.1.1.1 Identify and plan for opportunities to achieve integration.
3.1.1.2 Carry forward plans to integrate qualified Project personnel in the Maintenance area.              .
3.1.1.2 Carry forward plans to integrate qualified Project personnel in the Maintenance area.
3.1.1.3 Identify Project processes and systems that can be utilized in the Station which have not been previously transferred.       Based on this review, recommend appropriate action to utilize Project processes and
3.1.1.3 Identify Project processes and systems that can be utilized in the Station which have not been previously transferred.
                                          ~      '
Based on this review, recommend appropriate action to utilize Project processes and systems in the Station.
systems in the Station.
~
MAC Recommendation 3.1.2   Establish development plans for each manager and supervisor.       Such plans should identify specific managerial strengths and weaknesses and establish priorities and target dates for improvement.
MAC Recommendation 3.1.2 Establish development plans for each manager and supervisor.
l Action Plan 3.1.2.1 Bring   APS   performance     appraisal   proce s current.
Such plans should identify specific managerial strengths and weaknesses and establish priorities and target dates for improvement.
l Action Plan 3.1.2.1 Bring APS performance appraisal proce s current.
l O
l O
t
t <


3.2             OPERATI0t4S O
3.2 OPERATI0t4S O
We (MAC) collected information on operations from a cross-section of the organization, including Startup and the operators themselves.
We (MAC) collected information on operations from a cross-section of the organization, including Startup and the operators themselves.
A number of positive actions have already helped the shift operations team to function more effectively. Among these are:
A number of positive actions have already helped the shift operations team to function more effectively. Among these are:
                            - Posting someone to better control access to the Control Room
- Posting someone to better control access to the Control Room
                            - Implementation of an equipment control function
- Implementation of an equipment control function
                            - Slowdown of Unit 3
- Slowdown of Unit 3
                            - Additional shift. overlap
- Additional shift. overlap
                            - Addition of clerical and other help to the shift crew MAC Recommendation 3.2.1           Although much has already been done to relieve the shift cred from distractions,   more         snould   be done. Make   significant   physical
- Addition of clerical and other help to the shift crew MAC Recommendation 3.2.1 Although much has already been done to relieve the shift cred from distractions, more snould be done.
.                          improvements in the shift supervisor's office to allow him to function better.           It should be determined why the operators do not make significant use of the plant computer.                 A study should be conducted   of       Cor *.rol     Room area activities   and   appropriate improvements implemented.
Make significant physical improvements in the shift supervisor's office to allow him to function better.
t
It should be determined why the operators do not make significant use of the plant computer.
                                                                    -- - _ .     .=. - - . -        .          - - - _ . -                                          -
A study should be conducted of Cor *.rol Room area activities and appropriate improvements implemented.
t -- - _.
.=. - -. -


                          ~
~
Action Plan 3.2.1.1 Expedite Project work to complete physical enhancements of the shift supervisor's office.
Action Plan 3.2.1.1 Expedite Project work to complete physical enhancements of the shift supervisor's office.
3.2.1.2 Provide an assessment of progress in improving operability of the r
3.2.1.2 Provide an assessment of progress in improving operability of the r
plant computer. and its use in supporting operations. Based on this assessment, recommend additional changes to improve operator use of the plant computer, if appropriate.
plant computer. and its use in supporting operations.
3.2.1.3 Following completio1 of ongoing MAC equipment control work, extend study into Control Room interface / activities. Based on the results .
Based on this assessment, recommend additional changes to improve operator use of the plant computer, if appropriate.
3.2.1.3 Following completio1 of ongoing MAC equipment control work, extend study into Control Room interface / activities.
Based on the results.
of_ the study, recommend appropriate improvements for implementation.
of_ the study, recommend appropriate improvements for implementation.
O MAC Recommendation 3.2.2   Action should be taken to ensure that the shift supervisors get out into the plant regularly. This could be La cordunction with training periods, but it should also come at times when they can interact with equipment operators and other people on their own shifts.
O MAC Recommendation 3.2.2 Action should be taken to ensure that the shift supervisors get out into the plant regularly.
This could be La cordunction with training periods, but it should also come at times when they can interact with equipment operators and other people on their own shifts.
k V
k V
L Action Plan 3.2.2.1 Through CSI meetings,     identify action needed to increase shift supervisor's   surveillance   of   plant   activities. Implement,   or recommend for approval as appropriate, such action as is warranted.
L Action Plan 3.2.2.1 Through CSI meetings, identify action needed to increase shift supervisor's surveillance of plant activities.
i               -
Implement, or recommend for approval as appropriate, such action as is warranted.
MAC Recommendation 3.2.3     The Control   Room area     study   recommended   above should   include evaluation of development of a system operability status display process. Current   system   operability   status   should   be   readily available to the operators.         The evaluation should also consider communication of plant and system status to interfacing organizations and people.
i MAC Recommendation 3.2.3 The Control Room area study recommended above should include evaluation of development of a system operability status display process.
Action Plan 3.2.3.1 These same items appear as part of the MAC equipment control study.
Current system operability status should be readily available to the operators.
The evaluation should also consider communication of plant and system status to interfacing organizations and people.
Action Plan 3.2.3.1 These same items appear as part of the MAC equipment control study.
Extend ongoing work to include valuation of these recommendations.
Extend ongoing work to include valuation of these recommendations.
Based on the results of this evaluation, propose appropriate action, if any.
Based on the results of this evaluation, propose appropriate action, if any.
MAC Recommendation 3.2.4   The operators will       benefit   greatly   from improvements     in   plant
MAC Recommendation 3.2.4 The operators will benefit greatly from improvements in plant
  .f~'
.f~'
scheduling and work coordination as identified in the following Work l
scheduling and work coordination as identified in the following Work l
;                Management section.
Management section.  
                    ~
~
Action Plan 3.2.4.1 Provide visibility for actions required to implement Work Management as currently planted.
Action Plan 3.2.4.1 Provide visibility for actions required to implement Work Management as currently planted.
MAC Recommendation 3.2.5   Make available to the operators a well-defined list of contacts, such as   systems engineers       for times when they need information or assistance.
MAC Recommendation 3.2.5 Make available to the operators a well-defined list of contacts, such as systems engineers for times when they need information or assistance.
Action Plan                                                               ,
Action Plan 3.2.5.1 Review and formalize, if necessary, on-shift information or assistance contacts.
3.2.5.1 Review   and   formalize,     if   necessary, on-shift   information or assistance contacts.                                                       .
3.2.5.2 Review and
                                                  ~
: improve, if necessary, identification of Technical
3.2.5.2 Review and     improve,     if   necessary, identification   of Technical Depa tment support to the operators.         Note similar item identified from CSI process.
~
;            MAC Recommendation 3.2.6   The Technical Specifications should be reviewed for improvements and l
Depa tment support to the operators.
Note similar item identified from CSI process.
MAC Recommendation 3.2.6 The Technical Specifications should be reviewed for improvements and l
reductions in complexity.
reductions in complexity.
1 0
1 0
1 Action Plan                                                                                   _
1 Action Plan 3.2.6.1 Provide visibility to backlog of proposed changes to the Technical Specifications and identify those in preparation.
3.2.6.1   Provide visibility to backlog of proposed changes to the Technical Specifications and identify those in preparation.       Describe ongoing review process and recommend additional action that might be taken to prioritize and expedite resolution of backlog.
Describe ongoing review process and recommend additional action that might be taken to prioritize and expedite resolution of backlog.
3.2.6.2 Review the Technical Specifications with Operations and identi fy additional changes for improvement and reduced complexity.
3.2.6.2 Review the Technical Specifications with Operations and identi fy additional changes for improvement and reduced complexity.
3.2.6.3 Establish a task force to systematically evaluate and revise the Technical Specification to reduce complexity.
3.2.6.3 Establish a task force to systematically evaluate and revise the Technical Specification to reduce complexity.
i.
Q i.
Q MAC Recommendations                               -
MAC Recommendations l
l 3.2.7   Make a joint effort, working with the systems engineers, to improve operations procedures and reduce repeat procedural mistakes.
3.2.7 Make a joint effort, working with the systems engineers, to improve operations procedures and reduce repeat procedural mistakes.
l Action Plan 3.2.7.1 Identify current activities to improve procedures and recommend how Technical Department engineers, or others, may be used to reduce procedural mistakes.
l Action Plan 3.2.7.1 Identify current activities to improve procedures and recommend how Technical Department engineers, or others, may be used to reduce procedural mistakes.
O l                                                       l l
O l l l
l
l


3.3     WORK MANAGEMENT 7
3.3 WORK MANAGEMENT 7U MAC Recomendation 3.3.1 Develop a work management function responsible for planning and coordinating maintenance, ISI, surveillance testing, design change modifications and outages.
U MAC Recomendation 3.3.1   Develop a work management function responsible for planning and coordinating maintenance, ISI, surveillance testing, design change modifications and outages. This function should be a continuous, all-shift effort with a strong, full-time work manager who reports
This function should be a continuous, all-shift effort with a strong, full-time work manager who reports
(           directly to the Station Manager.
(
Action Plan 3.3.1.1 Complete planning of this       function and   initiate   implementation O         processes-3.3.1.2 Complete hiring of a Work Manager.
directly to the Station Manager.
MAC Recommendation 3.3.2   For the long te nn, this function (work management) should include 1                                                                                         ,
Action Plan 3.3.1.1 Complete planning of this function and initiate implementation O
outage planning and management responsibility. This will establish the Station in the lead outage role. Project work during operation i
processes-3.3.1.2 Complete hiring of a Work Manager.
MAC Recommendation 3.3.2 For the long te nn, this function (work management) should include 1
outage planning and management responsibility.
This will establish the Station in the lead outage role.
Project work during operation i
and outages would be integrated into the overall Station plan and schedule.
and outages would be integrated into the overall Station plan and schedule.
I O
I O
l l                                           _19 i
l l
_19 i


      ,3            Action Plan V
3.3.2.1  Develop recommendations on wnether the Project or Station should have leadership in outage planning and management.
MAC Recommendation 3.3.3  Develop a management information system to support the work and outage planning function.      Interim processes will have to be used until this system is developed.
Action Plan
Action Plan
['~~) 3.3.3.1 Work     with   Material and Administrative Services olus Project
,3 V
        /
3.3.2.1 Develop recommendations on wnether the Project or Station should have leadership in outage planning and management.
MAC Recommendation 3.3.3 Develop a management information system to support the work and outage planning function.
Interim processes will have to be used until this system is developed.
Action Plan
['~~)
3.3.3.1 Work with Material and Administrative Services olus Project
/
representatives, to identify the scope and objectives for this system
~~
~~
representatives, to identify the scope and objectives for this system and propose assignment of responsibilities.
and propose assignment of responsibilities.
3.4     STATION TECHNICAL MAC Recommehdation 3.4.1   Define goals and objectives for Station Technical.
3.4 STATION TECHNICAL MAC Recommehdation 3.4.1 Define goals and objectives for Station Technical.


Action Plan i         3.4.1.1 Itemize existing definition of goals and objectives.           Recommend additions / revisions where warranted.
Action Plan i
MAC Recommendation i         3.4.2   Complete the development of the system engineering function which has recently been initiated.       Define the functions and responsibilities.
3.4.1.1 Itemize existing definition of goals and objectives.
l System engineers should be fully knowledgeable about the design and function of their assigned systems and components.           These system engineers should be responsible for maximizing the performance of their systems. To do this, they need a sense of commitment. Systems engineers should be responsible for providing technical support to f]
Recommend additions / revisions where warranted.
station   operators,   maintenance     and   other personnel. Specific responsibilities should include:
MAC Recommendation i
3.4.2 Complete the development of the system engineering function which has recently been initiated.
Define the functions and responsibilities.
l System engineers should be fully knowledgeable about the design and function of their assigned systems and components.
These system engineers should be responsible for maximizing the performance of their systems.
To do this, they need a sense of commitment.
Systems f]
engineers should be responsible for providing technical support to station operators, maintenance and other personnel.
Specific responsibilities should include:
~
~
                    - ISI testing.
- ISI testing.
                    - Knowing,. reviewing and improving the operating procedures and technical specifications.
- Knowing,. reviewing and improving the operating procedures and technical specifications.
                    - Being a point of contact on any problem or question related to operations, test, maintenance and modification.
- Being a point of contact on any problem or question related to operations, test, maintenance and modification.
  ,O
,O <


                  - Knowing the system operability status.
- Knowing the system operability status.
-                - Knowing about all problems and proposed resolutions.
- Knowing about all problems and proposed resolutions.
                  - Initiating plant betterment proposals.
- Initiating plant betterment proposals.
                  - Reviewing design changes for maintainability and operability.
- Reviewing design changes for maintainability and operability.
i Action Plan 3.4.2.1 Identi fy current           status           of development,         and         plans           for   future development, of system engineering functions.'                                 ~ Address each of the MAC proposed responsibilities                         for further management                           review.
i Action Plan 3.4.2.1 Identi fy current status of development, and plans for future development, of system engineering functions.'
O                                                                                                                     '
~ Address each of the MAC proposed responsibilities for further management review.
l MAC Recommendation 3.4.3   Supplement training on plant systems and administrative controls for the system engineers, shift engineers and STA's.
O l
Action Plan
MAC Recommendation 3.4.3 Supplement training on plant systems and administrative controls for the system engineers, shift engineers and STA's.
!        3.4.3.1 Identify current status of training, by groups addressed, and plans for   future   training           for           further magagement               rediew.               Recommend additional training, as appropriate.
Action Plan 3.4.3.1 Identify current status of training, by groups addressed, and plans for future training for further magagement rediew.
O t
Recommend additional training, as appropriate.
                                        , _ , ,      ,,e~_,...y,-         .,,.,--,,_,,,y   , . -        _.,_...,.._,,g,             .mv.c,. :- - , , - _e
O t..
,,e~_,...y,-
.,,.,--,,_,,,y
_.,_...,.._,,g,
.mv.c,.
:- -,, - _e


                              's MAC Recorriendation O                                                                                                                       -
's MAC Recorriendation
3.4.4   Provide qualified: shift engineers for all shifts to provide better support.
' O 3.4.4 Provide qualified: shift engineers for all shifts to provide better support.
Action Plan 3.4.4.1 Implement manning of qualified shift engineers for all shifts.
Action Plan 3.4.4.1 Implement manning of qualified shift engineers for all shifts.
3.5     MAINTENANCE MAC Recommendation
3.5 MAINTENANCE MAC Recommendation
_O 3.5.1   Integrate Startup Maintenance into Station Maintenance to:                                           resolve the responsibility and accountability issue;             take                 advantage of resources, systems and organizational units of both organizations; and, to improve maintenance planning and execution.
_O 3.5.1 Integrate Startup Maintenance into Station Maintenance to:
Action Plan 3.5.1.1 Carry on with the present schedule for transition and integration into a single maintenance organization under Station responsibility O                       .
resolve the responsibility and accountability issue; take advantage of resources, systems and organizational units of both organizations; and, to improve maintenance planning and execution.
_4_c,--- --. -,_~- , . - , - - - , -c.-r--,r..-rw.---,---.*r-w,-g.w-,--,-c,--%,
Action Plan 3.5.1.1 Carry on with the present schedule for transition and integration into a single maintenance organization under Station responsibility O
_4_c,---
--. -,_~-,
-c.-r--,r..-rw.---,---.*r-w,-g.w-,--,-c,--%,


                                                                  ~
+
                                      +
~
L           i (lI is~
L i
6'                       MAC Recommendation 0 ll  -;
(lI is~
                                    ]
0 ll 6'
        <       dfl g         3.          .
MAC Recommendation
_-3.5.2 Consider integrating Instrument and Control (I&C) Maintenance into
]
          -l'2 j                                             Station                   Maintenance         to   provide               improved   activity   planning       and v
dfl
<g
_-3.5.2 Consider integrating Instrument and Control (I&C) Maintenance into 3.
-l'2 j Station Maintenance to provide improved activity planning and v
coordination.
,. g
,. g
                      .f             ,
.f P
coordination.
.I
P              .,
'e Action Plan
              'e
                    .I
%                                                              Action Plan
]. <
]. <
l
l
                    . l, j
. l, j
3.5.2.1 Describe how I&C Maint,ena,nce would be                                                               integrated with         Station j                                        ,
3.5.2.1 Describe how I&C Maint,ena,nce would be integrated with Station Maintenance and evaluate pro ! and con issues involved.
Maintenance and evaluate pro ! and con issues involved.                                                 Provide a,
Provide a, j
                                      'i                                                                                       l                 _
'i l
                                                            ' separate evaluation for I&C Engineering.
' separate evaluation for I&C Engineering.
1 q       -
1 q
3.5.2'2                   Re' view evaluations, make' recommendations and obtain approval s, and
3.5.2'2 Re' view evaluations, make' recommendations and obtain approval s, and
  'f                   ,        -
'f implement approved plan.
7 implement approved plan.
j, 7
j,           ,
.i -
              .i -                                             I'.           1       ,                                             ,
I'.
t
1
                                                                            ,1 i                                          .
,1 t
_ ., ;g                 i , f MAC decommendation i                      .
i i, f MAC decommendation
iP
_., ;g i
  .[-                                                               , ;
.[-
e
iP e
            +                        3.513                   . Complete                       development       of       an       integrated       maintenanca . management I                                 i                       .c,
3.513
                                            ,u.-
. Complete development of an integrated maintenanca. management
                                              -        - information system as soon as possible.
+
I i
,u.-
.c,
- information system as soon as possible.
l
l
                  ,                                                                                                                    -/
-/
<r, If .'                                                                         .>
<r, If.'
b                                                             Ac+.1on Pian l
b Ac+.1on Pian l
!l
li l
                                                                              . li l i       ~
!l i
q   .5'.3.1         ; Comprqte implementation of PPMIS.
3
f        3
~
                      /; ' ;' f.                         '                '
q.5'.3.1 ; Comprqte implementation of PPMIS.
g-                                                             #                                          .r
/; ' ;' f.
'/                                                                                                             '
f g-
O 1   l l
.r
f'       -  24;
'/
                                                                                  ,                        ,p         '
: O 1
1 at                                                                                     s
l l
                                                                                                      ,  l' 3
f' 24;
_...-:,*-.--,.                    ,              , , , , . , , -    me" '                                                     .- , .-.        . _ _ - - - , - - -
,p 1
at s
l' 3
me" '


4.0   SAFETY REVIEW O
4.0 SAFETY REVIEW O
U-MAC Recommendation 4.1   Require the Onsite Review Committee (0SRC) to assume more oversight i
U-MAC Recommendation 4.1 Require the Onsite Review Committee (0SRC) to assume more oversight i
in       reviewing       plant   activities,                 schedules                       and             operations   for regulatory compliance and safety significance.
in reviewing plant activities, schedules and operations for regulatory compliance and safety significance.
Action Plan 4.1.1 Provide listing of OSRC meetings for S023 to date                                                                 (e.g., monthly ,
Action Plan 4.1.1 Provide listing of OSRC meetings for S023 to date (e.g., monthly Technical Specification and other special topic).
Technical Specification and other special topic).                                                                     ,
O.
4.1.2 Based on review of material developed in 4.1.1, develop additional O.
4.1.2 Based on review of material developed in 4.1.1, develop additional
criteria,               as appropriate,     for             involvement                         of           OSRC     in plant i                   acti viti es.
: criteria, as appropriate, for involvement of OSRC in plant i
acti viti es.
MAC Recommendation i
MAC Recommendation i
4.2   Emphasize and strengthen requirements for Nuclear Safety Group (NSG)
4.2 Emphasize and strengthen requirements for Nuclear Safety Group (NSG)
I ,
I to provide management with an overall assessment of plant safety.
to provide management with an overall assessment of plant safety.
!O
!O
;t 1
;t 1. - - _,


Action Plan 4.2.1 Review the format of the NSG monthly report and the NSG Nuclear Control Board presentations and revise the contents as necessary to provide an overall assessment of plant safety.                                       Obtain management concurrence in the suggested fo mat.
Action Plan 4.2.1 Review the format of the NSG monthly report and the NSG Nuclear Control Board presentations and revise the contents as necessary to provide an overall assessment of plant safety.
4.2.2 Implement             the   approved           format   in           subsequent         reports         and presentations.                                    .
Obtain management concurrence in the suggested fo mat.
MAC Recommendation 4.3   Establish             a   formal     system           for   follov .;           and         closecut         of recommendations submitted by the Independent Safety Engineering Group (ISEG) and NSG.                                                                 - -
4.2.2 Implement the approved format in subsequent reports and presentations.
MAC Recommendation 4.3 Establish a
formal system for follov.;
and closecut of recommendations submitted by the Independent Safety Engineering Group (ISEG) and NSG.
Action Plan e
Action Plan e
i' 4.3.1 Visibility of the status of NSG and ISEG recommendations will be enhanced by use of the NE&O Commitment Register (NEOCR) system.
i' 4.3.1 Visibility of the status of NSG and ISEG recommendations will be enhanced by use of the NE&O Commitment Register (NEOCR) system.
Input sheets were forwarded to the NE0CR coordinator on June                                                   8,              ,
Input sheets were forwarded to the NE0CR coordinator on June 8,
1983.       The next NEOCR report is expected to include these items.
1983.
The next NEOCR report is expected to include these items.
I t
I t
i                                                                                                                       ,
i,


MAC Recommendation
MAC Recommendation
                                                                                                                                              ~
~
4.4         Improve communications and interaction between the NSG and Station by clarifying the roles and requiring NSG to spend more time at the site.                                                           -
4.4 Improve communications and interaction between the NSG and Station by clarifying the roles and requiring NSG to spend more time at the site.
,              Action Plan 4.4.1       The NSG Supervisor will examine future work assignments and endeavor to structure the work to optimize interaction with the                                                 site.
Action Plan 4.4.1 The NSG Supervisor will examine future work assignments and endeavor to structure the work to optimize interaction with the site.
4.4.2       Periodically report to management regarding amount of time spent by the group working at the site..
4.4.2 Periodically report to management regarding amount of time spent by the group working at the site..
n w
n w
: 5. 0 ,   , QUALITY ASSURANCE MAC Recommendation 5.1         QA must monitor and assure performance of the line organization by providing timely information to the Vice President, NE&0.                                               The current reporting system should be reviewed to determine if adequate emphasis   is     being     communicated to       upper management               of             needed corrective       actions           and or untimely     delay         of     response               to Nonconformance Reports (NCRs) and Corrective Action Reports (CARS).
: 5. 0,
QUALITY ASSURANCE MAC Recommendation 5.1 QA must monitor and assure performance of the line organization by providing timely information to the Vice President, NE&0.
The current reporting system should be reviewed to determine if adequate emphasis is being communicated to upper management of needed corrective actions and or untimely delay of response to Nonconformance Reports (NCRs) and Corrective Action Reports (CARS).
Problems should be reported in a manner which highlights the more important issues.
Problems should be reported in a manner which highlights the more important issues.
O
O


4
4 Action Plan O
      -            Action Plan I
I 5.1.1 The Quality Assurance Organization (QA0) initiated, in April 1983, a monthly "QA Concerns" Program report, in addition to the existing l
O 5.1.1   The Quality Assurance Organization (QA0) initiated, in April 1983, a monthly "QA Concerns" Program report, in addition to the existing l                 . Quarterly   Management   Report, which   identifies   quality problems requiring management visibility. The monthly report supplements the i
. Quarterly Management
: Report, which identifies quality problems requiring management visibility.
The monthly report supplements the i
quarterly Report to Senior Management, and identifies problems, as deemed by the QAO, which require special management attention such as
quarterly Report to Senior Management, and identifies problems, as deemed by the QAO, which require special management attention such as
(                  recent or potential Stop Work Orders and recurring problems shown to i
be adverse to safety. The Quarterly Management Report will include an attachment, listing overdue Corrective Action Requests and open
(
(
Nonconformance Reports issued to SCE organizations.       The report will i
recent or potential Stop Work Orders and recurring problems shown to i
also include graphical trend analyses and detailed assessments of known or suspected causes of CAR deficiencies.       The report will be addressed to the responsible Vice Presidents.,
be adverse to safety.
5.1. 7. Periodic QA meetings will be scheduled to address items identified in the   Monthly,     Quarterly   and   corresponding   followup   reports.
The Quarterly Management Report will include an attachment, listing overdue Corrective Action Requests and open
(
Nonconformance Reports issued to SCE organizations.
The report will i
also include graphical trend analyses and detailed assessments of known or suspected causes of CAR deficiencies.
The report will be addressed to the responsible Vice Presidents.,
5.1. 7.
Periodic QA meetings will be scheduled to address items identified in the
: Monthly, Quarterly and corresponding followup reports.
Attendance will be solicited from:
Attendance will be solicited from:
I Manager of Nuclear Operations Manager, Station Manager, Project Unit 1 Manager, Project Units 2 and 3 The highlights of previous reports and progress toward solutions will be discussed at these meetings.       Status escalation to the Vice Presidential level will occur as necessary to assure that appropriate actions have the proper visibility for adequate completion.
I Manager of Nuclear Operations Manager, Station Manager, Project Unit 1 Manager, Project Units 2 and 3 The highlights of previous reports and progress toward solutions will be discussed at these meetings.
5.1.3   A revised QA CAR Procedure N16.03 Revision 11 has been issued to strengthen the program. The improved program implements the February 1983 recommendations of the NUS Audit on QA effectiveness           by providing a "close loop provision" in the CAR resolution process.
Status escalation to the Vice Presidential level will occur as necessary to assure that appropriate actions have the proper visibility for adequate completion.
The " closed loop" aspect begins with routine monthly meetings, effective July 1,1983, with the Supervisor to Supervisor, Manager to Manager or escalated to the Vice President to Vice President level         .
5.1.3 A revised QA CAR Procedure N16.03 Revision 11 has been issued to strengthen the program.
  .            after 90 days delinquency to candidly ascertain the cause and provide
The improved program implements the February 1983 recommendations of the NUS Audit on QA effectiveness by providing a "close loop provision" in the CAR resolution process.
:an     immediate   "get-well-plan"   on   late CAR., responses   and/or corresponding implementation actions.
The " closed loop" aspect begins with routine monthly meetings, effective July 1,1983, with the Supervisor to Supervisor, Manager to Manager or escalated to the Vice President to Vice President level after 90 days delinquency to candidly ascertain the cause and provide
5.1.4   At the request and with the cooperation of Sation Management, a program to prioritize CAR significance with respect to " potential nuclear safety ha za rds_" will be developed.     QA0 will assess CAR deficiencies which potentially have safety significance by so noting     _
:an immediate "get-well-plan" on late CAR.,
the assessment in the CAR transmittal correspondence. This will flag to the Station that special attention appears warranted.
responses and/or corresponding implementation actions.
  %)
5.1.4 At the request and with the cooperation of Sation Management, a program to prioritize CAR significance with respect to " potential nuclear safety ha za rds_" will be developed.
t
QA0 will assess CAR deficiencies which potentially have safety significance by so noting the assessment in the CAR transmittal correspondence.
This will flag to the Station that special attention appears warranted.
%) t


5.1.5 Additionally, the CAR program will be modi fied to require, on a q                                                                                                                       .
5.1.5 Additionally, the CAR program will be modi fied to require, on a q
prioriti zed     basis, timely notification of the                         appropriate         Vice President for CAR's representing potential nuclear safety hazards and needed     corrective actions.         Delays         in       responses           to CAR's   and Nonconformance Reports           (NCR's)   will           also   be   included         in this noti fication.
prioriti zed
6.0   PROJECT ENGINEERING MAC Recommendation 6.1   One SCE organization should have primary and overall responsit,ility for design changes throughout the anticipated long-term retrofit
: basis, timely notification of the appropriate Vice President for CAR's representing potential nuclear safety hazards and needed corrective actions.
  ,G       work. Assign responsibility for the adequacy of plant design to q)
Delays in responses to CAR's and Nonconformance Reports (NCR's) will also be included in this noti fication.
6.0 PROJECT ENGINEERING MAC Recommendation 6.1 One SCE organization should have primary and overall responsit,ility for design changes throughout the anticipated long-term retrofit
,G work.
Assign responsibility for the adequacy of plant design to q)
Project Engineering and communicate this to appropriate organizations.
Project Engineering and communicate this to appropriate organizations.
Action Plan 6.1.1 Prepare a list of design change categories to be expected during future plant operation,           e.g.,   component changes at one end of the
Action Plan 6.1.1 Prepare a list of design change categories to be expected during future plant operation, e.g.,
!          spectrum and whole system changes at the other.
component changes at one end of the spectrum and whole system changes at the other.
6.1.2 Prepare criteria for each design change category and recommend to NE&O and E&G Management which should be assigned to Engineering &
6.1.2 Prepare criteria for each design change category and recommend to NE&O and E&G Management which should be assigned to Engineering &
Construction and which will be assigned to Station Technical.
Construction and which will be assigned to Station Technical.,


6.1.3         Project and Station Technical will jointly develop design change procedures consistent with the approach approved - in 6.1.2 above.
6.1.3 Project and Station Technical will jointly develop design change procedures consistent with the approach approved - in 6.1.2 above.
These procedures will address the extent of review and level of approval by the respective organizations.
These procedures will address the extent of review and level of approval by the respective organizations.
6.1.4         Integrate the results of these action items into the policy statement of Item 6.5.1.
6.1.4 Integrate the results of these action items into the policy statement of Item 6.5.1.
MAC Recommendation 6.2           Assign assistant project engineers within Project Engineering and define their functions and responsibilities in conjunction with those
MAC Recommendation 6.2 Assign assistant project engineers within Project Engineering and define their functions and responsibilities in conjunction with those of Station Technical to ensure compatibility of functions and establish appropriate interfaces.
.                    of Station Technical       to ensure compatibility of                         functions and establish appropriate interfaces.
Action Plan 6.2.1 Review and update the listing of Project Engineering functions, responsibilities, authority and interfaces.
Action Plan 6.2.1         Review and update the listing of Project Engineering functions, responsibilities, authority and interfaces.
6.2.2 Based on 6.2.1, develop an organization plan to handle functions, responsibilities, authority, and interfaces.
6.2.2         Based on 6.2.1,   develop an organization plan to handle functions, responsibilities, authority, and interfaces.
O._ ___ _
O


6.2.3     . Review the organizational plan with interfacing organizations and A
6.2.3
U obtain concurrence to insure compatibility and agreement.
. Review the organizational plan with interfacing organizations and AU obtain concurrence to insure compatibility and agreement.
6.2.4       Prepare           jurisdiction               and   responsibility                         statements   for           Project 4                  Engineers and Discipline Group Leaders which clearly define each position, scope of responsibility and interfaces.
6.2.4 Prepare jurisdiction and responsibility statements for Project Engineers and Discipline Group Leaders which clearly define each 4
i 6.2.5       Based on 6.2.4, review and update performance expectations for each Project Engineer.
position, scope of responsibility and interfaces.
i 6.2.5 Based on 6.2.4, review and update performance expectations for each Project Engineer.
MAC Recommendation O
MAC Recommendation O
6.3         Assess the work load, duty assignments and staffing for the onsite Project Engineering function to datermine how best to improve its ability to meet performance expectations.
6.3 Assess the work load, duty assignments and staffing for the onsite Project Engineering function to datermine how best to improve its ability to meet performance expectations.
Action Plan 6.3.1       Review         and                   update   functions,   responsibilities,                         authority,               and l                 interfaces of the onsite Project Engineering Site Representative and discipline personnel under his direction.
Action Plan 6.3.1 Review and update functions, responsibilities, authority, and l
l 1
interfaces of the onsite Project Engineering Site Representative and discipline personnel under his direction.
O
l O 1,
            . - -    .,      ._- _ _ . _ _ . _ _ - _ - _ , ._.                  _ - _ . _ . . ~ . . _ , _ - . . _            - _ _ _ - . _ _ . .      . .  - _ _
_ - _. _.. ~.. _, _ -.. _


d e
d e
6.3.2               Prepare a listing of types of quantity of work items handled onsite.
6.3.2 Prepare a listing of types of quantity of work items handled onsite.
O 6.3.3               Based on 6.3.1 and 6.3.2, develop criteria to establish division of responsibility between                                     onsite                       and         home       office                 E&C                   engineering personnel.        _..
O 6.3.3 Based on 6.3.1 and 6.3.2, develop criteria to establish division of responsibility between onsite and home office E&C engineering personnel.
6.3.4               Develop a         set         of             generic                         performance                   expectations                                 for         onsite personnel based on project and station needs.
6.3.4 Develop a set of generic performance expectations for onsite personnel based on project and station needs.
6.3.5               Based   on       the         work                   load                   for           a       given         period                 and                 performance expectations (6.3.4), develop criteria to determine the number of personnel required onsite.
6.3.5 Based on the work load for a
. O     ,
given period and performance expectations (6.3.4), develop criteria to determine the number of personnel required onsite.
MAC Recommendation 9
O MAC Recommendation 9
6.4                 Clarify the rol es of Project Engineering and Station Technical functions       by       establishing                                       responsibilities                       of                 each,                         defining compatible goals and objetives and by working to a common set of priorities.
6.4 Clarify the rol es of Project Engineering and Station Technical functions by establishing responsibilities of
    -e . . -, . ,      ,,,,..----,s.   -
: each, defining compatible goals and objetives and by working to a common set of priorities.
                                                  -,,r-     ,r,-  . , - , , , , - . , - - - - , - - - . , - - - , , - , , , -
-e
                                                                                                                                  -,~,-,----.,,w-,--     - - - , - - - , ~ , . - - - - - , . - - - - , , + -      -
,,,,..----,s.
                                                                                                                                                                                                                        -re,--rg.-
-,,r-
,r,-
-,~,-,----.,,w-,--
- - -, - - -, ~,. - - - - -,. - - - -,, + -
-re,--rg.-


4 Action Plan 0                                                                                                                       -
Action Plan 4
6.4.1 Identi fy   existing             responsibilities,                 goals     and   objectives,       and priorities of Station Technical (i .e. , Chemistry, I&C, STA's, etc.)
0 6.4.1 Identi fy existing responsibilities, goals and objectives, and priorities of Station Technical (i.e., Chemistry, I&C, STA's, etc.)
and propose revised jurisdiction statements, goals, oojectives and priorities, if appropriate.
and propose revised jurisdiction statements, goals, oojectives and priorities, if appropriate.
6.4.2 Prepare a matrix of functions,                             responsibilities, authority, and interfaces for E&C and NEa0 Engineering Organizations.
6.4.2 Prepare a matrix of functions, responsibilities, authority, and interfaces for E&C and NEa0 Engineering Organizations.
6.4.3 Compare the matrix with regulatory requirements and SCE Company policies,     and           establish         roles   for each           organization           for each
6.4.3 Compare the matrix with regulatory requirements and SCE Company
, p) u function,     responsibility, authority, and interface identified in 6.4.2.
: policies, and establish roles for each organization for each p)
6.4.4 Establish     a joint             agreement           between       E&C and NE&O within               the constraints of the requirements developed in                                     6.4.3 to eliminate redundancy or overlap in functions, responsibilities, authority and interfaces.
: function, responsibility, authority, and interface identified in u
6.4.2.
6.4.4 Establish a joint agreement between E&C and NE&O within the constraints of the requirements developed in 6.4.3 to eliminate redundancy or overlap in functions, responsibilities, authority and interfaces.
6.4.5 Develop and implement a priority system which addresses station and project objectives within the constraints of personnel and fiscal resources necessary to di scharge the division of responsibility established in 6.4.4
6.4.5 Develop and implement a priority system which addresses station and project objectives within the constraints of personnel and fiscal resources necessary to di scharge the division of responsibility established in 6.4.4


6.4.6       Prepare and implement a joint Management Policy statement which O             defines   functions,   responsibilities   and authority for   the   ESC engineering   and   Station   Technical   organizations. The   Policy Statement shall prescribe remedies for disputes.
6.4.6 Prepare and implement a joint Management Policy statement which O
MAC Recommendation 6.5         Establish   long-term   roles   for Project Engineering and   Station Technical which are consistent with policies for role of Station and Project support functions.
defines functions, responsibilities and authority for the ESC engineering and Station Technical organizations.
Action Plan 6.5.1       Prepare and implement a joint E&C and NE&O Management               Policy Statement which defines the roles and responsibilities of Project Engineering and Station Technical based on input from Items 6.1.4 and 6.4.6.
The Policy Statement shall prescribe remedies for disputes.
6.5.2       Implement changes identified in 6.4.1 above, as approved.
MAC Recommendation 6.5 Establish long-term roles for Project Engineering and Station Technical which are consistent with policies for role of Station and Project support functions.
O
Action Plan 6.5.1 Prepare and implement a joint E&C and NE&O Management Policy Statement which defines the roles and responsibilities of Project Engineering and Station Technical based on input from Items 6.1.4 and 6.4.6.
    ,      7.0         CONFIGURATION MANAGEMENT U                                                                                                                                                                                               ~
6.5.2 Implement changes identified in 6.4.1 above, as approved.
MAC Recommendation 7.1         Complete efforts underway to update the Master Equipment List (MEL).
O 7.0 CONFIGURATION MANAGEMENT
,U
~
MAC Recommendation 7.1 Complete efforts underway to update the Master Equipment List (MEL).
This work should be given a high priority.
This work should be given a high priority.
Action Plan 7.1.1       Implement program to provide a complete and up-to-date MEL.
Action Plan 7.1.1 Implement program to provide a complete and up-to-date MEL.
t MAC Recommendation O
t MAC Recommendation O
v 7.2         Assign high priority to completing tne review of the temporary modifications and to performing the necessary engineering and safety                                                                                                       -
v 7.2 Assign high priority to completing tne review of the temporary modifications and to performing the necessary engineering and safety evaluations of those changes considered permanent.
evaluations of those changes considered permanent.                                                                                 Establish an administrative control                                             process                       for temporary modi fications                       that clearly define conditions for their utilization.
Establish an administrative control process for temporary modi fications that clearly define conditions for their utilization.
Action P1an                                                                                                                                                               .
Action P1an 7.2.1 Complete the revi ew of outstanding temporary modi fications and develop a schedule for implementation of permanent changes.
7.2.1       Complete             the       revi ew of outstanding                                                 temporary modi fications                         and develop a schedule for implementation of permanent changes.
-w,,--,,,.~,.-.-..
  -  - . -    .. - , ,    . , . - .    - -    . . . . , , , . . . , , , . - _ , . - - - . - , , , , . , , _ , . . . .                -w,,--,,,.~,.-.-..       . , . - - - . - - - . - , , . ,


7.2.2 Complete updating the       temporary modification       program, including incorporation of   INPO criteria.           Resolve ISEG comments on     the program.
7.2.2 Complete updating the temporary modification
7.2.3 Resolve all temporary modifications which involve compliance with
: program, including incorporation of INPO criteria.
,          regulatory requirements.       _        __
Resolve ISEG comments on the program.
7.2.3 Resolve all temporary modifications which involve compliance with regulatory requirements.
?
?
)
)
h MAC Recommendations a
h MAC Recommendations a
:    7.3   Review Station and Project design change control procedures to assure compatability. These procesures should clearly define the functions and responsibilities of each.         The effort should build upon the work recently completed by the Configuration Task Group for Unit 1.
7.3 Review Station and Project design change control procedures to assure compatability.
O       Action Plan 1
These procesures should clearly define the functions and responsibilities of each.
7.3.1 Perform and document the results of the recommended review, including any clarification of functions and responsibilities which may be indicated. Provide discussion of the relationship to referenced work P
The effort should build upon the work recently completed by the Configuration Task Group for Unit 1.
O Action Plan 1
7.3.1 Perform and document the results of the recommended review, including any clarification of functions and responsibilities which may be indicated.
Provide discussion of the relationship to referenced work P
S at S01.
S at S01.
                                                        ~
~
j   7.3.2 Upon revision of Station design change control procedures, review and revise E&C QA Procedures and Test Instructions as necessary to assure compatibility.
j 7.3.2 Upon revision of Station design change control procedures, review and revise E&C QA Procedures and Test Instructions as necessary to assure compatibility.
O MAC Recommendation-O 7.4 Immediate training and clarification on the use of existing procedures should be provided to those Station and Project staff personnel who are involved with design activities.
I Action Plan 7.4.1 Provide a status of training on use of existing procedures for Station personnel for management review.
Implement additional training if required for purposes of clarification.
~
7.4.2 Project staff personnel involved with design change activities have received training on the use of applicable procedures.
E&C QA Procedure E&C 41-1-2, " Quality Assurance Training for NE&O and E&C Personnel" will be implemented for future training as required.
MAC Recommendation 7.5 Consider establishing a
change management function to
: review, prioritize and approve all requests for changes in plant configuration.
O
O
      .      MAC Recommendation-O 7.4    Immediate  training    and  clarification    on    the    use  of    existing procedures should be provided to those Station and Project staff personnel who are involved with design activities.
\\  
I Action Plan 7.4.1 Provide a status of training on use of existing procedures for Station    personnel  for management    review.      Implement    additional
~
                                                                                ~
training if required for purposes of clarification.
7.4.2 Project staff personnel involved with design change activities have received training on the use of applicable procedures.                  E&C QA Procedure E&C 41-1-2, " Quality Assurance Training for NE&O and E&C Personnel" will be implemented for future training as required.
MAC Recommendation 7.5  Consider    establishing    a change  management      function    to    review, prioritize    and    approve  all  requests    for    changes    in    plant l
configuration.
    \
O
                                                        ~
1 l
l i
l i
Action Plan The effort to develop a system to manage plant modifications was initiated .. December 1982.                         The following action plan identifies the i
Action Plan The effort to develop a system to manage plant modifications was initiated.. December 1982.
The following action plan identifies the i
major milestones and the target dates for remaining activities.
major milestones and the target dates for remaining activities.
7.5.1           Identify work categories and priority level s.                                                                                     . ._
7.5.1 Identify work categories and priority level s.
J 7.5.2         Prepare a             change management                           policy statement                     and                   implementing procedures.
J 7.5.2 Prepare a change management policy statement and implementing procedures.
7.5.3         Secure NE&O Management approval and issue policy and procedures.
7.5.3 Secure NE&O Management approval and issue policy and procedures.
1 O
O 1
MAC Recommendation 7.6           Develop an integrated configuration status reporting system which serves the needs of both Project and Station for tracking the status of plant change requests and plant modi fication packages (SPR's, PFC's, DCP's temporary modifications).
MAC Recommendation 7.6 Develop an integrated configuration status reporting system which serves the needs of both Project and Station for tracking the status of plant change requests and plant modi fication packages (SPR's, PFC's, DCP's temporary modifications).
t O
O t
0
0,


I Action Plan O                                                                                                           _
Action Plan O
7.6.1     Identify and evaluate the existing process and reporting tools for                             I plant   modi fication s/ change s ,   i.e.,         SPR's,   DCP's, Temporary                 l Modifications.
7.6.1 Identify and evaluate the existing process and reporting tools for plant modi fication s/ change s,
                                                                                                                    )
i.e.,
7.6.2     Determine the visibility and status requirements of key Project and Station personnel.
SPR's, DCP's, Temporary Modifications.
7.6.3     Prepare a detailed implementation schedule defining dates for process devel opment, report generation and tracking document integration.
)
(               MAC Recommendation 7.7 Resolve the problems associated with corporate document management providing timely copies of requested documents.
7.6.2 Determine the visibility and status requirements of key Project and Station personnel.
Action Plan 7.7.1 Evaluate enhancements of CDM support that can be made in the interest of timeliness and submit recommendacions.                 Implement recommendations, as approved.
7.6.3 Prepare a detailed implementation schedule defining dates for process devel opment, report generation and tracking document integration.
l l
(
'O                                                                                                                   I
MAC Recommendation 7.7 Resolve the problems associated with corporate document management providing timely copies of requested documents.
_40_                                                               l
Action Plan 7.7.1 Evaluate enhancements of CDM support that can be made in the interest of timeliness and submit recommendacions.
Implement recommendations, as approved.
l
'O
_40_


8,0   TRAINING R                                                                             -
8,0 TRAINING R
V MAC Recommendation 8.1   Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.
V MAC Recommendation 8.1 Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.
Action Plan 8.1.1 Describe the existing network for interface between the Station and training and assess its effectiveness.     Arrange for a meeting .to discuss this, and schedule regular interface meetings with planned agenda.
Action Plan 8.1.1 Describe the existing network for interface between the Station and training and assess its effectiveness.
O       MAC Recommendation 8.2   Improve training program effectiveness in the areas of supervisory training and management development.
Arrange for a meeting.to discuss this, and schedule regular interface meetings with planned agenda.
O MAC Recommendation 8.2 Improve training program effectiveness in the areas of supervisory training and management development.
Action Plan 8.2.1 Issue a memo identifying current SCE programs available in 'the areas of supervisory training and management development.
Action Plan 8.2.1 Issue a memo identifying current SCE programs available in 'the areas of supervisory training and management development.
8.2.2 Include in personnel development planning extensive use of available programs.
8.2.2 Include in personnel development planning extensive use of available programs.
O 9.0 ORGANIZATION STRUCTURE, POLICIES AND PROCEDURES MAC Recommendation 9.1 Perform a complete review of functions and clarify responsibilities and accountabilities, eliminating gaps and overlap.                                                                           This should be done with the objective of streamlining the organization.                                                                                         Specific emphasis should be placed on the Station organization and its interfaces with other organizations related to SONGS, such as Nuclear Engineering, Safety and Licensing, Project and Quality Assurance.
O 9.0 ORGANIZATION STRUCTURE, POLICIES AND PROCEDURES MAC Recommendation 9.1 Perform a complete review of functions and clarify responsibilities and accountabilities, eliminating gaps and overlap.
Action Plan 9.1.1 Review jurisdiction statements for functions reporting to managers and revise as appropriate.                                 Accomplish inter.-organization review of these jurisdiction             statements to insure gaps and overlaps                                                                               are minimized within NE&0.
This should be done with the objective of streamlining the organization.
9.1.2 Subject               the jurisdiction                               statements produced                                   in                 9.1.1   to interdepartment           review and                           revise as       necessa ry.
Specific emphasis should be placed on the Station organization and its interfaces with other organizations related to SONGS, such as Nuclear Engineering, Safety and Licensing, Project and Quality Assurance.
Action Plan 9.1.1 Review jurisdiction statements for functions reporting to managers and revise as appropriate.
Accomplish inter.-organization review of these jurisdiction statements to insure gaps and overlaps are minimized within NE&0.
9.1.2 Subject the jurisdiction statements produced in 9.1.1 to interdepartment review and revise as necessa ry.
i i
i i
I l.
I l.
l
l
    \-
\\-
l                                                                               42-l l _    _
l 42-l l _


MAC Recor:nendation 9.2     Develop top level administrative control procedures which include programmatic     commitments,   management     policies   and organizational responsibilities and interfaces.
MAC Recor:nendation 9.2 Develop top level administrative control procedures which include programmatic commitments, management policies and organizational responsibilities and interfaces.
I i
I i
Action Plan 9.2.1   Prepare an NE&O Policy Statement for management approval which sets forth the hierarchical         relationship of all         such procedures and provides clarification regarding organizational interfaces.
Action Plan 9.2.1 Prepare an NE&O Policy Statement for management approval which sets forth the hierarchical relationship of all such procedures and provides clarification regarding organizational interfaces.
Q         MAC Recommendation 9.3     Establish a clear plan and hierarchy for administrative control procedures. Top   level   administrative control         procedures should establish   requirements     for     procedures   and   instructions   by the implementing organizations.         The plan should address interfacing of
Q MAC Recommendation 9.3 Establish a clear plan and hierarchy for administrative control procedures.
Top level administrative control procedures should establish requirements for procedures and instructions by the implementing organizations.
The plan should address interfacing of
(
(
procedures among implementing organizations.
procedures among implementing organizations.
Action Plan 9.3.1 . Refer to action given in Section 9.2.1.
Action Plan 9.3.1
9.3.2 Prepare detailed plan for the development of the station programmatic procedures concept and obtain management approval.
. Refer to action given in Section 9.2.1.
s t                                            43-
9.3.2 Prepare detailed plan for the development of the station programmatic procedures concept and obtain management approval.
s 43-t


9.3.3 Implement the programmatic procedures concept.
9.3.3 Implement the programmatic procedures concept.
U                                                                                    ~
mU
MAC Recommendation 9.4   Establish a control process that tracks regulatory requirements and commitments from their source to the implementing procedures.
~
Action Plan 9.4.1 Evaluate the extent to which the Configuration Control Program will meet this recommendation. Identify addicional measures that would be required, if any.
MAC Recommendation 9.4 Establish a control process that tracks regulatory requirements and commitments from their source to the implementing procedures.
Action Plan 9.4.1 Evaluate the extent to which the Configuration Control Program will meet this recommendation.
Identify addicional measures that would be required, if any.
MAC Recommendation P
MAC Recommendation P
9.5   Much   use can be made of     the material   currently existing   in procedures. However, it is   strongly   recommended that existing procedures be reviewed for inconsistencies and gaps.
9.5 Much use can be made of the material currently existing in procedures.
: However, it is strongly recommended that existing procedures be reviewed for inconsistencies and gaps.
Action Plan
Action Plan
}   9.5.1 Describe current procedure review programs and policies.           Obtain input from each section for this, in order to provide a complete picture for management review.
}
9.5.1 Describe current procedure review programs and policies.
Obtain input from each section for this, in order to provide a complete picture for management review.
44-
44-


l 9.5.2     Based on the results of this review, implement additional actions, as necessary.
9.5.2 Based on the results of this review, implement additional actions, as necessary.
10.0     ORGANIZATIONAL COMMUNICATIONS MAC Recommendations 10.1     Evaluate the need for additional regularly scheduled meetings with key     managers     of the SONGS-related     organizations             to improve communication of general and specific issues, review of commitments, coordination of efforts and planning.       Address key interface areas, such as:
10.0 ORGANIZATIONAL COMMUNICATIONS MAC Recommendations 10.1 Evaluate the need for additional regularly scheduled meetings with key managers of the SONGS-related organizations to improve communication of general and specific issues, review of commitments, coordination of efforts and planning.
!            - Key managers of NE&O and QA
Address key interface areas, such as:
              - Station managers Action Plan i
- Key managers of NE&O and QA
10.1.1   Conduct regularly scheduled monthly meetings with key managers of NE&0.
- Station managers Action Plan i
10.1.2   As required, conduct special meetings with key managers of NE&O and other appropriate Departments to review plans for major activities such as refueling or retrofit outages.
10.1.1 Conduct regularly scheduled monthly meetings with key managers of NE&0.
10.1.2 As required, conduct special meetings with key managers of NE&O and other appropriate Departments to review plans for major activities such as refueling or retrofit outages.
O a
O a
45-
45-


10.1.3         Encourage regularly scheduled staff meetings within the organizations
10.1.3 Encourage regularly scheduled staff meetings within the organizations
                                                                                                                                      ~
~
within NEa0.
within NEa0.
MAC Recommendations 10.2           Senior and middle management should communicate clearly to thei r subordinates           the need       for   initiating     individual face-to-face communications.
MAC Recommendations 10.2 Senior and middle management should communicate clearly to thei r subordinates the need for initiating individual face-to-face communications.
Action Plan 10.2.1           Discourage writing of unnecessary letters and encourage face-to-face communications within the Department.
Action Plan 10.2.1 Discourage writing of unnecessary letters and encourage face-to-face communications within the Department.
O MAC Recommendations                                                       -
O MAC Recommendations 10.3 Emphasize team building to improve coordination and problem solving among key organizational units.
10.3           Emphasize team building to improve coordination and problem solving among key organizational units.
2 4
2 4
Action Plan a               10.3.1         Emphasize a team building approach in the meetings to be conducted in the action plan for recommendations 10.1.
Action Plan a
10.3.2         Encourage team building efforts such as the CSI meeting being conducted for the action plan for recommendations 2.1 witnin the V                         Department when appropriate.
10.3.1 Emphasize a team building approach in the meetings to be conducted in the action plan for recommendations 10.1.
10.3.2 Encourage team building efforts such as the CSI meeting being conducted for the action plan for recommendations 2.1 witnin the V
Department when appropriate.
46-
46-


  .c                                                 APPENDIX 1
.c APPENDIX 1
    \
\\
CATEGORIZATION OF MAJOR RECOMMENDATIONS WITH SPECIFIC RECOMMENDATIONS MAJOR RECOMMENDATION - Reaffirm that safety and compliance take precedence in any conflict with schedule objectives.
CATEGORIZATION OF MAJOR RECOMMENDATIONS WITH SPECIFIC RECOMMENDATIONS MAJOR RECOMMENDATION - Reaffirm that safety and compliance take precedence in any conflict with schedule objectives.
Specific recommendations 2.1       Management must continue to reinforce to SONGS personnel at all levels that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant.                   This reinforcement should occur in
Specific recommendations 2.1 Management must continue to reinforce to SONGS personnel at all levels that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant.
                                                                                              - ~
This reinforcement should occur in all formal and informal communications.
i all formal and informal communications.
- ~
i MAJOR RECOMMENDATIO4 - Clearly establish that the Station is the lead organization.
i i
              . Specific recommendations I
MAJOR RECOMMENDATIO4 - Clearly establish that the Station is the lead organization.
t 2.2       Management must take action to establish the Station as the lead
. Specific recommendations I
                          . SONGS organization and specifically identify that the Station is f                           responsible for resolving conflicts between safety and compliance l                           and the power ascension schedule.
2.2 Management must take action to establish the Station as the lead t
(
. SONGS organization and specifically identify that the Station is f
i I   . .- -      -        -            -    __.  - . - - . - - - - . . -          . -.    . . -    . . . . - - - - , _ .
responsible for resolving conflicts between safety and compliance l
and the power ascension schedule.
( _
i I


O
O 3.3.2 For the long term, this function should include outage planning'
    %/
%/
3.3.2 For the long term, this function should include outage planning'                                       .
and management responsibility.
and management responsibility.                   This will establish the Station in the lead outage role.                   Project work during operation and outages would be integrated into the overall Station plan and schedule.
This will establish the Station in the lead outage role.
Project work during operation and outages would be integrated into the overall Station plan and schedule.
f I
f I
7.5         Consider establishing a change management function to review, prioritize         and approve   all           requests   for         changes   in   plant configuration.
7.5 Consider establishing a change management function to review, prioritize and approve all requests for changes in plant configuration.
MAJOR RECOMMENDATION - Integrate qualified Project personnel into the Station Organization.
MAJOR RECOMMENDATION - Integrate qualified Project personnel into the Station Organization.
(O V'     ' Specific recommendations 3.1.1 Make maximum use of qualified Project personnel (also processes and systems) to -infuse plant knowledge and experience into the Station organization.
(O V'
' Specific recommendations 3.1.1 Make maximum use of qualified Project personnel (also processes and systems) to -infuse plant knowledge and experience into the Station organization.
3.1.2 Establish development plans for each manager and supervisor.
3.1.2 Establish development plans for each manager and supervisor.
Such plans should identi fy specific managerial                             strengths and weaknesses         and establish       priorities       and         target   dates       for improvement.
Such plans should identi fy specific managerial strengths and weaknesses and establish priorities and target dates for improvement.
4
4 -.


MAJOR RECOMMEN0ATION - Improve conditions in the control room area, focusing             .
MAJOR RECOMMEN0ATION - Improve conditions in the control room area, focusing especially upon congestion, di stractions,
especially     upon   congestion,     di stractions ,   communications   and   system operability status information.
communications and system operability status information.
Specific recommendations i
Specific recommendations i
3.2.1 Although much has already been done to relieve the shift crew from distractions,     more   should   be done. Make significant physical improvements in the shift supervisor's office to allow him to function     better.       It should be determined why       the operators do not make significant use of the plant computer.             A study should be conducted of control room area activities and appropriate improvements implemented.
3.2.1 Although much has already been done to relieve the shift crew from distractions, more should be done.
Make significant physical improvements in the shift supervisor's office to allow him to function better.
It should be determined why the operators do not make significant use of the plant computer.
A study should be conducted of control room area activities and appropriate improvements implemented.
O
O
    ^'
^'
3.2.2 Action should be taken to ensure that the snift supervisors get out into the plant regularly.       This could be in ' conjunction with training periods, but it should also come at times when they can interact with equipment operators and other people on their own shifts.
3.2.2 Action should be taken to ensure that the snift supervisors get out into the plant regularly.
3.2.3 The control room area study recommended above should include evaluation of development of a system operability status display process. Current system operability status should be readily available to the operators.       The evaluation should also consider communication   of   plant     and   system   status   to   interfacing organizations and people.
This could be in ' conjunction with training periods, but it should also come at times when they can interact with equipment operators and other people on their own shifts.
< t
3.2.3 The control room area study recommended above should include evaluation of development of a system operability status display process.
                                                                                            }>^~~~
Current system operability status should be readily available to the operators.
The evaluation should also consider communication of plant and system status to interfacing organizations and people.
t
}>^~~
q
q
                                                            .: ;              ~ . ,
~
                                                                                          ~
~
                                                                                                                                      ~
~
A, p       ip                          ,
~.,
3.2.4 The operators will benefi t< greatl'y from improv;ments in plant e
A, ip p
O scheduling the work coordination -as identified in the following Work Management section.           ,
3.2.4 The operators will benefi t< greatl'y from O
3.2.5 Make available to the operators a well-defined list of contacts, such as systems engineers for times when they need information or assistance.                                     ,
improv;ments in plant e
y.S *                                                      ,
scheduling the work coordination -as identified in the following Work Management section.
                                                            - o           e,             %.                          .. n ,                                                    ,
3.2.5 Make available to the operators a well-defined list of contacts, such as systems engineers for times when they need information or assistance.
3.2.6 The Technical Specifications should be reviewed for improvements                                                                         ,
y.S
                                                                                                                      .            w ..                           <
- o e,
.. n,
3.2.6 The Technical Specifications should be reviewed for improvements w..
and reduction in complexity.
and reduction in complexity.
                                                                                                                  '                  ~
~
                                                                                                                                                          . +
. +
                                                          ,                                                                                                        e
e
                                                                -M   g                             'g 3.2.7 Make a joint effort, working with the system, engineers , to v
-M g
improve   operations   procedure'sNand                               reduce- repeat' proced;iral                                                   '
'g 3.2.7 Make a joint effort, working with the system, engineers, to v
mistakes.                                   ,
improve operations procedure'sNand reduce-repeat' proced;iral mistakes.
7-                                 '
7-j s
j s
3.4.2 Complete the development bf the system engineer'ing functio l1;wisich)'
3.4.2 Complete the development bf the system engineer'ing functio l1;wisich)'                                                                                 \
\\
                                                                                                                                          .,        %N has   recently   been   initi.ated.                           DeGine             the       fudctions -9ad                                               'g
%N has recently been initi.ated.
: g.                     v                                 .                                               -
DeGine the fudctions -9ad
responsibilities. System engineers should be, full,y knowledgeable                                                                                             L z
'g g.
about the design and (Uncticfr Of
v responsibilities.
* their assigned systems and s                 .
System engineers should be, full,y knowledgeable L
components. These system engineers should be ' responsibl e for                                                                       '
z about the design and (Uncticfr Of
                                                                                                      . .+ .
* their assigned systems and s
maximizing the performance of their systems.                                           ,To d,o this, they need   a   sense   of commi tmeq t'.                                                                                             'bc                           ,,
components.
Systems,,.%          ' eggineer(+should x
These system engineers should be ' responsibl e for
7            responsible for providing technjr31 support to station l Operators, , #
+
                                                          ..                      ,                                                            v
maximizing the performance of their systems.
(            v other
,To d,o this, they need a
* maintenance   and               personnel.s .;Speci fic                                   re p nsibilities                                   '
sense of commi tmeq t'.
                                                    .,          ,.                  .                                                                                  e should include:                         c,
'bc Systems ' eggineer(+should x
                                                                  ~
responsible for providing technjr31 support to station l Operators,, #
                                                                                                                                                                        \
(
                                                      %                                                          or                                              u
7 v
                                          .4.                                                     ,
v maintenance and other personnel.s.;Speci fic re p nsibilities should include:
~
e c,
\\
o r
u
.4.
3 N
3 N
                                                                                          ,                              ,,                                    N.
N.
                                                                                                                    ,s       .c
,s
_.N.                       '
.c
* L_                                                               J                     -                                -                            ._Mp
_.N.
L_
J
._Mp


o ISI testing.
. (q o ISI testing.
          . (q s
s o Knowing, reviewing and improving the operating procedures and technical specifications.
o Knowing, reviewing and improving the operating procedures and technical specifications.
o Being a point of contact on any problem or question related to questions, test, maintenance and modification.
o Being a point of contact on any problem or question related to questions, test, maintenance and modification.
o Knowing the system operability status, o Knowing about all problems and proposed resolutions.
o Knowing the system operability status, o Knowing about all problems and proposed resolutions.
                                                            ~o Initiating plant betterment proposals.                                     l o Reviewing design changes for maintainability and operability.
l
3.4.4 Provide qualified shift engineers for all                     shifts to provide
~o Initiating plant betterment proposals.
;\                                                                 .
o Reviewing design changes for maintainability and operability.
p                                                     % better support.
3.4.4 Provide qualified shift engineers for all shifts to provide
O,                     .
,;\\
7.2           Assia riigh priority to compietiag the review of tne tempocery
p
.;j-
% better support.
                        <                                  modi fica,tions and to performing the necessary engineering and
Assia riigh priority to compietiag the O,
                                                          ,sdfety     evaluations       of   those changes   considered   permanent.
7.2 review of tne tempocery
;                                                  -e Establish       an   administrative     . trol   process   for   temporary
.;j modi fica,tions and to performing the necessary engineering and
                                                        ., n '
,sdfety evaluations of those changes considered permanent.
;                                                          inodifications         that   cl early define   condi tions   for   their
-e Establish an administrative
                                                    .., s     e,
. trol process for temporary
                                                , "''ut i l i za ti o n.
., n '
                              , Is.h
inodifications that cl early define condi tions for their
* l                                     .
.., s e,
T-           s l
, "''ut i l i za ti o n.
MAJOR RECOMMENDATIOil                       , Complete development in specific areas of the Station b                 '      3 1                         ! Technical support function.
, Is.h l
L                         k l
T-s l
                            ;              c                                     -
MAJOR RECOMMENDATIOil
T                                                   g=-
, Complete development in specific areas of the Station b
              .~                 *
3 1
        , ~
! Technical support function.
L k
l c
T g=-
.~
, ~
I L
I L
w y/ Jh                             ,
w
              .        ..Y h\/ h !
..y/ Jh,
.. Y h\\/ h !


                                                                                        ""                                          "-                ^              ^ - - -                  -          -- --
;z
                            ;z                     ^ ,7 \[ , ^                                       < g 7 ^ --' '
^,7 \\[, ^
l     ,              6                 ,, (                     .
< g 7 ^ --' '
:'                                        ,i               .t
^
                                        .          . , -                                                            ,  f.
^ - - -
1; l,/                                                         . I,
l 6
                                                                                                                ., {, . ,;
,, (
7 i                   i f' Specific recommendations i                                                                                                       ! ,i         r?
,i
                                                                                                  .        r 3.4.1 Define goals and objectives for Station Technical.
.t f.
i I              w I+              ;
1; l,/
f 3.4.2 Complete the development of the system engineering function which
. I,. {,.,;
                      ,/                         '4 ,g'has                             recently been initiated.                       Define the functions                                         and e       )
7 i
                    ,                      i p/                 re'sponsibilities. System engineers should be fully knowledgeable is                       about the design and function oftheir assigned systems and l
f' i
T                                                 components.                   These system engineers should be responsible for V
Specific recommendations i
n,,                  maximizing the performance of their systems.                                                     To do this, they J '_
!,i r?
                                          ~4
r 3.4.1 Define goals and objectives for Station Technical.
                                                          /
i II+
i-       need a                   sense     of       commitment.           Systems               engineers       should                   be
w;f 3.4.2 Complete the development of the system engineering function which
                  <                                +                                                                                                             ,
,/
responsible for providing technical support to station operators,                             s 1
'4
1
,g'has recently been initiated.
.                                                                > maintenance                   and     other ' personnel. ' l Speci f fe. respcnsibilities O
Define the functions and e
                                /'                               saould iaci"de:
)
                      ,                                          o ISI testing.
i
t o Knowing, reviewing and improving the operating procedures and
/
                                                  /,
re'sponsibilities.
System engineers should be fully knowledgeable p
is about the design and function oftheir assigned systems and l
T components.
These system engineers should be responsible for V
maximizing the performance of their systems.
To do this, they J '_
n,,
~4
/
i-need a sense of commitment.
Systems engineers should be
+
responsible for providing technical support to station operators, s
> maintenance and other ' personnel. ' l Speci f fe. respcnsibilities 1
1 O
/'
saould iaci"de:
o ISI testing.
o Knowing, reviewing and improving the operating procedures and t
/,
technical specifications.
technical specifications.
r
o Being a point of contact on any problem or question related to r
                                                >-              o Being a point of contact on any problem or question related to y
y operations, test, maintena1ce and. modification.
operations, test, maintena1ce and. modification.
>a o Knowing the system operability status, o Knowing about all problems and proposed resolutions.
                                                                                                                                    >a
                    -                                            o Knowing the system operability status, o Knowing about all problems and proposed resolutions.
o Initiating plant' betterment proposals.
o Initiating plant' betterment proposals.
o Reviewing design chan'ges for maintainability and operability.
o Reviewing design chan'ges for maintainability and operability.
O
O.-. _


      .      .. .                    -                      _.                  . _ - -            - _    . _        _ _  _ - ~         _.                - .-        -- -
_ - ~
J 3.4.3 Supplement training on plant systems and administrative controls                                                                       ,
J 3.4.3 Supplement training on plant systems and administrative controls for the system engineers, shift engineers and STA's.
i for the system engineers, shift engineers and STA's.
i 3.4.4 Provide qualified shift engineers for all shifts to provide better support.
3.4.4 Provide qualified shift engineers for all shifts to provide better support.
6.1 One SCE organization should have primary and overall j
6.1                 One               SCE                 organization         should have   primary         and             overall             j responsibility for design changes throughout the anticipated long-term retrofit work.                                   Assign responsibility for the adequacy of plant design to Project Engineering and communicate this to appropriate organizations.
responsibility for design changes throughout the anticipated long-term retrofit work.
J 6.2                 Assign assistant project engineers within Project Engineering and O                                                 deftae their foactioas ead resPoasidiiities ia coa;unctioa with those of Station Technical to ensure compatibility of functions and establish appropriate interfaces.
Assign responsibility for the adequacy of plant design to Project Engineering and communicate this to appropriate organizations.
6.3                 Assess the work load, duty assignments and staf fing for the onsite Project Engineering function to determine how best to i
J 6.2 Assign assistant project engineers within Project Engineering and O
improve its ability to meet performance expectations.
deftae their foactioas ead resPoasidiiities ia coa;unctioa with those of Station Technical to ensure compatibility of functions and establish appropriate interfaces.
1 i
6.3 Assess the work load, duty assignments and staf fing for the onsite Project Engineering function to determine how best to improve its ability to meet performance expectations.
i                                 6.4                 Clarify the roles of Project Engineering and Station Technical functions by establishing responsibilities of eacn, defining compatible goals and objectives and by working to a common set of priorities.
i 1
O t
i 6.4 Clarify the roles of Project Engineering and Station Technical i
functions by establishing responsibilities of eacn, defining compatible goals and objectives and by working to a common set of priorities.
O t '


  -,          6.5     Establish long-term roles for Project Engineering and Station (b
6.5 Establish long-term roles for Project Engineering and Station
Technical which are consistent with policies for role of Station and Project support functions.
-,(b Technical which are consistent with policies for role of Station and Project support functions.
MAJOR RECOMMENDATION    - Establish a Station work management function to coordinate all work activities.
Establish a Station work management function to MAJOR RECOMMENDATION coordinate all work activities.
Specific recommendations 3.2.4 The operators will benefit greatly from improvements in plant scheduling and work coordination as identified in the following Work Management section.
Specific recommendations 3.2.4 The operators will benefit greatly from improvements in plant scheduling and work coordination as identified in the following Work Management section.
  ]           3.3.1 Develop a work management function responsible for planning and design coordinating maintenance,     ISI, surveillance   testing, change modifications and outages.       This function should be a continuous, all-shift effort with a         strong, full-time work manager who reports directly to the Station manager.
]
3.3.2 For the long tarm, this function should include outage planning and management respoisibility.     This will establish the Station   ,
3.3.1 Develop a work management function responsible for planning and coordinating maintenance,
in the lead outage role.       Project work during operation and l
: ISI, surveillance
: testing, design change modifications and outages.
This function should be a continuous, all-shift effort with a
: strong, full-time work manager who reports directly to the Station manager.
3.3.2 For the long tarm, this function should include outage planning and management respoisibility.
This will establish the Station in the lead outage role.
Project work during operation and l
outages would be integrated into the overall Station plan and schedule.
outages would be integrated into the overall Station plan and schedule.
  /~'N
/~'N i !
, i


i
i i
,                                                                                                                                                      i 3.3.3 Develop a management information system to support the work and outage planning function.                   Interim processes will have to be used until this system is developed.
3.3.3 Develop a management information system to support the work and outage planning function.
Interim processes will have to be used until this system is developed.
MAJOR RECOMMENDATION - Integrate Start-up Maintenance into Station Maintenance.
MAJOR RECOMMENDATION - Integrate Start-up Maintenance into Station Maintenance.
Specific recommendations i
Specific recommendations i
3.5.1 Integrate Start-up               Maintenance                   into Station Maintenance             to:
3.5.1 Integrate Start-up Maintenance into Station Maintenance to:
resolve         the   responsiblity                 and               accountability       issue; take advantage of resources, systems and organizational units of both organizations; and to improve maintenance planning and execution.
resolve the responsiblity and accountability issue; take advantage of resources, systems and organizational units of both organizations; and to improve maintenance planning and execution.
O             3 5 2 coa =' der iate9eatia9 4astr== eat ead coatroi                                         ('ac) =eiate"eace into -St'ation Maintenance to provide improved activity planning and coordination.
O 3 5 2 coa =' der iate9eatia9 4astr== eat ead coatroi
('ac) =eiate"eace into -St'ation Maintenance to provide improved activity planning and coordination.
3.5.3 Complete development of an integrated maintenance management information system as soon as possible.
3.5.3 Complete development of an integrated maintenance management information system as soon as possible.
.              MAJOR RECOMMENDATION - Improve the reporting of compliance issues by the safety review and quality assurance functions.                                     Also improve the tracking and timeliness of corective action taken in response to these issues.
MAJOR RECOMMENDATION - Improve the reporting of compliance issues by the safety review and quality assurance functions.
Also improve the tracking and timeliness of corective action taken in response to these issues.
4
4
)
)
O 4                                                                   _g.
O 4
_g.


Specific recommendations 4.1       Require the Onsite Review Committee (0SRC) to assume a more oversight in reviewing plant activities, schedulet and operations                                                                                       ,
Specific recommendations 4.1 Require the Onsite Review Committee (0SRC) to assume a more oversight in reviewing plant activities, schedulet and operations i
i for regulatory compliance and safety significance.
for regulatory compliance and safety significance.
  !                                4.2       Emphasize and strengthen requircments for Nuclear Safety Group
4.2 Emphasize and strengthen requircments for Nuclear Safety Group
                                            -(NSG) to provide management with an overall assessment of plant safety.
-(NSG) to provide management with an overall assessment of plant safety.
4.3       Establish           a         formal                     system       for   follow-up       and   closeout                   of recommendations submitted by the Independent Safety Engineering l                                           Group (ISEG) and NSG.
4.3 Establish a
l l     O 4.4       Improve communications and interaction between NSG and Station by
formal system for follow-up and closeout of recommendations submitted by the Independent Safety Engineering l
                                                                                                                                                                                                .+
Group (ISEG) and NSG.
l l O 4.4 Improve communications and interaction between NSG and Station by
. +
clarifying the roles and requiri~ng NSG to spend more time at the site.
clarifying the roles and requiri~ng NSG to spend more time at the site.
8 MAJOR RECOMtENDATION - Develop top level policies and administrative control f                   procedures which define and clari fy the functions, responsibilities and i
8 MAJOR RECOMtENDATION - Develop top level policies and administrative control f
j-                 accountabilities of SONGS-related organizations, i
procedures which define and clari fy the functions, responsibilities and i
j-accountabilities of SONGS-related organizations, i
(
(
Specific recommendations 7.1     Complete efforts underway to update the master equipment list.
Specific recommendations 7.1 Complete efforts underway to update the master equipment list.
This work should be given a high priority.
This work should be given a high priority.
j
, j l.
: l.     - - . . . . - . - . . . - .            . - .  . - , _ , . - , , - , . - . , , _ - _ . - . , _ _ _ . , - - -                                          _ , . , _ _ _ _ _ _ , , _ _ , , __    _


1 7.3     Review Station and Project design change control procedures to assure compatibility.                                   These procedures should clearly define the functions and responsibilities of each.                                                       The effort should build upon the work recently completed by the Configuration Task Group                                                                                                     f for Unit 1.                                                                                                                                                           i j                     7.4       Immediate training and clarification on the use of existing 4
1 7.3 Review Station and Project design change control procedures to assure compatibility.
',                            procedures should be provided to those Station and Project staff i
These procedures should clearly define the functions and responsibilities of each.
The effort should build upon the work recently completed by the Configuration Task Group f
for Unit 1.
i j
7.4 Immediate training and clarification on the use of existing 4
procedures should be provided to those Station and Project staff i
personnel who are involved with design change activities.
personnel who are involved with design change activities.
;                    7.5     Consider establishing a change management function to review, prioritize and                           approve                   all         requests         for           changes                     in   plant configuration.
7.5 Consider establishing a change management function to review, prioritize and approve all requests for changes in plant configuration.
O 7.6     Develop an integrated configuration status reporting system which serves the needs of both Project and Station for tracking the status of plant change requests and plant modification packages (SPR's, PFC's, DCP's temporary modifications).
: O 7.6 Develop an integrated configuration status reporting system which serves the needs of both Project and Station for tracking the status of plant change requests and plant modification packages (SPR's, PFC's, DCP's temporary modifications).
8.1     Establish regular meetings between Station and Nuclear Training 4
8.1 Establish regular meetings between Station and Nuclear Training 4
management to assess training needs and effectiveness.
management to assess training needs and effectiveness.
4 9.1     Perform                 a             complete                   review           of   functions                                 and         clari fy responsibilities                           and           accountabilities,                         eliminating                             gaps   and i                             overlap. This should be done with the objective of streamlining
4 9.1 Perform a
  ;O
complete review of functions and clari fy responsibilities and accountabilities, eliminating gaps and i
    ,y_ . _- _ ~.-, .     ,,..,,y     . . - . . _ , . , _ , , , _ . .      _ . _ _ . . , . - . , . ,. _ ,,.. _
overlap. This should be done with the objective of streamlining
                                                                                                                          ,y _     ,-,,.,_,,.._.~,,,_,.m____~.-m,                         _y.,_
;O
,y_
_ ~.-,.
,,..,,y
,y _
,-,,.,_,,.._.~,,,_,.m____~.-m,
_y.,_


Q the organization.               Specific emphasis should be placed on the Station organization and its interfaces with other organizations related to S0ftGS ,             such as Nuclear Er.gineering,                     Safety and Licensing, Project and Quality Assurance.
Q the organization.
9.2     Develop top level administrative control procedures which include programmatic commitments, management policies and organizational responsibilities and interfaces.
Specific emphasis should be placed on the Station organization and its interfaces with other organizations related to S0ftGS,
9.3     Establish a clear plan and hierarchy for administrative control procedures. Top level administrative control procedures should establish requirements for procedures and instructions by the implementing organizations.                       The plan should address interfccing of procedures ar..ong implement 1.:q organizations.
such as Nuclear Er.gineering, Safety and Licensing, Project and Quality Assurance.
t 9.4       Establish a control process that tracks regulatory requirements 4
9.2 Develop top level administrative control procedures which include programmatic commitments, management policies and organizational responsibilities and interfaces.
9.3 Establish a clear plan and hierarchy for administrative control procedures.
Top level administrative control procedures should establish requirements for procedures and instructions by the implementing organizations.
The plan should address interfccing of procedures ar..ong implement 1.:q organizations.
t 9.4 Establish a control process that tracks regulatory requirements 4
and commitments from their source to the implementing procedures.
and commitments from their source to the implementing procedures.
9.5       Much use can be made of the material currently existing in procedures. However, it is strongly recommended that existing procedures be reviewed for inconsistencies and gaps.
9.5 Much use can be made of the material currently existing in procedures.
O
However, it is strongly recommended that existing procedures be reviewed for inconsistencies and gaps.
O -


MAJOR RECOINEllDATI0il -                               Improve consnunications between and within                                                                       50flGS
MAJOR RECOINEllDATI0il -
:      O                        organizations.
Improve consnunications between and within 50flGS O
l l                                       Specific recommendations 3.3.3 Develop a management information system to support the work and                                                                                               ,
organizations.
j                                                          outage planning function.                                                 Interim processes will have to be used i                                                           until this system is developed.                                                                                                                             [
l l
Specific recommendations 3.3.3 Develop a management information system to support the work and j
outage planning function.
Interim processes will have to be used i
until this system is developed.
[
3.5.3 Complete development of an integrated maintenance management information system as soon as possible.
3.5.3 Complete development of an integrated maintenance management information system as soon as possible.
i 4.4     Improve communications and interaction between NSG and Station by O                                                 cier4ry4#9 the roies e#8 requicia9 aso to snead more time et tae
i 4.4 Improve communications and interaction between NSG and Station by O
                                                                                        ~
cier4ry4#9 the roies e#8 requicia9 aso to snead more time et tae l
site.
site.
l i
~
QA must monitor .and assure performance of the line organization 5.1 j                                                           by providing timely information to the Vice President, NE&0.                                                                                     The current reporting system should be reviewed to determine if i
i 5.1 QA must monitor.and assure performance of the line organization j
i                                                           adequate emphasis is being communicated to upper management of I
by providing timely information to the Vice President, NE&0.
l                                                           needed corrective actions and of untime.ly delay of response to I
The current reporting system should be reviewed to determine if i
l Non-Conformance Reports (NCR's) and Corrective Action Reports (CAR's).         Problems                             should               be reported in     a           manner                       which l
i adequate emphasis is being communicated to upper management of I
l                                                          highlights the 'nore important issues.
l needed corrective actions and of untime.ly delay of response to I
l Non-Conformance Reports (NCR's) and Corrective Action Reports l
(CAR's).
Problems should be reported in a
manner which l
highlights the 'nore important issues.
1 O
1 O
I
I......., _ -.. ~.... ~ _ _ _,.. _, -. _
                                                                                                                              . . . . . . . , _ - . . ~ . . . . ~ _ _ _ , . . _ , - . _       . _ . _ , _ , _ , . . _ _ . _ . . . , , _ . . _ _ _ _ . . . . . . .                ,m   . . _ , _ . _ , . . , . . , . , . - . . . . _ _ . , - . . - _
,m


d
d 7.7 Resolve the problems associated with corporate document I
;                                          7.7   Resolve                 the                 problems       associated                                           with     corporate     document                   .
management providing timely copies of requested documents.
I management providing timely copies of requested documents.
8.1 Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.
8.1   Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.
10.2 Senior and middle management should communicate clearly to their subordinates the need for initiating individual face-to-face communications.
10.2 Senior and middle management should communicate clearly to their subordinates the need for initiating individual                                                                                       face-to-face                     !
I j
communications.
10.3 Emphasize team building to improve coordination and problem solving among key organizational units.
I j                                           10.3 Emphasize team building to improve coordination and problem solving among key organizational units.
1 i
1                                                                                                                                                                                                                         .
~ ~
i
        ~ ~
JGH:8296 i
JGH:8296 i
4 i
4 i
h i
h i
O
O
            -                                                                                            -la-
-la-


d                 APPENDIX II 8
d APPENDIX II 8
G G
G G
RECOMMENDATIUNS FOR IMPROVEMENT OF THE OPERATION OF SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2 AND 3 8                       .-
RECOMMENDATIUNS FOR IMPROVEMENT OF THE OPERATION OF SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2 AND 3 8
Prepared For SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Rosemead, California 91770 1
Prepared For SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Rosemead, California 91770 1
H June 3,1983 Management Analysis Company Project Number: MAC-83-UO 26 Southern California Edison Comoany Contract Numbe. : $4200221 e
H June 3,1983 Management Analysis Company Project Number: MAC-83-UO 26 Southern California Edison Comoany Contract Numbe. : $4200221 e
u.
u.


Z L
ZL OVERVIEW s
OVERVIEW s
In March and April 1983, in response to a request from Southern California Edison Company (SCE), Management Analysis Company (MAC) performed a inanagement diag-nostic to assist SCE in identifying ways to improve operation of San Onofre Nuclear Generating Station (SONGS) Units 2 and 3. In performing the evaluation, MAC conducted over 90 interviews, reviewed many documents and made a number of on-site cbser-vations. This report identifies recommendations for improvement resulting from the evaluation.
In March and April 1983, in response to a request from Southern California Edison Company (SCE), Management Analysis Company (MAC) performed a inanagement diag-nostic to assist SCE in identifying ways to improve operation of San Onofre Nuclear Generating Station (SONGS) Units 2 and 3. In performing the evaluation, MAC conducted over 90 interviews, reviewed many documents and made a number of on-site cbser-vations. This report identifies recommendations for improvement resulting from the evaluation.
Unit 2's power ascension program has experienced a number of unscheduled delays.
Unit 2's power ascension program has experienced a number of unscheduled delays.
Further, issues concerning regulatory compliance developed and eventually resulted in a Nuclear Regulatory Commission (NRC) enforcement meeting on March 7,1983.
Further, issues concerning regulatory compliance developed and eventually resulted in a Nuclear Regulatory Commission (NRC) enforcement meeting on March 7,1983.
We identified a number of factors which contributed to that situation. One major factor
We identified a number of factors which contributed to that situation. One major factor
                                                        ~
~
Q   has been the late staffing of the Unit 2 and 3 Station organization resulting in a lac'< of
Q has been the late staffing of the Unit 2 and 3 Station organization resulting in a lac'< of
    ~'
~'
significant participation in the start-up program by Station personne!. Though this factor is mainly historical, it will require positive action by SCE management to reduce residual e f fects.
significant participation in the start-up program by Station personne!. Though this factor is mainly historical, it will require positive action by SCE management to reduce residual e f fects.
Fcrtunately, SCE has a committed and dedicated staff willing to invest the effort required to implement the positive actions required. A number of actions have been taken, including the full-time commitment of an executive vice president to address and remedy problems. In addition, the request for a full power operating license for Unit 3 has been deferred to allow primary focus on Unit 2 activities.
Fcrtunately, SCE has a committed and dedicated staff willing to invest the effort required to implement the positive actions required. A number of actions have been taken, including the full-time commitment of an executive vice president to address and remedy problems. In addition, the request for a full power operating license for Unit 3 has been deferred to allow primary focus on Unit 2 activities.
We identified eight principal problems during our evaluation. They are:
We identified eight principal problems during our evaluation. They are:
e A significant level of maintenance. and design change activities were going on at the same time as the power ascension testing. Prior to March 1983, the two units were being brougnt to power with a relatively short time separation between them. When 8            combined, these factors have had a negative impact on the power ascension program.
A significant level of maintenance. and design change activities were going on at the e
p V
same time as the power ascension testing. Prior to March 1983, the two units were 8
      .      Tne control room is a restraint to p! ant activity. In view of this and the above. :"e operators of the station we.e having difficulty in efficiently handling the demsncs being made upon them.
being brougnt to power with a relatively short time separation between them. When combined, these factors have had a negative impact on the power ascension program.
p Tne control room is a restraint to p! ant activity. In view of this and the above. :"e V
operators of the station we.e having difficulty in efficiently handling the demsncs being made upon them.
en=
en=
b,
b,
                                                        -i-
-i-


a e    The basic framework of the Station organization (the infrastructure) is relatively new, yet it must function like a well established organization.
a The basic framework of the Station organization (the infrastructure) is relatively e
g      e  A natural conflict has develcped between the Project's schedule orientation and the
new, yet it must function like a well established organization.
  .L3         Station's safety and compliance orientation during the transition to firm cperation.
A natural conflict has develcped between the Project's schedule orientation and the g
e    Identification, reporting and resolution of compliance issues need improvement.
e
e   The organizations which support SONGS activities are large and complex with unclear responsibilities and accountabilities.
.L3 Station's safety and compliance orientation during the transition to firm cperation.
e    Administrative control procedures are numerous, complex and inefficient.
Identification, reporting and resolution of compliance issues need improvement.
e   There are communications problems among and within SONGS organizations.
e The organizations which support SONGS activities are large and complex with e
In our report, we have made recommendations which deal with these problems in various ways. Our major recommendations are to:
unclear responsibilities and accountabilities.
e    Continue to reinforce that safety and compliance take precedence in any conflict with schedule objectives.
Administrative control procedures are numerous, complex and inefficient.
e    Clearly establish that the Station is the lead organization responsible for resolving conflicts between compliance and schedule.
e There are communications problems among and within SONGS organizations.
e    Integrate qualified Project perscnnel inio the Station organization.
e In our report, we have made recommendations which deal with these problems in various ways. Our major recommendations are to:
F e    Improve conditions in the control room area, focusing especially upon congestion, distractions, communications and system operability status information.
Continue to reinforce that safety and compliance take precedence in any conflict e
e   Complete development in soecific areas of the Station Technical support function.
with schedule objectives.
Establish a Station work management function to coordinate all work activities.
Clearly establish that the Station is the lead organization responsible for resolving e
e   Integrate Start-up Maintenance into Station Maintenance.
conflicts between compliance and schedule.
      . Improve the reporting of comoliance issues by the safety review and cuality assurance functions. Also improve the tracking and timeliness of corrective a:ticn taken in resocnse to these issues.
Integrate qualified Project perscnnel inio the Station organization.
e    Develop top level pclicies and administrattve contro! procedures which define and clarify the functions, responsibilities and acccuntabilities of SONGS-rela:ed organizations.
e F
e    Improve communications between and within SONGS organizations.
Improve conditions in the control room area, focusing especially upon congestion, e
Development and implementation of soecific action plans by SCE management addrening the MAC recommendations should result in improved performance in the coeration of g SONGS.
distractions, communications and system operability status information.
e Complete development in soecific areas of the Station Technical support function.
Establish a Station work management function to coordinate all work activities.
e Integrate Start-up Maintenance into Station Maintenance.
e Improve the reporting of comoliance issues by the safety review and cuality assurance functions. Also improve the tracking and timeliness of corrective a:ticn taken in resocnse to these issues.
Develop top level pclicies and administrattve contro! procedures which define and e
clarify the functions, responsibilities and acccuntabilities of SONGS-rela:ed organizations.
Improve communications between and within SONGS organizations.
e Development and implementation of soecific action plans by SCE management addrening the MAC recommendations should result in improved performance in the coeration of g
SONGS.
G A
G A


m-m.
m-m.
TABLE OF CONTENTS Section                                                                                                           Pace C'V E R V I E W . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   -i-1.0   I NT R O D UCT I O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .         I 2.0   ORGANIZATICN 08JECTIVES AND PRIORITIES . . . . . . . . . . . .                                               2 3.0   STATION     ..............................................                                                  2 5                3.1   Station Management               ................................                                      2 3.2   Operations       ........................................                                              3 3.3   Work Management               .................................                                        A 3.4   Station Technical           ..................................                                        5 3.5   Maintenance         ......................................                                            6 4.0   SAFETY REVIEW           .......................................                                              6 5.0   CUALITY ASSURANCE                 ..................................                                        7 6.0   PROJECT ENGINEEP,ING                   .............................. .                                      7 7.0   CONFIGURATION MANAGEMENT                                 ........................                            8 8.0   TRAINING     .............................................                                                  9 9.0   ORGANIZATION STRUCTURE, POLICIES AND PROCEDURES           ........................................                                              9 10.0   ORGANIZATIONAL COMMUNICATIONS . . . . . . . . . . . . . . . . . . . .                                       10 a
TABLE OF CONTENTS Section Pace C'V E R V I E W.............................................
sic i
-i-1.0 I NT R O D UCT I O N........................................
4 11 Ik         W
I 2.0 ORGANIZATICN 08JECTIVES AND PRIORITIES............
      '9
2 2
  .L;{                                                           -111 -
3.0 STATION 5
  .J .,
2 3.1 Station Management 3
 
3.2 Operations A
503 -!
3.3 Work Management 3.4 Station Technical 5
3.5 Maintenance 6
4.0 SAFETY REVIEW 6
5.0 CUALITY ASSURANCE 7
6.0 PROJECT ENGINEEP,ING 7
7.0 CONFIGURATION MANAGEMENT 8
8.0 TRAINING 9
9.0 ORGANIZATION STRUCTURE, POLICIES AND PROCEDURES 9
10.0 ORGANIZATIONAL COMMUNICATIONS....................
10 a
sic 4
i 11 Ik W
'9
.L;{
-111 -
.J.,


==1.0        INTRODUCTION==
503 -!


==1.0 INTRODUCTION==
W Southern California Edison Company (SCE) has been an operating nuclear utility since 1968 when San Onofre Nuclear Generating Station (SONGS) Unit I was declared commercial.
W Southern California Edison Company (SCE) has been an operating nuclear utility since 1968 when San Onofre Nuclear Generating Station (SONGS) Unit I was declared commercial.
In 1970, SCE announced the construction of SONGS Units 2 and 3 and in 1973 was granted a construction permit. SONGS Unit 2 is only the sixth unit to be granted a full power operating license since the Three Mile Island incident in 1979.
In 1970, SCE announced the construction of SONGS Units 2 and 3 and in 1973 was granted a construction permit. SONGS Unit 2 is only the sixth unit to be granted a full power operating license since the Three Mile Island incident in 1979.
5 Unit 2 was loaded with fuel in February 1982 and is currently in power ascension testing. Unit 3 was loaded with fuel in November 1982. The request for a full power operating license for Unit 3 has been deferred in order to focus on Unit 2 activities.
5 Unit 2 was loaded with fuel in February 1982 and is currently in power ascension testing. Unit 3 was loaded with fuel in November 1982. The request for a full power operating license for Unit 3 has been deferred in order to focus on Unit 2 activities.
Unit 2's power ascension program has experienced schedule delays, including problems with the Nuc' ear Steam- Supply System (NSSS) and the Balance of
Unit 2's power ascension program has experienced schedule delays, including problems with the Nuc' ear Steam-Supply System (NSSS) and the Balance of
    ]         Plant (BOP).
]
Plant (BOP).
Issues concerning regulatory compliance developed and eventually resulted in a Nuclear Regulatory Commission (NRC) enforcement meeting on March 7,1983.
Issues concerning regulatory compliance developed and eventually resulted in a Nuclear Regulatory Commission (NRC) enforcement meeting on March 7,1983.
Because of this, SCE retained Management Analysis Company (MAC) to perform a management diagnostic. The objectives of the diagnostic were:
Because of this, SCE retained Management Analysis Company (MAC) to perform a management diagnostic. The objectives of the diagnostic were:
e Review and appraisal of the start-up, power ascension and initial operation I                  activities associated with SONGS Units 2 and 3. Rather than attempting to examine every ascect of the entire station, the effort focused on specific processes and interaction among the Engineerint,, Construction, Start-up, Operations and Quality Assurance (CA) organizations. Particular attention was given to activities associated with safety and regulatory compliance.
I Review and appraisal of the start-up, power ascension and initial operation e
g         e El                Determination of the key factors adversely affecting start-up, power ascension, initial operation and associated management systems.
activities associated with SONGS Units 2 and 3. Rather than attempting to examine every ascect of the entire station, the effort focused on specific processes and interaction among the Engineerint,, Construction, Start-up, Operations and Quality Assurance (CA) organizations. Particular attention was given to activities associated with safety and regulatory compliance.
            =
g e
In conjunction with key SCE personnel, development of recommendations that will assist them in improving performance, with emphasis upon current safety and compliance issues.
Determination of the key factors adversely affecting start-up, power El ascension, initial operation and associated management systems.
lf o V
In conjunction with key SCE personnel, development of recommendations
l
=
that will assist them in improving performance, with emphasis upon current safety and compliance issues.
lf oV l


5c82-3                                                                                 -:-
5c82-3 MAC assembled a team of senior, experienced personnel to conduct a series of interviews, observations and document reviews.
MAC assembled a team of senior, experienced personnel to conduct a series of     -
This team consisted of professionals with significant experience in project management, operations management, QA, organizational development and human behavior.
interviews, observations and document reviews.         This team consisted of professionals with significant experience in project management, operations management, QA, organizational development and human behavior.
I We interviewed more than 90 people in SCE, NRC, Bechtel, Combustion Engineering and other contractor organizations and reviewed associated i
I               We interviewed more than 90 people in SCE, NRC, Bechtel, Combustion i                Engineering and other contractor organizations and reviewed associated documentation.
documentation.
Based on our evaluation, the following recommendatic7s for improvement are made.
Based on our evaluation, the following recommendatic7s for improvement are made.
I 2.0       ORGANIZATION OBJECTIVES AND PRIORITIES We assessed SCE's objectives and priorities for SONGS to determine how these objectives and priorities were addressed at various levels within the company.
I 2.0 ORGANIZATION OBJECTIVES AND PRIORITIES We assessed SCE's objectives and priorities for SONGS to determine how these objectives and priorities were addressed at various levels within the company.
I Recommendations                   -
I Recommendations 2.1 Management must continue to reinforce to SONGS personnel at all levels,that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant. This reinforcement should occur in all formal and informal communications.
2.1       Management must continue to reinforce to SONGS personnel at all levels,that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant. This reinforcement should occur in all formal and informal communications.
I 2.2 Management must take action to establish the Station as the lead SONGS organization and specifically identify that the Station is responsible for resolving conflicts between safety and compliance and the power ascension schedule.
I     2.2       Management must take action to establish the Station as the lead SONGS organization and specifically identify that the Station is responsible for resolving conflicts between safety and compliance and the power ascension i                  schedule.
i I 3.0
I 3.0     . STATION 3.1     STATION MANAGEMENT We assessed the role of Station management in placing the units into cperation.
. STATION 3.1 STATION MANAGEMENT We assessed the role of Station management in placing the units into cperation.
p     -
p
    .6 il!
.6 il!


5084-3                                                                                         .
5084-3.
        )               Recommendations 3.1.1       Make maximum use of oualified Project personnel (also processes and systems) to infuse plant knowledge and experience into the Station organi.:ation.
)
3.1.2       Establish development plans for each manager and supervisor. Such plans should identify specific managerial strengths and weaknesses and establish priorities and target dates for improvement.
Recommendations 3.1.1 Make maximum use of oualified Project personnel (also processes and systems) to infuse plant knowledge and experience into the Station organi.:ation.
3.2         OPERATIONS We co!1ected information on operations from a cross section of the organization, including Start-up and the operators themselves.
3.1.2 Establish development plans for each manager and supervisor. Such plans should identify specific managerial strengths and weaknesses and establish priorities and target dates for improvement.
3.2 OPERATIONS We co!1ected information on operations from a cross section of the organization, including Start-up and the operators themselves.
A number cf positive actions have already helped the shift operations team to function more effectively. Among these are:
A number cf positive actions have already helped the shift operations team to function more effectively. Among these are:
e      Posting someone to better control access to the control room o      Implementation of an equipnnnt control function               ,
Posting someone to better control access to the control room e
e    Slowdown of Unit 3       -
Implementation of an equipnnnt control function o
e    Additional shift overlap B                   e    Addition of. clerical and other help to the shift crew I                 Recommendations 3.2.1     Although much has already been done to relieve the shift crew from distractions, more should be done. Make significant physical imprcvements in the shift supervisor's office to allow him to function Jetter. It should be I                 determined why the operators do not make significant use of the plant computer. A study should be conducted of control room area activities and appropriate improvements implemented.
Slowdown of Unit 3 e
3.2.2     Action should be taken to ensure that the shift supervisors get out into the p; ant regularly. This could be in conjunction with training periods, but it shcu!d als
Additional shift overlap e
      ')           come at times when they can interact with equipment operators and other people on their own shif ts.
B Addition of. clerical and other help to the shift crew e
i                                                                   -
I Recommendations 3.2.1 Although much has already been done to relieve the shift crew from distractions, more should be done. Make significant physical imprcvements in the shift supervisor's office to allow him to function Jetter.
E__.__
It should be I
determined why the operators do not make significant use of the plant computer. A study should be conducted of control room area activities and appropriate improvements implemented.
3.2.2 Action should be taken to ensure that the shift supervisors get out into the p; ant regularly. This could be in conjunction with training periods, but it shcu!d als
')
come at times when they can interact with equipment operators and other people on their own shif ts.
i E__.__
SM l
l
l
  '                                                      SM l


I 1 3CE4-3                                                                                   -
I 1
,O 3.2.3     The control room area study recommended above should include evaluation of development of a system operability status display process. Current system operability status should be readily available to the operators. The evaluation should als consider communication of plant and system status to interfacing organizations and people.
3CE4-3
3.2.4     The operators will benefit greatly from improvements in plant scheduling and work coordination as identified in the following Work Management section.
,O 3.2.3 The control room area study recommended above should include evaluation of development of a system operability status display process. Current system operability status should be readily available to the operators. The evaluation should als consider communication of plant and system status to interfacing organizations and people.
3.2.5     Make available to the ope' ators a well-defined list of contacts, such as systems engineers for times when they need information or assistance.
3.2.4 The operators will benefit greatly from improvements in plant scheduling and work coordination as identified in the following Work Management section.
3.2.6     The Technical Specifications should be reviewed for improvements and reductions in complexity.
3.2.5 Make available to the ope' ators a well-defined list of contacts, such as systems engineers for times when they need information or assistance.
3.2.7     Make a joint effort, working with the systems engineers, to improve operations     I procedures and reduce repeat procedural mistakes.
3.2.6 The Technical Specifications should be reviewed for improvements and reductions in complexity.
3.3'       WORK MANAGEMENT We assessed the station work activities to evaluate the impact on operations.
3.2.7 Make a joint effort, working with the systems engineers, to improve operations I
Recommendations 3.3.1     Develop a work mtnagement. function responsible for planning and coordinating maintenance, ISI, surveillance testing, design change modifications and outages. This function should be a continuous, all-shift effort with a strong, full-time work manager who reports directly to the Station manager.
procedures and reduce repeat procedural mistakes.
3.3.2     For the long term, this function should include outage planning and management responsibility. This will establish the Station :n the lead outage role. Project work during operation and outages would be integrated into th'e overall Station plan and schedule.
3.3' WORK MANAGEMENT We assessed the station work activities to evaluate the impact on operations.
3.3.3     Develop a management information system to succort the work and cutage
Recommendations 3.3.1 Develop a work mtnagement. function responsible for planning and coordinating maintenance, ISI, surveillance testing, design change modifications and outages. This function should be a continuous, all-shift effort with a strong, full-time work manager who reports directly to the Station manager.
( ~'           planning function. Interim processes will have to be used until this system is developed.
3.3.2 For the long term, this function should include outage planning and management responsibility. This will establish the Station :n the lead outage role. Project work during operation and outages would be integrated into th'e overall Station plan and schedule.
y                                                   m=
3.3.3 Develop a management information system to succort the work and cutage
( ~'
planning function. Interim processes will have to be used until this system is developed.
y m=


5CEe-3                                                                                 ,-
5CEe-3 3.4 STATION TECHNICAL O
3.4     STATION TECHNICAL O             We assessed Station Technical management, its functions and its pecple, to increase our understanding of their roles and how effectively these roles are being carried out.
We assessed Station Technical management, its functions and its pecple, to increase our understanding of their roles and how effectively these roles are being carried out.
Recommendations 3.4.1   Define goals and objectives for Stati n Technical.
Recommendations 3.4.1 Define goals and objectives for Stati n Technical.
3.4.2   Complete the development of the system engineering function which has recently been initiated. Define the functions and responsibilities. System engineers should be fully knowledgeable about the design and function of their assigned systems and components. These system engineers should be responsible for maximizing the performance o'f their systems. To do this, they need a sense of commitment.         Systems engineers should be responsible for providing technical support to station operators, maintenance and other personnel.
3.4.2 Complete the development of the system engineering function which has recently been initiated.
Specific responsibilities should include:                                         $
Define the functions and responsibilities.
ist n             e     ISI testing.
System engineers should be fully knowledgeable about the design and function of their assigned systems and components. These system engineers should be responsible for maximizing the performance o'f their systems. To do this, they need a sense of commitment.
Systems engineers should be responsible for providing technical support to station operators, maintenance and other personnel.
Specific responsibilities should include:
ISI testing.
ist n e
g 1._/
g 1._/
e    Knowing, reviewing and improving the operating procedures and technical specifications.
Knowing, reviewing and improving the operating procedures and technical e
  'E                 s    Being a point of centact on any problem or question related to operations, test, maintenance and modification.
specifications.
e    Knowing the system operability status.
' E Being a point of centact on any problem or question related to operations, s
e     Knowing about all problems and proposed resolutions.
test, maintenance and modification.
e     Initiating plant betterment proposals.
Knowing the system operability status.
e   Reviewing design changes for maintainability and coerability.
e Knowing about all problems and proposed resolutions.
3.4.3   Supplement training on plant systems and administrative controls for the system
e Initiating plant betterment proposals.
    ,                engineers, shif t engineers and STAS.
e Reviewing design changes for maintainability and coerability.
e 3.4.3 Supplement training on plant systems and administrative controls for the system engineers, shif t engineers and STAS.
3.4.4 Provide qualified shif t engineers for all shif ts to provide better support.
3.4.4 Provide qualified shif t engineers for all shif ts to provide better support.
1 Q Y
1 Y
      ,                                                Ms;
Q Ms;


T       5033-3                                                                                       6 3.5       MAINTENANCE We looked at the Start-up and Station Maintenance organizations with the E                 objective of evaluating their roles and functions.
T 5033-3 6 3.5 MAINTENANCE We looked at the Start-up and Station Maintenance organizations with the E
Recommendations 3.5.1     Integrate Start-up Maintenance into Station Maintenance to:         resolve the B                 responsibility and accountability issue; take advantage of resources, systems and organizational units of both organizations; and, to improve maintenance planning and execution.
objective of evaluating their roles and functions.
i I           3.5.2     Consider integrating instrument and control (I&C) maintenance into Station Maintenance to provide improved activity planning and coordination.
Recommendations 3.5.1 Integrate Start-up Maintenance into Station Maintenance to:
3.5.3     Complete development of an integrated maintenance management information system as soon as possible.
resolve the B
4.0       SAFETY REVIEW I')                We assessed both the on-site and of f-site safety review functions to determine
responsibility and accountability issue; take advantage of resources, systems and organizational units of both organizations; and, to improve maintenance planning and execution.
                                                                                                      ~
i I
the degree of their effectiveness.
3.5.2 Consider integrating instrument and control (I&C) maintenance into Station Maintenance to provide improved activity planning and coordination.
Recommendations I       4.1       Require the On-Site Review Committee (OSRC) to assume more oversight in
3.5.3 Complete development of an integrated maintenance management information system as soon as possible.
,                    reviewing plant activities, schedules and operations for regulatory compliance a                 ar.d safety significance.
I')
;          4.2       Emphasize and strengthen requirements for Nuclear Safety Grcuo (NSG) to provice management with an overall assessment of plant safety.
~
4.3       Establish a formal system for follow-up and closecut of recommendations submitted by the Independent Safety Engineering Group (ISEC) and NSG.
4.0 SAFETY REVIEW We assessed both the on-site and of f-site safety review functions to determine the degree of their effectiveness.
4.4       Improve communications and interaction between NSG and Station by clarifying
Recommendations I
(,)\
4.1 Require the On-Site Review Committee (OSRC) to assume more oversight in reviewing plant activities, schedules and operations for regulatory compliance a
i the roles and requiring NSG to sper d more time at the site.
ar.d safety significance.
4.2 Emphasize and strengthen requirements for Nuclear Safety Grcuo (NSG) to provice management with an overall assessment of plant safety.
4.3 Establish a formal system for follow-up and closecut of recommendations submitted by the Independent Safety Engineering Group (ISEC) and NSG.
4.4 Improve communications and interaction between NSG and Station by clarifying i(,)\\
the roles and requiring NSG to sper d more time at the site.
(
(
l nc=
l nc=


Y       50Sa-?                                                                                   -7
Y 50Sa-?
  .d 5.0         QUALITY ASSURANCE We assessed the QA function to develep an undarstanding of its role in relatien to station activities.
-7
Recommendation 5.1         QA must monitor and assure performance of the line organization by providing timely information to the Vice President, NE&O. The current reporting system should be reviewed to determine if adequate emphasis is being communicated to upper management of needed corrective actions and of untimely delay of response to Non-Conformance Reports (NCRs) and Corrective Action Reports (CARS). Problems should be reported in a manner which highlights the more important issues.
.d 5.0 QUALITY ASSURANCE We assessed the QA function to develep an undarstanding of its role in relatien to station activities.
6.0       PROJECT ENGINEERING We assessed the Project Engineering function to develop an understanding of its l
Recommendation 5.1 QA must monitor and assure performance of the line organization by providing timely information to the Vice President, NE&O. The current reporting system should be reviewed to determine if adequate emphasis is being communicated to upper management of needed corrective actions and of untimely delay of response to Non-Conformance Reports (NCRs) and Corrective Action Reports (CARS). Problems should be reported in a manner which highlights the more important issues.
6.0 PROJECT ENGINEERING We assessed the Project Engineering function to develop an understanding of its l
role in relation to Station activities.
role in relation to Station activities.
g6                 Recommendations 6.1       One SCE organization should have primary and overall responsibility for design changes throughout the anticipated long-term retrofit work. Assign responsibil-ity for the adequacy of plant design to Project Engineering and communicate E                  this to appropriate organizations.
g6 Recommendations 6.1 One SCE organization should have primary and overall responsibility for design changes throughout the anticipated long-term retrofit work. Assign responsibil-E ity for the adequacy of plant design to Project Engineering and communicate this to appropriate organizations.
6.2       Assign assistant project engineers within Project Engineering and define their i                   functions and responsibilities in conjunction with these of Station Technical to ensure ecmpatibility of functions and establish aapropriate interfaces. -
6.2 Assign assistant project engineers within Project Engineering and define their i
6.3       Assess the work lead, duty assignments and staffing for the on-site Project Engineering function to determine how best to improve its ability to meet performance expectations.
functions and responsibilities in conjunction with these of Station Technical to ensure ecmpatibility of functions and establish aapropriate interfaces. -
6.4       Clarify the roles of Project Engineering and Station Technical functions by
6.3 Assess the work lead, duty assignments and staffing for the on-site Project Engineering function to determine how best to improve its ability to meet performance expectations.
    /]
6.4 Clarify the roles of Project Engineering and Station Technical functions by
v-establishing responsibilities of each, defining comoatib!c goals and Objectives
/]
(              and by working to a commen set of priorities.
establishing responsibilities of each, defining comoatib!c goals and Objectives v-(
and by working to a commen set of priorities.
1.5 En==
1.5 En==
5084-3
5084-3
                                                                                                    -a.
-a.
6.5       Establish long-term roles for Project Engineering and Station Technical which are consistent with policies for role of Station and Project support functions.
6.5 Establish long-term roles for Project Engineering and Station Technical which are consistent with policies for role of Station and Project support functions.
7.0       CGNFIGURATION MANAGEMENT Ed We reviewed selected areas relating to configuration identificatien, change control and status information reporting.
7.0 CGNFIGURATION MANAGEMENT Ed We reviewed selected areas relating to configuration identificatien, change control and status information reporting.
Recommendations 7.1 Complete efforts underway to update the master eculpment list. This work should be given a high priority.
Recommendations 7.1 Complete efforts underway to update the master eculpment list. This work should be given a high priority.
7.2 Assign high priority to completing the review of the temporary modifications and' to performing the necessary engineering and safety evaluations of those changes considered permanent. Establish an administrative control process for temporary modifications that clearly define conditions for their utilization.
7.2 Assign high priority to completing the review of the temporary modifications and' to performing the necessary engineering and safety evaluations of those changes considered permanent. Establish an administrative control process for temporary modifications that clearly define conditions for their utilization.
C) 7.3 Review Station and Project design change control procedures to assure compatibility. These procedures should clearly define the functions and responsibilities of each.
C) 7.3 Review Station and Project design change control procedures to assure compatibility.
These procedures should clearly define the functions and responsibilities of each.
The effort should build upon the work recently completed by the Configuration Task Group for Unit 1.
The effort should build upon the work recently completed by the Configuration Task Group for Unit 1.
7.4 Immediate training and clarification on the use of existing procedures should be provided to those Station and Project staff personnel who are involved with design change activities.
7.4 Immediate training and clarification on the use of existing procedures should be provided to those Station and Project staff personnel who are involved with design change activities.
7.5 Consider establishing a change management function to review, prioritize end appruve all requests for changes in plant configuration.
7.5 Consider establishing a change management function to review, prioritize end appruve all requests for changes in plant configuration.
I     7.6 Develop an integrated configuration status reporting system which serves the 3
I 7.6 Develop an integrated configuration status reporting system which serves the needs of both Project and Station for tracking the status of plant cha.ge 3
needs of both Project and Station for tracking the status of plant cha .ge requests and plant modification packages (SPRs, PFCs, DCPs temporary modifications).
requests and plant modification packages (SPRs, PFCs, DCPs temporary modifications).
7
7
    %/
%/
c-_ _ __
c-_ _ __
Liu
Liu


5084-3                                                                                                                   ~9' 7.7       Resolve the problems associated with corporate document management                                                               .
5084-3
I
~9' 7.7 Resolve the problems associated with corporate document management I
>                            providing timely copies of requested documents.
providing timely copies of requested documents.
I 8.0       TRAINING The nuclear training function was assessed to develop an understanding of its support of the Station staff.
I 8.0 TRAINING The nuclear training function was assessed to develop an understanding of its support of the Station staff.
        .                  Recommendations 8.1       Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.
Recommendations 8.1 Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.
(
0.2 Improve training program effectiveness in the areas of supervisory training and i
0.2       Improve training program effectiveness in the areas of supervisory training and                                                     i management development.
management development.
9.0       ORGANIZATION STRUCTURE. POLICIES AND PROCEDURES A review was made of the SCNGS-related organizational structure and the way
9.0 ORGANIZATION STRUCTURE. POLICIES AND PROCEDURES A review was made of the SCNGS-related organizational structure and the way
                                                                                      ~
}I
}I                          that responsibilities, commitments and policies are communicated to 3                 organizational elements.
~
that responsibilities, commitments and policies are communicated to 3
organizational elements.
Recommendations i
Recommendations i
9.1       Perform a complete review of functions and clarify responsibilities and                                                           '
9.1 Perform a complete review of functions and clarify responsibilities and accountabilities, eliminating gaps and overlap. This should be done with the objective of streamlining the organization. Specific emphasis should be placed on the Station organization and its interfaces with other organizations related I
accountabilities, eliminating gaps and overlap. This should be done with the
to SONGS, such as Nuclear Engineering, Safety and Licensing, Project and 1
      .                  objective of streamlining the organization. Specific emphasis should be placed on the Station organization and its interfaces with other organizations related I
Quality Assurance.
to SONGS, such as Nuclear Engineering, Safety and Licensing, Project and                                                             1
B 9.2 '
                      . Quality Assurance.
Develop top level administrative control procedures which include pregram-matic commitments, management pc!icies and organizational responsibilities y
B       9.2 '   Develop top level administrative control procedures which include pregram-matic commitments, management pc!icies and organizational responsibilities y                 and interfaces.
and interfaces.
o
o 9.3 Establish a clear plan and hierarchy for acministrative control procedures. Too l
        ,      9.3     Establish a clear plan and hierarchy for acministrative control procedures. Too l                 level administrative . control procedures should establish requirements - for t
level administrative. control procedures should establish requirements - for procedures and instructions by the implementing organizations. The plan should t
procedures and instructions by the implementing organizations. The plan should
address interfacing of procedures among implementing organizations.
        ,                address interfacing of procedures among implementing organizations.
i m
i                                                                                   m E t We
E t We
_. - - _ _                _  . . _ - - . - , _    __._-._._,_.,_..___,_-m,_                             m.          _ . - _ _ _ - _ . .
__._-._._,_.,_..___,_-m,_
m.


5084-3                                                                                 t
5084-3 t
      ) 9.4     Establish a control process that tracks regulatory requirements and commitments from their source to the implementing procedures.
)
R       9.5    Much use can be made of the material currently existing in procedures.
9.4 Establish a control process that tracks regulatory requirements and commitments from their source to the implementing procedures.
However, it is strongly recommended that existing procedures be reviewed for r              inconsistencies and gaps.
R be made of the material currently existing in procedures.
  ,H     10.0   ORGANIZATIONAL COMMUNICATIONS We examined organizational contacts, interfaces and channels of communica-tion in order to understand how managers and supervisors commonly interact.
9.5 Much use can However, it is strongly recommended that existing procedures be reviewed for inconsistencies and gaps.
Recommendations 10.1   Evaluate the need for additional regularly scheduled meetings with key managers of the SONGS-related organizations to improve communication of general and specific issues, review of commitments, coordination of efforts and H             planning. Address key interface areas such as:
r
e    Key managers of NE&O and QA e     Station managers 6     10.2   Senior and middle management should communicate clearly to their sub-ordinates the need for initiating individual face-to-face communications.
,H 10.0 ORGANIZATIONAL COMMUNICATIONS We examined organizational contacts, interfaces and channels of communica-tion in order to understand how managers and supervisors commonly interact.
10.3   Emphasize team building to improve coordination and problem solving among key organizational units.
Recommendations 10.1 Evaluate the need for additional regularly scheduled meetings with key managers of the SONGS-related organizations to improve communication of general and specific issues, review of commitments, coordination of efforts and H
planning. Address key interface areas such as:
Key managers of NE&O and QA e
Station managers e
6 10.2 Senior and middle management should communicate clearly to their sub-ordinates the need for initiating individual face-to-face communications.
10.3 Emphasize team building to improve coordination and problem solving among key organizational units.
E a
E a
7'.
7'.
      ]
]
h 7                                              rn==
h rn==
J N}}
7J N}}

Latest revision as of 02:58, 15 December 2024

Action Plan for Improvement of Operation of San Onofre Nuclear Generating Station,Units 2 & 3
ML20076C906
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/05/1983
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20076C848 List:
References
PROC-830705-02, NUDOCS 8308230221
Download: ML20076C906 (74)


Text

.

SCE ACTION PLAN FOR IMPROVEMENT OF THE OPERATION OF SAN ONOFRE NUCLEAR GENERATING STATION units a ^uo 3 O

JULY 5, 1983 O

t 8300230221 830017 DR ADOCK 0500036y u

TABLE OF CONTENTS i 'O I

I.

Preface 1

1 II. Executive Summary 2

III. Introduction 5

i i

IV. Recommendations and Action Plan 9

1 V.

Appendix 4

I j

1.

Categorization of Major Recommendations with Specific-Recomendations 2.

MAC Report I

i

}

l 4

i o i

1 i

1 I

l-4 4

i O

t i '

L ~,.., m

I.

PREFACE The purpose of this report is to describe the action plans developed for responding to recommendations made by Management Analysis Company (MAC) for improvement of the operation of San Onofre Nuclear Generating Station, Units 2 and 3.

d This report addresses all of the recommendations made by MAC and includes action plans

developed by SCE in response to each recommendation.

'N

3 O

4

.O t

_i_

II.

EXECUTIVE

SUMMARY

~

During the high activity period associated with power ascension testing of San Onofre Units 2 and 3 concerns developed with the adequacy of regulatory compliance.

These concerns resulted in a Nuclear Regulatory Commission enforcement conference with SCE on March 7, 1983.

In addition to action.already underway to ensure adequate levels of compliance immediate actions were taken directly as a result of this enforcement conference.

Included in these actions was engaging Management Analysis Company (MAC) to develop recommendations for the improvement of the operation of San Onofre Nuclear Generating Station, Units 2 and 3.

The result of the study performed by MAC was a number of broad major recommendations and several associated specific recommendations.

N r

O-The broad major recommendatiens are:

o Reaffirm that safety and compliance take precedence in any conflict with schedule objectives.

o Clearly establish that the Station is the lead organization.

o Integrate qualified Project personnel into the Station organization.

AV( _.,.

o Improve conditions in the control room area, focusing especially O

upo# coasestioa. oistractio#s. commuaicetieas eae erste opereatiitr status information.

o Complete development in specific areas of the Station Technical support function.

o Establish a Station work management function to coordinate all work activities.

1 o

Integrate Start-up Maintenance into Station Maintenance.

i o

Improve the reporting of compliance issues by the safety review and quality assurance functions.

Also improve the tracking and timeliness of corrective action taken in respen: to the: 1: sues.

o Develop top level policies and administrative control procedures which define and clarify the functions, responsibilities and accountabilities of SONGS-related organizations.

o Improve communications between and within SONGS organizations.

SCE studied these recommendations in consultation with MAC and developed action plans for each specific recommendation within these broad major t

recommendations.

Individuals within SCE were assigned responsibility and a O

schedule was developed for implementation of each action plan item associated with each specific recommendation.

MAC stated in their report " Development and implementation of specific action plans by SCE management addressing the MAC recommendations should result in improved performance in the operation of SONGS."

SCE agrees with that conclusion and also believes implementation of the specific action plans detailed in Section IV of this report will significantly improve regulatory compliance.

O I

I a

M 1

I i

.O t

r

.4_

l i

.. _ - ~ _.. -,, - - - - -, _.,,,, _,. -,, -. -.. _,,.,,, _, _,,., -.. - _.. _.

III.

INTRODUCTION O

San Onofre Nuclear Generating Station, Units 2 and 3 are duplicate 1140 MW nuclear power plants.

The Nuclear Steam Supply Systems were supplied by Combustion Engineering.

The Architect Engineer and Constructor was Bechtel Corporation.

- A low power license for Unit 2 wa.s granted on February 16, 1982.

Fuel was loaded and initial criticality was achieved on July 26, 1982.

A full power license was received on September 7,

1982 and the unit synchronized on September 20, 1982. By March 1983 Unit 2 had operated up to 50% pcwer.

A low power license was granted on November 15, 1982 for Unit 3.

Fuel loading was completed and a full power license was being requested for March 28, 1983.

-In early March 1983, Unit 2 was still undergoing startup testing at the 50%

power level and Unit 3 was proceeding at a pace which would result in power testing in parallel with completion of Unit 2 power testing.

This resulted in a high level of activity in the Project, Station and Organizations supporting the startup and operation of San Onofre.

During this period of high activity associated with power ascension, concerns with regulatory compliance developed.

These concerns resulted in a Nuclear Regulatory Commission enforcement conference with SCE on March 7,1983.

t i

Although SCE had already recognized the need, and was taking action, to deal O

aggressively with many of tnese compliance issues, additional immediate action was taken to resped to the enforcement conference.

This action was initiated by Mr. William R. Gould, Chairman of the Board and Chief Executive Officer.

The direction provided by Mr. Gould and the current status with respect to each item is presented below:

o Startup of Unit 3 was deferred until adequate personnel resources were available to proceed and only when it would not in any way interfere with activities proceeding on Unit 2.

As of mid-June 1983, Unit 2 has achieved 100". power and most testing has been completed.

O V

o Unit 3 was not t) be taken critical until. Mr. Gould personally approves the action.

This is to occur only when Unit 3 is ready to go critical and when such action will not interfere with Unit 2 safety and progress.

Currently Unit 3 criticality is forecast for l

mid-July 1983 after virtually all Unit 2 testing is complete.

o Based on this guidance, and the time required to assess the situation, tne scheduled March 28, 1983 Unit 3 full-power license meeting with the Commission was delayed for at least 30 days.

On June 22, 1983 a letter was sent to NRC requesting a full power license for Unit 3 in August, 1983.

O t

o In order to shorten the chain of command, Mr. David J. Fogarty,

(]

Executive Vice President, reporting directly to Mr.

Gould was assigned direct and onsite responsibility for the continued startup of these units.

This was to augment the organizational structure and capability already in place.

o On March 14, 1383, Mr. Gould met on site with the key officers, managers and supervisors (35 personnel) from the Station, the Project, Quality Assurance and the Engineering, Licensing and Safety staff to insure that they understood the path to be followed.

This information was then communicated to personnel in these organizations at all levels.

o Efforts

'o tighten up any procedural problems and reinforce the absolute requirement for compliance as well as timely and candid communications with the NRC were increased.

This effort is continuing.

Disciplinary action has been taken when lapses in procedural complian'ce occur.

More management involvement in and approval of communications with NRC has been and will continue to be required.

O Mr. Gould talked with the senior of ficers o'f the primary contractor, Bechtel, and directed them to proceed on the same deliberate path as outlined to SCE personnel.

O t --

A qualified outside fi rm, Management Analysis Company (MAC) was o

O(./

~

engaged to independently assess all aspects of the organization and programs to startup San Onofre in order to determine the root causes of the problems and the actions required to correct them.

The objectives of the study to be conducted by MAC were:

I o

Review and appraisal of. the startup, power ascension and initial operation activities associated with SONGS Units 2 and 3.

Rather than attempting to examine every aspect of the entire station, the effort focused on specific processes and interaction among the Engineering, Construction, Start-up, Operations and Quality Assurance (QA) organizations.

Particular attention was given to activities associated with safety and regulatory compliance.

d o

Determination of the key factors adversely affectir.g startup, power ascension, initial operation and associated management systems.

o In conjunction with key SCE personnel, development of 4

recommendations that will assist them in improving perform: ace, with emphasis upon current safety and compliance issues.

This study by MAC resulted in a report to SCE entitled " Recommendation for the Improvement of the Operation of San Onofre Nuclear Generating Station, Units 2 and 3."

This report is included as Appendix 2.

SCE's planned actions in response to these recommendations are included in Section IV of this report.

O t.-

IV. RECOMMENDATION AND ACTION PLANS mQ In the overview section of the MAC Report, ten major recommendations were made.

In the body of the report, forty-eight recommendations were made which provide more specifics associated with each major recommendation.

Appendix 1 of this report categorizes the forty-eight specific recommendations under each of the ten major recommendations.

Some of the specific recommendations are applicable to more than one major recommendation and therefore appear more than once.

Appendix 1 demonstrates the ten major recommendations are fully addressed by the forty-eight specific recommendations.

Therefore, action plans and schedules for implementation were developed for each of the j

forty-eight specific recommendations.

The Management Analysis Company i

report is provided in Appendix 2 of this report.

Tracking of the status Q

of each action item will be accomplished by entering them into the Nuclear Engineering and Operation Department Commitment Register.

SCE had action underway for approximately 40 percent of the recommendations when MAC began tfieir study.

Where appropriate, these actions are included in the following action plans.

The format used for presentation of the action plans consists of the MAC recommendation followed by the action plan.

In many cases the action plan cons 1sts of several action items.

t

_9 l

1 i

2.0 ORGANIZATION ORJECTIVES AND PRIORITIES hl MAC Recommendation 1

2.1 Management must continue to reinforce to SONGS personnel at all levels that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant.

This reinforcement should occur in all formal and informal communications.

Action Plan 2.1.1 Convene a meeting between senior management and key officers, managers and supervisors to reinforce that safety and comoliance are qV their first priority, i

2.1.2 Convene similiar meetings between middle management and their subordinates at all levels, 2.1.3 Review September 13, 1982 letter from W. R. Gould on Review Process for Nuclear Safety Concerns.

Revise as appropriate to reinforce that i

safety and compliance are the first priority for employees in executing their duties.

p.

--w

~ -,

-o

...----.-,.e-

,,, - - ~... -..,. -

2.1.4 Research and itemize existing policy directed to sa fety and compliance as a first priority.

Review this material and supplement or revise as appropriate to reinforce safety and compliance as a first priority.

2.1.5 Document dates for CSI meetings with Operations personnel at which priorities have been discussed.

Based on this review, insure that l

all operating section personnel have been advised that safety and compliance are the first priority.

2.1.6 Document formal group discussions with assigned personnel since 3/7/83 at which priorities have been discussed.

Based on this review, insure that safety and compliance as the first priority has been discussed with all maintenance, technical and health physics personnel.

2.1.7 Obtain similar information and take similar action to that above for the Project personnel responsible for the power ascension program.

h; 2.1.8 Provide required priority emphasis in regular staff meetings and at OSRC meetings.

O t

MAC Recommendation 0

2.2 Management must take action to establish the Station as lead SONGS organization and specifically identify that the Station is responsible for resolving conflicts between safety and compliance and the power ascension schedule.

Action Plan 2.2.1 Review the Jurisdiction Statements for the Nuclear Operations Organization and San Onofre Nuclear Generating Station and revise as appropriate to assert lead responsibility in all matters involving safety and compliance.

AV 2.2.2 Review the Jurisdiction Statements for the Project and revise as appropriate to indicate the Station is responsible for resolving conflicts between safety and compliance and the power ascension schedule.

3.0 STATION 3.1 STATION MANAGEMENT t

MAC Recommendation 3.1.1 Make maximum use of qualified Project personnel (also processes and CNJ systems) to infuse plant knowledge and experience into tne Station

(

organization.

Action Plan I)

~

s 3.1.1.1 Identify and plan for opportunities to achieve integration.

3.1.1.2 Carry forward plans to integrate qualified Project personnel in the Maintenance area.

3.1.1.3 Identify Project processes and systems that can be utilized in the Station which have not been previously transferred.

Based on this review, recommend appropriate action to utilize Project processes and systems in the Station.

~

MAC Recommendation 3.1.2 Establish development plans for each manager and supervisor.

Such plans should identify specific managerial strengths and weaknesses and establish priorities and target dates for improvement.

l Action Plan 3.1.2.1 Bring APS performance appraisal proce s current.

l O

t <

3.2 OPERATI0t4S O

We (MAC) collected information on operations from a cross-section of the organization, including Startup and the operators themselves.

A number of positive actions have already helped the shift operations team to function more effectively. Among these are:

- Posting someone to better control access to the Control Room

- Implementation of an equipment control function

- Slowdown of Unit 3

- Additional shift. overlap

- Addition of clerical and other help to the shift crew MAC Recommendation 3.2.1 Although much has already been done to relieve the shift cred from distractions, more snould be done.

Make significant physical improvements in the shift supervisor's office to allow him to function better.

It should be determined why the operators do not make significant use of the plant computer.

A study should be conducted of Cor *.rol Room area activities and appropriate improvements implemented.

t -- - _.

.=. - -. -

~

Action Plan 3.2.1.1 Expedite Project work to complete physical enhancements of the shift supervisor's office.

3.2.1.2 Provide an assessment of progress in improving operability of the r

plant computer. and its use in supporting operations.

Based on this assessment, recommend additional changes to improve operator use of the plant computer, if appropriate.

3.2.1.3 Following completio1 of ongoing MAC equipment control work, extend study into Control Room interface / activities.

Based on the results.

of_ the study, recommend appropriate improvements for implementation.

O MAC Recommendation 3.2.2 Action should be taken to ensure that the shift supervisors get out into the plant regularly.

This could be La cordunction with training periods, but it should also come at times when they can interact with equipment operators and other people on their own shifts.

k V

L Action Plan 3.2.2.1 Through CSI meetings, identify action needed to increase shift supervisor's surveillance of plant activities.

Implement, or recommend for approval as appropriate, such action as is warranted.

i MAC Recommendation 3.2.3 The Control Room area study recommended above should include evaluation of development of a system operability status display process.

Current system operability status should be readily available to the operators.

The evaluation should also consider communication of plant and system status to interfacing organizations and people.

Action Plan 3.2.3.1 These same items appear as part of the MAC equipment control study.

Extend ongoing work to include valuation of these recommendations.

Based on the results of this evaluation, propose appropriate action, if any.

MAC Recommendation 3.2.4 The operators will benefit greatly from improvements in plant

.f~'

scheduling and work coordination as identified in the following Work l

Management section.

~

Action Plan 3.2.4.1 Provide visibility for actions required to implement Work Management as currently planted.

MAC Recommendation 3.2.5 Make available to the operators a well-defined list of contacts, such as systems engineers for times when they need information or assistance.

Action Plan 3.2.5.1 Review and formalize, if necessary, on-shift information or assistance contacts.

3.2.5.2 Review and

improve, if necessary, identification of Technical

~

Depa tment support to the operators.

Note similar item identified from CSI process.

MAC Recommendation 3.2.6 The Technical Specifications should be reviewed for improvements and l

reductions in complexity.

1 0

1 Action Plan 3.2.6.1 Provide visibility to backlog of proposed changes to the Technical Specifications and identify those in preparation.

Describe ongoing review process and recommend additional action that might be taken to prioritize and expedite resolution of backlog.

3.2.6.2 Review the Technical Specifications with Operations and identi fy additional changes for improvement and reduced complexity.

3.2.6.3 Establish a task force to systematically evaluate and revise the Technical Specification to reduce complexity.

Q i.

MAC Recommendations l

3.2.7 Make a joint effort, working with the systems engineers, to improve operations procedures and reduce repeat procedural mistakes.

l Action Plan 3.2.7.1 Identify current activities to improve procedures and recommend how Technical Department engineers, or others, may be used to reduce procedural mistakes.

O l l l

l

3.3 WORK MANAGEMENT 7U MAC Recomendation 3.3.1 Develop a work management function responsible for planning and coordinating maintenance, ISI, surveillance testing, design change modifications and outages.

This function should be a continuous, all-shift effort with a strong, full-time work manager who reports

(

directly to the Station Manager.

Action Plan 3.3.1.1 Complete planning of this function and initiate implementation O

processes-3.3.1.2 Complete hiring of a Work Manager.

MAC Recommendation 3.3.2 For the long te nn, this function (work management) should include 1

outage planning and management responsibility.

This will establish the Station in the lead outage role.

Project work during operation i

and outages would be integrated into the overall Station plan and schedule.

I O

l l

_19 i

Action Plan

,3 V

3.3.2.1 Develop recommendations on wnether the Project or Station should have leadership in outage planning and management.

MAC Recommendation 3.3.3 Develop a management information system to support the work and outage planning function.

Interim processes will have to be used until this system is developed.

Action Plan

['~~)

3.3.3.1 Work with Material and Administrative Services olus Project

/

representatives, to identify the scope and objectives for this system

~~

and propose assignment of responsibilities.

3.4 STATION TECHNICAL MAC Recommehdation 3.4.1 Define goals and objectives for Station Technical.

Action Plan i

3.4.1.1 Itemize existing definition of goals and objectives.

Recommend additions / revisions where warranted.

MAC Recommendation i

3.4.2 Complete the development of the system engineering function which has recently been initiated.

Define the functions and responsibilities.

l System engineers should be fully knowledgeable about the design and function of their assigned systems and components.

These system engineers should be responsible for maximizing the performance of their systems.

To do this, they need a sense of commitment.

Systems f]

engineers should be responsible for providing technical support to station operators, maintenance and other personnel.

Specific responsibilities should include:

~

- ISI testing.

- Knowing,. reviewing and improving the operating procedures and technical specifications.

- Being a point of contact on any problem or question related to operations, test, maintenance and modification.

,O <

- Knowing the system operability status.

- Knowing about all problems and proposed resolutions.

- Initiating plant betterment proposals.

- Reviewing design changes for maintainability and operability.

i Action Plan 3.4.2.1 Identi fy current status of development, and plans for future development, of system engineering functions.'

~ Address each of the MAC proposed responsibilities for further management review.

O l

MAC Recommendation 3.4.3 Supplement training on plant systems and administrative controls for the system engineers, shift engineers and STA's.

Action Plan 3.4.3.1 Identify current status of training, by groups addressed, and plans for future training for further magagement rediew.

Recommend additional training, as appropriate.

O t..

,,e~_,...y,-

.,,.,--,,_,,,y

_.,_...,.._,,g,

.mv.c,.

- -,, - _e

's MAC Recorriendation

' O 3.4.4 Provide qualified: shift engineers for all shifts to provide better support.

Action Plan 3.4.4.1 Implement manning of qualified shift engineers for all shifts.

3.5 MAINTENANCE MAC Recommendation

_O 3.5.1 Integrate Startup Maintenance into Station Maintenance to:

resolve the responsibility and accountability issue; take advantage of resources, systems and organizational units of both organizations; and, to improve maintenance planning and execution.

Action Plan 3.5.1.1 Carry on with the present schedule for transition and integration into a single maintenance organization under Station responsibility O

_4_c,---

--. -,_~-,

-c.-r--,r..-rw.---,---.*r-w,-g.w-,--,-c,--%,

+

~

L i

(lI is~

0 ll 6'

MAC Recommendation

]

dfl

<g

_-3.5.2 Consider integrating Instrument and Control (I&C) Maintenance into 3.

-l'2 j Station Maintenance to provide improved activity planning and v

coordination.

,. g

.f P

.I

'e Action Plan

]. <

l

. l, j

3.5.2.1 Describe how I&C Maint,ena,nce would be integrated with Station Maintenance and evaluate pro ! and con issues involved.

Provide a, j

'i l

' separate evaluation for I&C Engineering.

1 q

3.5.2'2 Re' view evaluations, make' recommendations and obtain approval s, and

'f implement approved plan.

j, 7

.i -

I'.

1

,1 t

i i, f MAC decommendation

_., ;g i

.[-

iP e

3.513

. Complete development of an integrated maintenanca. management

+

I i

,u.-

.c,

- information system as soon as possible.

l

-/

<r, If.'

b Ac+.1on Pian l

li l

!l i

3

~

q.5'.3.1 ; Comprqte implementation of PPMIS.

/; ' ;' f.

f g-

.r

'/

O 1

l l

f' 24;

,p 1

at s

l' 3

me" '

4.0 SAFETY REVIEW O

U-MAC Recommendation 4.1 Require the Onsite Review Committee (0SRC) to assume more oversight i

in reviewing plant activities, schedules and operations for regulatory compliance and safety significance.

Action Plan 4.1.1 Provide listing of OSRC meetings for S023 to date (e.g., monthly Technical Specification and other special topic).

O.

4.1.2 Based on review of material developed in 4.1.1, develop additional

criteria, as appropriate, for involvement of OSRC in plant i

acti viti es.

MAC Recommendation i

4.2 Emphasize and strengthen requirements for Nuclear Safety Group (NSG)

I to provide management with an overall assessment of plant safety.

!O

t 1. - - _,

Action Plan 4.2.1 Review the format of the NSG monthly report and the NSG Nuclear Control Board presentations and revise the contents as necessary to provide an overall assessment of plant safety.

Obtain management concurrence in the suggested fo mat.

4.2.2 Implement the approved format in subsequent reports and presentations.

MAC Recommendation 4.3 Establish a

formal system for follov.;

and closecut of recommendations submitted by the Independent Safety Engineering Group (ISEG) and NSG.

Action Plan e

i' 4.3.1 Visibility of the status of NSG and ISEG recommendations will be enhanced by use of the NE&O Commitment Register (NEOCR) system.

Input sheets were forwarded to the NE0CR coordinator on June 8,

1983.

The next NEOCR report is expected to include these items.

I t

i,

MAC Recommendation

~

4.4 Improve communications and interaction between the NSG and Station by clarifying the roles and requiring NSG to spend more time at the site.

Action Plan 4.4.1 The NSG Supervisor will examine future work assignments and endeavor to structure the work to optimize interaction with the site.

4.4.2 Periodically report to management regarding amount of time spent by the group working at the site..

n w

5. 0,

QUALITY ASSURANCE MAC Recommendation 5.1 QA must monitor and assure performance of the line organization by providing timely information to the Vice President, NE&0.

The current reporting system should be reviewed to determine if adequate emphasis is being communicated to upper management of needed corrective actions and or untimely delay of response to Nonconformance Reports (NCRs) and Corrective Action Reports (CARS).

Problems should be reported in a manner which highlights the more important issues.

O

4 Action Plan O

I 5.1.1 The Quality Assurance Organization (QA0) initiated, in April 1983, a monthly "QA Concerns" Program report, in addition to the existing l

. Quarterly Management

Report, which identifies quality problems requiring management visibility.

The monthly report supplements the i

quarterly Report to Senior Management, and identifies problems, as deemed by the QAO, which require special management attention such as

(

recent or potential Stop Work Orders and recurring problems shown to i

be adverse to safety.

The Quarterly Management Report will include an attachment, listing overdue Corrective Action Requests and open

(

Nonconformance Reports issued to SCE organizations.

The report will i

also include graphical trend analyses and detailed assessments of known or suspected causes of CAR deficiencies.

The report will be addressed to the responsible Vice Presidents.,

5.1. 7.

Periodic QA meetings will be scheduled to address items identified in the

Monthly, Quarterly and corresponding followup reports.

Attendance will be solicited from:

I Manager of Nuclear Operations Manager, Station Manager, Project Unit 1 Manager, Project Units 2 and 3 The highlights of previous reports and progress toward solutions will be discussed at these meetings.

Status escalation to the Vice Presidential level will occur as necessary to assure that appropriate actions have the proper visibility for adequate completion.

5.1.3 A revised QA CAR Procedure N16.03 Revision 11 has been issued to strengthen the program.

The improved program implements the February 1983 recommendations of the NUS Audit on QA effectiveness by providing a "close loop provision" in the CAR resolution process.

The " closed loop" aspect begins with routine monthly meetings, effective July 1,1983, with the Supervisor to Supervisor, Manager to Manager or escalated to the Vice President to Vice President level after 90 days delinquency to candidly ascertain the cause and provide

an immediate "get-well-plan" on late CAR.,

responses and/or corresponding implementation actions.

5.1.4 At the request and with the cooperation of Sation Management, a program to prioritize CAR significance with respect to " potential nuclear safety ha za rds_" will be developed.

QA0 will assess CAR deficiencies which potentially have safety significance by so noting the assessment in the CAR transmittal correspondence.

This will flag to the Station that special attention appears warranted.

%) t

5.1.5 Additionally, the CAR program will be modi fied to require, on a q

prioriti zed

basis, timely notification of the appropriate Vice President for CAR's representing potential nuclear safety hazards and needed corrective actions.

Delays in responses to CAR's and Nonconformance Reports (NCR's) will also be included in this noti fication.

6.0 PROJECT ENGINEERING MAC Recommendation 6.1 One SCE organization should have primary and overall responsit,ility for design changes throughout the anticipated long-term retrofit

,G work.

Assign responsibility for the adequacy of plant design to q)

Project Engineering and communicate this to appropriate organizations.

Action Plan 6.1.1 Prepare a list of design change categories to be expected during future plant operation, e.g.,

component changes at one end of the spectrum and whole system changes at the other.

6.1.2 Prepare criteria for each design change category and recommend to NE&O and E&G Management which should be assigned to Engineering &

Construction and which will be assigned to Station Technical.,

6.1.3 Project and Station Technical will jointly develop design change procedures consistent with the approach approved - in 6.1.2 above.

These procedures will address the extent of review and level of approval by the respective organizations.

6.1.4 Integrate the results of these action items into the policy statement of Item 6.5.1.

MAC Recommendation 6.2 Assign assistant project engineers within Project Engineering and define their functions and responsibilities in conjunction with those of Station Technical to ensure compatibility of functions and establish appropriate interfaces.

Action Plan 6.2.1 Review and update the listing of Project Engineering functions, responsibilities, authority and interfaces.

6.2.2 Based on 6.2.1, develop an organization plan to handle functions, responsibilities, authority, and interfaces.

O._ ___ _

6.2.3

. Review the organizational plan with interfacing organizations and AU obtain concurrence to insure compatibility and agreement.

6.2.4 Prepare jurisdiction and responsibility statements for Project Engineers and Discipline Group Leaders which clearly define each 4

position, scope of responsibility and interfaces.

i 6.2.5 Based on 6.2.4, review and update performance expectations for each Project Engineer.

MAC Recommendation O

6.3 Assess the work load, duty assignments and staffing for the onsite Project Engineering function to datermine how best to improve its ability to meet performance expectations.

Action Plan 6.3.1 Review and update functions, responsibilities, authority, and l

interfaces of the onsite Project Engineering Site Representative and discipline personnel under his direction.

l O 1,

_ - _. _.. ~.. _, _ -.. _

d e

6.3.2 Prepare a listing of types of quantity of work items handled onsite.

O 6.3.3 Based on 6.3.1 and 6.3.2, develop criteria to establish division of responsibility between onsite and home office E&C engineering personnel.

6.3.4 Develop a set of generic performance expectations for onsite personnel based on project and station needs.

6.3.5 Based on the work load for a

given period and performance expectations (6.3.4), develop criteria to determine the number of personnel required onsite.

O MAC Recommendation 9

6.4 Clarify the rol es of Project Engineering and Station Technical functions by establishing responsibilities of

each, defining compatible goals and objetives and by working to a common set of priorities.

-e

,,,,..----,s.

-,,r-

,r,-

-,~,-,----.,,w-,--

- - -, - - -, ~,. - - - - -,. - - - -,, + -

-re,--rg.-

Action Plan 4

0 6.4.1 Identi fy existing responsibilities, goals and objectives, and priorities of Station Technical (i.e., Chemistry, I&C, STA's, etc.)

and propose revised jurisdiction statements, goals, oojectives and priorities, if appropriate.

6.4.2 Prepare a matrix of functions, responsibilities, authority, and interfaces for E&C and NEa0 Engineering Organizations.

6.4.3 Compare the matrix with regulatory requirements and SCE Company

policies, and establish roles for each organization for each p)
function, responsibility, authority, and interface identified in u

6.4.2.

6.4.4 Establish a joint agreement between E&C and NE&O within the constraints of the requirements developed in 6.4.3 to eliminate redundancy or overlap in functions, responsibilities, authority and interfaces.

6.4.5 Develop and implement a priority system which addresses station and project objectives within the constraints of personnel and fiscal resources necessary to di scharge the division of responsibility established in 6.4.4

6.4.6 Prepare and implement a joint Management Policy statement which O

defines functions, responsibilities and authority for the ESC engineering and Station Technical organizations.

The Policy Statement shall prescribe remedies for disputes.

MAC Recommendation 6.5 Establish long-term roles for Project Engineering and Station Technical which are consistent with policies for role of Station and Project support functions.

Action Plan 6.5.1 Prepare and implement a joint E&C and NE&O Management Policy Statement which defines the roles and responsibilities of Project Engineering and Station Technical based on input from Items 6.1.4 and 6.4.6.

6.5.2 Implement changes identified in 6.4.1 above, as approved.

O 7.0 CONFIGURATION MANAGEMENT

,U

~

MAC Recommendation 7.1 Complete efforts underway to update the Master Equipment List (MEL).

This work should be given a high priority.

Action Plan 7.1.1 Implement program to provide a complete and up-to-date MEL.

t MAC Recommendation O

v 7.2 Assign high priority to completing tne review of the temporary modifications and to performing the necessary engineering and safety evaluations of those changes considered permanent.

Establish an administrative control process for temporary modi fications that clearly define conditions for their utilization.

Action P1an 7.2.1 Complete the revi ew of outstanding temporary modi fications and develop a schedule for implementation of permanent changes.

-w,,--,,,.~,.-.-..

7.2.2 Complete updating the temporary modification

program, including incorporation of INPO criteria.

Resolve ISEG comments on the program.

7.2.3 Resolve all temporary modifications which involve compliance with regulatory requirements.

?

)

h MAC Recommendations a

7.3 Review Station and Project design change control procedures to assure compatability.

These procesures should clearly define the functions and responsibilities of each.

The effort should build upon the work recently completed by the Configuration Task Group for Unit 1.

O Action Plan 1

7.3.1 Perform and document the results of the recommended review, including any clarification of functions and responsibilities which may be indicated.

Provide discussion of the relationship to referenced work P

S at S01.

~

j 7.3.2 Upon revision of Station design change control procedures, review and revise E&C QA Procedures and Test Instructions as necessary to assure compatibility.

O MAC Recommendation-O 7.4 Immediate training and clarification on the use of existing procedures should be provided to those Station and Project staff personnel who are involved with design activities.

I Action Plan 7.4.1 Provide a status of training on use of existing procedures for Station personnel for management review.

Implement additional training if required for purposes of clarification.

~

7.4.2 Project staff personnel involved with design change activities have received training on the use of applicable procedures.

E&C QA Procedure E&C 41-1-2, " Quality Assurance Training for NE&O and E&C Personnel" will be implemented for future training as required.

MAC Recommendation 7.5 Consider establishing a

change management function to

review, prioritize and approve all requests for changes in plant configuration.

O

\\

~

l i

Action Plan The effort to develop a system to manage plant modifications was initiated.. December 1982.

The following action plan identifies the i

major milestones and the target dates for remaining activities.

7.5.1 Identify work categories and priority level s.

J 7.5.2 Prepare a change management policy statement and implementing procedures.

7.5.3 Secure NE&O Management approval and issue policy and procedures.

O 1

MAC Recommendation 7.6 Develop an integrated configuration status reporting system which serves the needs of both Project and Station for tracking the status of plant change requests and plant modi fication packages (SPR's, PFC's, DCP's temporary modifications).

O t

0,

Action Plan O

7.6.1 Identify and evaluate the existing process and reporting tools for plant modi fication s/ change s,

i.e.,

SPR's, DCP's, Temporary Modifications.

)

7.6.2 Determine the visibility and status requirements of key Project and Station personnel.

7.6.3 Prepare a detailed implementation schedule defining dates for process devel opment, report generation and tracking document integration.

(

MAC Recommendation 7.7 Resolve the problems associated with corporate document management providing timely copies of requested documents.

Action Plan 7.7.1 Evaluate enhancements of CDM support that can be made in the interest of timeliness and submit recommendacions.

Implement recommendations, as approved.

l

'O

_40_

8,0 TRAINING R

V MAC Recommendation 8.1 Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.

Action Plan 8.1.1 Describe the existing network for interface between the Station and training and assess its effectiveness.

Arrange for a meeting.to discuss this, and schedule regular interface meetings with planned agenda.

O MAC Recommendation 8.2 Improve training program effectiveness in the areas of supervisory training and management development.

Action Plan 8.2.1 Issue a memo identifying current SCE programs available in 'the areas of supervisory training and management development.

8.2.2 Include in personnel development planning extensive use of available programs.

O 9.0 ORGANIZATION STRUCTURE, POLICIES AND PROCEDURES MAC Recommendation 9.1 Perform a complete review of functions and clarify responsibilities and accountabilities, eliminating gaps and overlap.

This should be done with the objective of streamlining the organization.

Specific emphasis should be placed on the Station organization and its interfaces with other organizations related to SONGS, such as Nuclear Engineering, Safety and Licensing, Project and Quality Assurance.

Action Plan 9.1.1 Review jurisdiction statements for functions reporting to managers and revise as appropriate.

Accomplish inter.-organization review of these jurisdiction statements to insure gaps and overlaps are minimized within NE&0.

9.1.2 Subject the jurisdiction statements produced in 9.1.1 to interdepartment review and revise as necessa ry.

i i

I l.

l

\\-

l 42-l l _

MAC Recor:nendation 9.2 Develop top level administrative control procedures which include programmatic commitments, management policies and organizational responsibilities and interfaces.

I i

Action Plan 9.2.1 Prepare an NE&O Policy Statement for management approval which sets forth the hierarchical relationship of all such procedures and provides clarification regarding organizational interfaces.

Q MAC Recommendation 9.3 Establish a clear plan and hierarchy for administrative control procedures.

Top level administrative control procedures should establish requirements for procedures and instructions by the implementing organizations.

The plan should address interfacing of

(

procedures among implementing organizations.

Action Plan 9.3.1

. Refer to action given in Section 9.2.1.

9.3.2 Prepare detailed plan for the development of the station programmatic procedures concept and obtain management approval.

s 43-t

9.3.3 Implement the programmatic procedures concept.

mU

~

MAC Recommendation 9.4 Establish a control process that tracks regulatory requirements and commitments from their source to the implementing procedures.

Action Plan 9.4.1 Evaluate the extent to which the Configuration Control Program will meet this recommendation.

Identify addicional measures that would be required, if any.

MAC Recommendation P

9.5 Much use can be made of the material currently existing in procedures.

However, it is strongly recommended that existing procedures be reviewed for inconsistencies and gaps.

Action Plan

}

9.5.1 Describe current procedure review programs and policies.

Obtain input from each section for this, in order to provide a complete picture for management review.

44-

9.5.2 Based on the results of this review, implement additional actions, as necessary.

10.0 ORGANIZATIONAL COMMUNICATIONS MAC Recommendations 10.1 Evaluate the need for additional regularly scheduled meetings with key managers of the SONGS-related organizations to improve communication of general and specific issues, review of commitments, coordination of efforts and planning.

Address key interface areas, such as:

- Key managers of NE&O and QA

- Station managers Action Plan i

10.1.1 Conduct regularly scheduled monthly meetings with key managers of NE&0.

10.1.2 As required, conduct special meetings with key managers of NE&O and other appropriate Departments to review plans for major activities such as refueling or retrofit outages.

O a

45-

10.1.3 Encourage regularly scheduled staff meetings within the organizations

~

within NEa0.

MAC Recommendations 10.2 Senior and middle management should communicate clearly to thei r subordinates the need for initiating individual face-to-face communications.

Action Plan 10.2.1 Discourage writing of unnecessary letters and encourage face-to-face communications within the Department.

O MAC Recommendations 10.3 Emphasize team building to improve coordination and problem solving among key organizational units.

2 4

Action Plan a

10.3.1 Emphasize a team building approach in the meetings to be conducted in the action plan for recommendations 10.1.

10.3.2 Encourage team building efforts such as the CSI meeting being conducted for the action plan for recommendations 2.1 witnin the V

Department when appropriate.

46-

.c APPENDIX 1

\\

CATEGORIZATION OF MAJOR RECOMMENDATIONS WITH SPECIFIC RECOMMENDATIONS MAJOR RECOMMENDATION - Reaffirm that safety and compliance take precedence in any conflict with schedule objectives.

Specific recommendations 2.1 Management must continue to reinforce to SONGS personnel at all levels that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant.

This reinforcement should occur in all formal and informal communications.

- ~

i i

MAJOR RECOMMENDATIO4 - Clearly establish that the Station is the lead organization.

. Specific recommendations I

2.2 Management must take action to establish the Station as the lead t

. SONGS organization and specifically identify that the Station is f

responsible for resolving conflicts between safety and compliance l

and the power ascension schedule.

( _

i I

O 3.3.2 For the long term, this function should include outage planning'

%/

and management responsibility.

This will establish the Station in the lead outage role.

Project work during operation and outages would be integrated into the overall Station plan and schedule.

f I

7.5 Consider establishing a change management function to review, prioritize and approve all requests for changes in plant configuration.

MAJOR RECOMMENDATION - Integrate qualified Project personnel into the Station Organization.

(O V'

' Specific recommendations 3.1.1 Make maximum use of qualified Project personnel (also processes and systems) to -infuse plant knowledge and experience into the Station organization.

3.1.2 Establish development plans for each manager and supervisor.

Such plans should identi fy specific managerial strengths and weaknesses and establish priorities and target dates for improvement.

4 -.

MAJOR RECOMMEN0ATION - Improve conditions in the control room area, focusing especially upon congestion, di stractions,

communications and system operability status information.

Specific recommendations i

3.2.1 Although much has already been done to relieve the shift crew from distractions, more should be done.

Make significant physical improvements in the shift supervisor's office to allow him to function better.

It should be determined why the operators do not make significant use of the plant computer.

A study should be conducted of control room area activities and appropriate improvements implemented.

O

^'

3.2.2 Action should be taken to ensure that the snift supervisors get out into the plant regularly.

This could be in ' conjunction with training periods, but it should also come at times when they can interact with equipment operators and other people on their own shifts.

3.2.3 The control room area study recommended above should include evaluation of development of a system operability status display process.

Current system operability status should be readily available to the operators.

The evaluation should also consider communication of plant and system status to interfacing organizations and people.

t

}>^~~

q

~

~

~

~.,

A, ip p

3.2.4 The operators will benefi t< greatl'y from O

improv;ments in plant e

scheduling the work coordination -as identified in the following Work Management section.

3.2.5 Make available to the operators a well-defined list of contacts, such as systems engineers for times when they need information or assistance.

y.S

- o e,

.. n,

3.2.6 The Technical Specifications should be reviewed for improvements w..

and reduction in complexity.

~

. +

e

-M g

'g 3.2.7 Make a joint effort, working with the system, engineers, to v

improve operations procedure'sNand reduce-repeat' proced;iral mistakes.

7-j s

3.4.2 Complete the development bf the system engineer'ing functio l1;wisich)'

\\

%N has recently been initi.ated.

DeGine the fudctions -9ad

'g g.

v responsibilities.

System engineers should be, full,y knowledgeable L

z about the design and (Uncticfr Of

  • their assigned systems and s

components.

These system engineers should be ' responsibl e for

+

maximizing the performance of their systems.

,To d,o this, they need a

sense of commi tmeq t'.

'bc Systems ' eggineer(+should x

responsible for providing technjr31 support to station l Operators,, #

(

7 v

v maintenance and other personnel.s.;Speci fic re p nsibilities should include:

~

e c,

\\

o r

u

.4.

3 N

N.

,s

.c

_.N.

L_

J

._Mp

. (q o ISI testing.

s o Knowing, reviewing and improving the operating procedures and technical specifications.

o Being a point of contact on any problem or question related to questions, test, maintenance and modification.

o Knowing the system operability status, o Knowing about all problems and proposed resolutions.

l

~o Initiating plant betterment proposals.

o Reviewing design changes for maintainability and operability.

3.4.4 Provide qualified shift engineers for all shifts to provide

,;\\

p

% better support.

Assia riigh priority to compietiag the O,

7.2 review of tne tempocery

.;j modi fica,tions and to performing the necessary engineering and

,sdfety evaluations of those changes considered permanent.

-e Establish an administrative

. trol process for temporary

., n '

inodifications that cl early define condi tions for their

.., s e,

, "ut i l i za ti o n.

, Is.h l

T-s l

MAJOR RECOMMENDATIOil

, Complete development in specific areas of the Station b

3 1

! Technical support function.

L k

l c

T g=-

.~

, ~

I L

w

..y/ Jh,

.. Y h\\/ h !

z

^,7 \\[, ^

< g 7 ^ --' '

^

^ - - -

l 6

,, (

,i

.t f.

1; l,/

. I,. {,.,;

7 i

f' i

Specific recommendations i

!,i r?

r 3.4.1 Define goals and objectives for Station Technical.

i II+

w;f 3.4.2 Complete the development of the system engineering function which

,/

'4

,g'has recently been initiated.

Define the functions and e

)

i

/

re'sponsibilities.

System engineers should be fully knowledgeable p

is about the design and function oftheir assigned systems and l

T components.

These system engineers should be responsible for V

maximizing the performance of their systems.

To do this, they J '_

n,,

~4

/

i-need a sense of commitment.

Systems engineers should be

+

responsible for providing technical support to station operators, s

> maintenance and other ' personnel. ' l Speci f fe. respcnsibilities 1

1 O

/'

saould iaci"de:

o ISI testing.

o Knowing, reviewing and improving the operating procedures and t

/,

technical specifications.

o Being a point of contact on any problem or question related to r

y operations, test, maintena1ce and. modification.

>a o Knowing the system operability status, o Knowing about all problems and proposed resolutions.

o Initiating plant' betterment proposals.

o Reviewing design chan'ges for maintainability and operability.

O.-. _

_ - ~

J 3.4.3 Supplement training on plant systems and administrative controls for the system engineers, shift engineers and STA's.

i 3.4.4 Provide qualified shift engineers for all shifts to provide better support.

6.1 One SCE organization should have primary and overall j

responsibility for design changes throughout the anticipated long-term retrofit work.

Assign responsibility for the adequacy of plant design to Project Engineering and communicate this to appropriate organizations.

J 6.2 Assign assistant project engineers within Project Engineering and O

deftae their foactioas ead resPoasidiiities ia coa;unctioa with those of Station Technical to ensure compatibility of functions and establish appropriate interfaces.

6.3 Assess the work load, duty assignments and staf fing for the onsite Project Engineering function to determine how best to improve its ability to meet performance expectations.

i 1

i 6.4 Clarify the roles of Project Engineering and Station Technical i

functions by establishing responsibilities of eacn, defining compatible goals and objectives and by working to a common set of priorities.

O t '

6.5 Establish long-term roles for Project Engineering and Station

-,(b Technical which are consistent with policies for role of Station and Project support functions.

Establish a Station work management function to MAJOR RECOMMENDATION coordinate all work activities.

Specific recommendations 3.2.4 The operators will benefit greatly from improvements in plant scheduling and work coordination as identified in the following Work Management section.

]

3.3.1 Develop a work management function responsible for planning and coordinating maintenance,

ISI, surveillance
testing, design change modifications and outages.

This function should be a continuous, all-shift effort with a

strong, full-time work manager who reports directly to the Station manager.

3.3.2 For the long tarm, this function should include outage planning and management respoisibility.

This will establish the Station in the lead outage role.

Project work during operation and l

outages would be integrated into the overall Station plan and schedule.

/~'N i !

i i

3.3.3 Develop a management information system to support the work and outage planning function.

Interim processes will have to be used until this system is developed.

MAJOR RECOMMENDATION - Integrate Start-up Maintenance into Station Maintenance.

Specific recommendations i

3.5.1 Integrate Start-up Maintenance into Station Maintenance to:

resolve the responsiblity and accountability issue; take advantage of resources, systems and organizational units of both organizations; and to improve maintenance planning and execution.

O 3 5 2 coa =' der iate9eatia9 4astr== eat ead coatroi

('ac) =eiate"eace into -St'ation Maintenance to provide improved activity planning and coordination.

3.5.3 Complete development of an integrated maintenance management information system as soon as possible.

MAJOR RECOMMENDATION - Improve the reporting of compliance issues by the safety review and quality assurance functions.

Also improve the tracking and timeliness of corective action taken in response to these issues.

4

)

O 4

_g.

Specific recommendations 4.1 Require the Onsite Review Committee (0SRC) to assume a more oversight in reviewing plant activities, schedulet and operations i

for regulatory compliance and safety significance.

4.2 Emphasize and strengthen requircments for Nuclear Safety Group

-(NSG) to provide management with an overall assessment of plant safety.

4.3 Establish a

formal system for follow-up and closeout of recommendations submitted by the Independent Safety Engineering l

Group (ISEG) and NSG.

l l O 4.4 Improve communications and interaction between NSG and Station by

. +

clarifying the roles and requiri~ng NSG to spend more time at the site.

8 MAJOR RECOMtENDATION - Develop top level policies and administrative control f

procedures which define and clari fy the functions, responsibilities and i

j-accountabilities of SONGS-related organizations, i

(

Specific recommendations 7.1 Complete efforts underway to update the master equipment list.

This work should be given a high priority.

, j l.

1 7.3 Review Station and Project design change control procedures to assure compatibility.

These procedures should clearly define the functions and responsibilities of each.

The effort should build upon the work recently completed by the Configuration Task Group f

for Unit 1.

i j

7.4 Immediate training and clarification on the use of existing 4

procedures should be provided to those Station and Project staff i

personnel who are involved with design change activities.

7.5 Consider establishing a change management function to review, prioritize and approve all requests for changes in plant configuration.

O 7.6 Develop an integrated configuration status reporting system which serves the needs of both Project and Station for tracking the status of plant change requests and plant modification packages (SPR's, PFC's, DCP's temporary modifications).

8.1 Establish regular meetings between Station and Nuclear Training 4

management to assess training needs and effectiveness.

4 9.1 Perform a

complete review of functions and clari fy responsibilities and accountabilities, eliminating gaps and i

overlap. This should be done with the objective of streamlining

O

,y_

_ ~.-,.

,,..,,y

,y _

,-,,.,_,,.._.~,,,_,.m____~.-m,

_y.,_

Q the organization.

Specific emphasis should be placed on the Station organization and its interfaces with other organizations related to S0ftGS,

such as Nuclear Er.gineering, Safety and Licensing, Project and Quality Assurance.

9.2 Develop top level administrative control procedures which include programmatic commitments, management policies and organizational responsibilities and interfaces.

9.3 Establish a clear plan and hierarchy for administrative control procedures.

Top level administrative control procedures should establish requirements for procedures and instructions by the implementing organizations.

The plan should address interfccing of procedures ar..ong implement 1.:q organizations.

t 9.4 Establish a control process that tracks regulatory requirements 4

and commitments from their source to the implementing procedures.

9.5 Much use can be made of the material currently existing in procedures.

However, it is strongly recommended that existing procedures be reviewed for inconsistencies and gaps.

O -

MAJOR RECOINEllDATI0il -

Improve consnunications between and within 50flGS O

organizations.

l l

Specific recommendations 3.3.3 Develop a management information system to support the work and j

outage planning function.

Interim processes will have to be used i

until this system is developed.

[

3.5.3 Complete development of an integrated maintenance management information system as soon as possible.

i 4.4 Improve communications and interaction between NSG and Station by O

cier4ry4#9 the roies e#8 requicia9 aso to snead more time et tae l

site.

~

i 5.1 QA must monitor.and assure performance of the line organization j

by providing timely information to the Vice President, NE&0.

The current reporting system should be reviewed to determine if i

i adequate emphasis is being communicated to upper management of I

l needed corrective actions and of untime.ly delay of response to I

l Non-Conformance Reports (NCR's) and Corrective Action Reports l

(CAR's).

Problems should be reported in a

manner which l

highlights the 'nore important issues.

1 O

I......., _ -.. ~.... ~ _ _ _,.. _, -. _

,m

d 7.7 Resolve the problems associated with corporate document I

management providing timely copies of requested documents.

8.1 Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.

10.2 Senior and middle management should communicate clearly to their subordinates the need for initiating individual face-to-face communications.

I j

10.3 Emphasize team building to improve coordination and problem solving among key organizational units.

1 i

~ ~

JGH:8296 i

4 i

h i

O

-la-

d APPENDIX II 8

G G

RECOMMENDATIUNS FOR IMPROVEMENT OF THE OPERATION OF SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2 AND 3 8

Prepared For SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Rosemead, California 91770 1

H June 3,1983 Management Analysis Company Project Number: MAC-83-UO 26 Southern California Edison Comoany Contract Numbe. : $4200221 e

u.

ZL OVERVIEW s

In March and April 1983, in response to a request from Southern California Edison Company (SCE), Management Analysis Company (MAC) performed a inanagement diag-nostic to assist SCE in identifying ways to improve operation of San Onofre Nuclear Generating Station (SONGS) Units 2 and 3. In performing the evaluation, MAC conducted over 90 interviews, reviewed many documents and made a number of on-site cbser-vations. This report identifies recommendations for improvement resulting from the evaluation.

Unit 2's power ascension program has experienced a number of unscheduled delays.

Further, issues concerning regulatory compliance developed and eventually resulted in a Nuclear Regulatory Commission (NRC) enforcement meeting on March 7,1983.

We identified a number of factors which contributed to that situation. One major factor

~

Q has been the late staffing of the Unit 2 and 3 Station organization resulting in a lac'< of

~'

significant participation in the start-up program by Station personne!. Though this factor is mainly historical, it will require positive action by SCE management to reduce residual e f fects.

Fcrtunately, SCE has a committed and dedicated staff willing to invest the effort required to implement the positive actions required. A number of actions have been taken, including the full-time commitment of an executive vice president to address and remedy problems. In addition, the request for a full power operating license for Unit 3 has been deferred to allow primary focus on Unit 2 activities.

We identified eight principal problems during our evaluation. They are:

A significant level of maintenance. and design change activities were going on at the e

same time as the power ascension testing. Prior to March 1983, the two units were 8

being brougnt to power with a relatively short time separation between them. When combined, these factors have had a negative impact on the power ascension program.

p Tne control room is a restraint to p! ant activity. In view of this and the above. :"e V

operators of the station we.e having difficulty in efficiently handling the demsncs being made upon them.

en=

b,

-i-

a The basic framework of the Station organization (the infrastructure) is relatively e

new, yet it must function like a well established organization.

A natural conflict has develcped between the Project's schedule orientation and the g

e

.L3 Station's safety and compliance orientation during the transition to firm cperation.

Identification, reporting and resolution of compliance issues need improvement.

e The organizations which support SONGS activities are large and complex with e

unclear responsibilities and accountabilities.

Administrative control procedures are numerous, complex and inefficient.

e There are communications problems among and within SONGS organizations.

e In our report, we have made recommendations which deal with these problems in various ways. Our major recommendations are to:

Continue to reinforce that safety and compliance take precedence in any conflict e

with schedule objectives.

Clearly establish that the Station is the lead organization responsible for resolving e

conflicts between compliance and schedule.

Integrate qualified Project perscnnel inio the Station organization.

e F

Improve conditions in the control room area, focusing especially upon congestion, e

distractions, communications and system operability status information.

e Complete development in soecific areas of the Station Technical support function.

Establish a Station work management function to coordinate all work activities.

e Integrate Start-up Maintenance into Station Maintenance.

e Improve the reporting of comoliance issues by the safety review and cuality assurance functions. Also improve the tracking and timeliness of corrective a:ticn taken in resocnse to these issues.

Develop top level pclicies and administrattve contro! procedures which define and e

clarify the functions, responsibilities and acccuntabilities of SONGS-rela:ed organizations.

Improve communications between and within SONGS organizations.

e Development and implementation of soecific action plans by SCE management addrening the MAC recommendations should result in improved performance in the coeration of g

SONGS.

G A

m-m.

TABLE OF CONTENTS Section Pace C'V E R V I E W.............................................

-i-1.0 I NT R O D UCT I O N........................................

I 2.0 ORGANIZATICN 08JECTIVES AND PRIORITIES............

2 2

3.0 STATION 5

2 3.1 Station Management 3

3.2 Operations A

3.3 Work Management 3.4 Station Technical 5

3.5 Maintenance 6

4.0 SAFETY REVIEW 6

5.0 CUALITY ASSURANCE 7

6.0 PROJECT ENGINEEP,ING 7

7.0 CONFIGURATION MANAGEMENT 8

8.0 TRAINING 9

9.0 ORGANIZATION STRUCTURE, POLICIES AND PROCEDURES 9

10.0 ORGANIZATIONAL COMMUNICATIONS....................

10 a

sic 4

i 11 Ik W

'9

.L;{

-111 -

.J.,

503 -!

1.0 INTRODUCTION

W Southern California Edison Company (SCE) has been an operating nuclear utility since 1968 when San Onofre Nuclear Generating Station (SONGS) Unit I was declared commercial.

In 1970, SCE announced the construction of SONGS Units 2 and 3 and in 1973 was granted a construction permit. SONGS Unit 2 is only the sixth unit to be granted a full power operating license since the Three Mile Island incident in 1979.

5 Unit 2 was loaded with fuel in February 1982 and is currently in power ascension testing. Unit 3 was loaded with fuel in November 1982. The request for a full power operating license for Unit 3 has been deferred in order to focus on Unit 2 activities.

Unit 2's power ascension program has experienced schedule delays, including problems with the Nuc' ear Steam-Supply System (NSSS) and the Balance of

]

Plant (BOP).

Issues concerning regulatory compliance developed and eventually resulted in a Nuclear Regulatory Commission (NRC) enforcement meeting on March 7,1983.

Because of this, SCE retained Management Analysis Company (MAC) to perform a management diagnostic. The objectives of the diagnostic were:

I Review and appraisal of the start-up, power ascension and initial operation e

activities associated with SONGS Units 2 and 3. Rather than attempting to examine every ascect of the entire station, the effort focused on specific processes and interaction among the Engineerint,, Construction, Start-up, Operations and Quality Assurance (CA) organizations. Particular attention was given to activities associated with safety and regulatory compliance.

g e

Determination of the key factors adversely affecting start-up, power El ascension, initial operation and associated management systems.

In conjunction with key SCE personnel, development of recommendations

=

that will assist them in improving performance, with emphasis upon current safety and compliance issues.

lf oV l

5c82-3 MAC assembled a team of senior, experienced personnel to conduct a series of interviews, observations and document reviews.

This team consisted of professionals with significant experience in project management, operations management, QA, organizational development and human behavior.

I We interviewed more than 90 people in SCE, NRC, Bechtel, Combustion Engineering and other contractor organizations and reviewed associated i

documentation.

Based on our evaluation, the following recommendatic7s for improvement are made.

I 2.0 ORGANIZATION OBJECTIVES AND PRIORITIES We assessed SCE's objectives and priorities for SONGS to determine how these objectives and priorities were addressed at various levels within the company.

I Recommendations 2.1 Management must continue to reinforce to SONGS personnel at all levels,that safety and compliance are the first priority in executing their duties in support of the power ascension program and operation of the plant. This reinforcement should occur in all formal and informal communications.

I 2.2 Management must take action to establish the Station as the lead SONGS organization and specifically identify that the Station is responsible for resolving conflicts between safety and compliance and the power ascension schedule.

i I 3.0

. STATION 3.1 STATION MANAGEMENT We assessed the role of Station management in placing the units into cperation.

p

.6 il!

5084-3.

)

Recommendations 3.1.1 Make maximum use of oualified Project personnel (also processes and systems) to infuse plant knowledge and experience into the Station organi.:ation.

3.1.2 Establish development plans for each manager and supervisor. Such plans should identify specific managerial strengths and weaknesses and establish priorities and target dates for improvement.

3.2 OPERATIONS We co!1ected information on operations from a cross section of the organization, including Start-up and the operators themselves.

A number cf positive actions have already helped the shift operations team to function more effectively. Among these are:

Posting someone to better control access to the control room e

Implementation of an equipnnnt control function o

Slowdown of Unit 3 e

Additional shift overlap e

B Addition of. clerical and other help to the shift crew e

I Recommendations 3.2.1 Although much has already been done to relieve the shift crew from distractions, more should be done. Make significant physical imprcvements in the shift supervisor's office to allow him to function Jetter.

It should be I

determined why the operators do not make significant use of the plant computer. A study should be conducted of control room area activities and appropriate improvements implemented.

3.2.2 Action should be taken to ensure that the shift supervisors get out into the p; ant regularly. This could be in conjunction with training periods, but it shcu!d als

')

come at times when they can interact with equipment operators and other people on their own shif ts.

i E__.__

SM l

l

I 1

3CE4-3

,O 3.2.3 The control room area study recommended above should include evaluation of development of a system operability status display process. Current system operability status should be readily available to the operators. The evaluation should als consider communication of plant and system status to interfacing organizations and people.

3.2.4 The operators will benefit greatly from improvements in plant scheduling and work coordination as identified in the following Work Management section.

3.2.5 Make available to the ope' ators a well-defined list of contacts, such as systems engineers for times when they need information or assistance.

3.2.6 The Technical Specifications should be reviewed for improvements and reductions in complexity.

3.2.7 Make a joint effort, working with the systems engineers, to improve operations I

procedures and reduce repeat procedural mistakes.

3.3' WORK MANAGEMENT We assessed the station work activities to evaluate the impact on operations.

Recommendations 3.3.1 Develop a work mtnagement. function responsible for planning and coordinating maintenance, ISI, surveillance testing, design change modifications and outages. This function should be a continuous, all-shift effort with a strong, full-time work manager who reports directly to the Station manager.

3.3.2 For the long term, this function should include outage planning and management responsibility. This will establish the Station :n the lead outage role. Project work during operation and outages would be integrated into th'e overall Station plan and schedule.

3.3.3 Develop a management information system to succort the work and cutage

( ~'

planning function. Interim processes will have to be used until this system is developed.

y m=

5CEe-3 3.4 STATION TECHNICAL O

We assessed Station Technical management, its functions and its pecple, to increase our understanding of their roles and how effectively these roles are being carried out.

Recommendations 3.4.1 Define goals and objectives for Stati n Technical.

3.4.2 Complete the development of the system engineering function which has recently been initiated.

Define the functions and responsibilities.

System engineers should be fully knowledgeable about the design and function of their assigned systems and components. These system engineers should be responsible for maximizing the performance o'f their systems. To do this, they need a sense of commitment.

Systems engineers should be responsible for providing technical support to station operators, maintenance and other personnel.

Specific responsibilities should include:

ISI testing.

ist n e

g 1._/

Knowing, reviewing and improving the operating procedures and technical e

specifications.

' E Being a point of centact on any problem or question related to operations, s

test, maintenance and modification.

Knowing the system operability status.

e Knowing about all problems and proposed resolutions.

e Initiating plant betterment proposals.

e Reviewing design changes for maintainability and coerability.

e 3.4.3 Supplement training on plant systems and administrative controls for the system engineers, shif t engineers and STAS.

3.4.4 Provide qualified shif t engineers for all shif ts to provide better support.

1 Y

Q Ms;

T 5033-3 6 3.5 MAINTENANCE We looked at the Start-up and Station Maintenance organizations with the E

objective of evaluating their roles and functions.

Recommendations 3.5.1 Integrate Start-up Maintenance into Station Maintenance to:

resolve the B

responsibility and accountability issue; take advantage of resources, systems and organizational units of both organizations; and, to improve maintenance planning and execution.

i I

3.5.2 Consider integrating instrument and control (I&C) maintenance into Station Maintenance to provide improved activity planning and coordination.

3.5.3 Complete development of an integrated maintenance management information system as soon as possible.

I')

~

4.0 SAFETY REVIEW We assessed both the on-site and of f-site safety review functions to determine the degree of their effectiveness.

Recommendations I

4.1 Require the On-Site Review Committee (OSRC) to assume more oversight in reviewing plant activities, schedules and operations for regulatory compliance a

ar.d safety significance.

4.2 Emphasize and strengthen requirements for Nuclear Safety Grcuo (NSG) to provice management with an overall assessment of plant safety.

4.3 Establish a formal system for follow-up and closecut of recommendations submitted by the Independent Safety Engineering Group (ISEC) and NSG.

4.4 Improve communications and interaction between NSG and Station by clarifying i(,)\\

the roles and requiring NSG to sper d more time at the site.

(

l nc=

Y 50Sa-?

-7

.d 5.0 QUALITY ASSURANCE We assessed the QA function to develep an undarstanding of its role in relatien to station activities.

Recommendation 5.1 QA must monitor and assure performance of the line organization by providing timely information to the Vice President, NE&O. The current reporting system should be reviewed to determine if adequate emphasis is being communicated to upper management of needed corrective actions and of untimely delay of response to Non-Conformance Reports (NCRs) and Corrective Action Reports (CARS). Problems should be reported in a manner which highlights the more important issues.

6.0 PROJECT ENGINEERING We assessed the Project Engineering function to develop an understanding of its l

role in relation to Station activities.

g6 Recommendations 6.1 One SCE organization should have primary and overall responsibility for design changes throughout the anticipated long-term retrofit work. Assign responsibil-E ity for the adequacy of plant design to Project Engineering and communicate this to appropriate organizations.

6.2 Assign assistant project engineers within Project Engineering and define their i

functions and responsibilities in conjunction with these of Station Technical to ensure ecmpatibility of functions and establish aapropriate interfaces. -

6.3 Assess the work lead, duty assignments and staffing for the on-site Project Engineering function to determine how best to improve its ability to meet performance expectations.

6.4 Clarify the roles of Project Engineering and Station Technical functions by

/]

establishing responsibilities of each, defining comoatib!c goals and Objectives v-(

and by working to a commen set of priorities.

1.5 En==

5084-3

-a.

6.5 Establish long-term roles for Project Engineering and Station Technical which are consistent with policies for role of Station and Project support functions.

7.0 CGNFIGURATION MANAGEMENT Ed We reviewed selected areas relating to configuration identificatien, change control and status information reporting.

Recommendations 7.1 Complete efforts underway to update the master eculpment list. This work should be given a high priority.

7.2 Assign high priority to completing the review of the temporary modifications and' to performing the necessary engineering and safety evaluations of those changes considered permanent. Establish an administrative control process for temporary modifications that clearly define conditions for their utilization.

C) 7.3 Review Station and Project design change control procedures to assure compatibility.

These procedures should clearly define the functions and responsibilities of each.

The effort should build upon the work recently completed by the Configuration Task Group for Unit 1.

7.4 Immediate training and clarification on the use of existing procedures should be provided to those Station and Project staff personnel who are involved with design change activities.

7.5 Consider establishing a change management function to review, prioritize end appruve all requests for changes in plant configuration.

I 7.6 Develop an integrated configuration status reporting system which serves the needs of both Project and Station for tracking the status of plant cha.ge 3

requests and plant modification packages (SPRs, PFCs, DCPs temporary modifications).

7

%/

c-_ _ __

Liu

5084-3

~9' 7.7 Resolve the problems associated with corporate document management I

providing timely copies of requested documents.

I 8.0 TRAINING The nuclear training function was assessed to develop an understanding of its support of the Station staff.

Recommendations 8.1 Establish regular meetings between Station and Nuclear Training management to assess training needs and effectiveness.

0.2 Improve training program effectiveness in the areas of supervisory training and i

management development.

9.0 ORGANIZATION STRUCTURE. POLICIES AND PROCEDURES A review was made of the SCNGS-related organizational structure and the way

}I

~

that responsibilities, commitments and policies are communicated to 3

organizational elements.

Recommendations i

9.1 Perform a complete review of functions and clarify responsibilities and accountabilities, eliminating gaps and overlap. This should be done with the objective of streamlining the organization. Specific emphasis should be placed on the Station organization and its interfaces with other organizations related I

to SONGS, such as Nuclear Engineering, Safety and Licensing, Project and 1

Quality Assurance.

B 9.2 '

Develop top level administrative control procedures which include pregram-matic commitments, management pc!icies and organizational responsibilities y

and interfaces.

o 9.3 Establish a clear plan and hierarchy for acministrative control procedures. Too l

level administrative. control procedures should establish requirements - for procedures and instructions by the implementing organizations. The plan should t

address interfacing of procedures among implementing organizations.

i m

E t We

__._-._._,_.,_..___,_-m,_

m.

5084-3 t

)

9.4 Establish a control process that tracks regulatory requirements and commitments from their source to the implementing procedures.

R be made of the material currently existing in procedures.

9.5 Much use can However, it is strongly recommended that existing procedures be reviewed for inconsistencies and gaps.

r

,H 10.0 ORGANIZATIONAL COMMUNICATIONS We examined organizational contacts, interfaces and channels of communica-tion in order to understand how managers and supervisors commonly interact.

Recommendations 10.1 Evaluate the need for additional regularly scheduled meetings with key managers of the SONGS-related organizations to improve communication of general and specific issues, review of commitments, coordination of efforts and H

planning. Address key interface areas such as:

Key managers of NE&O and QA e

Station managers e

6 10.2 Senior and middle management should communicate clearly to their sub-ordinates the need for initiating individual face-to-face communications.

10.3 Emphasize team building to improve coordination and problem solving among key organizational units.

E a