ML20078N296: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:USNRC REmo,y -. | {{#Wiki_filter:[P3 USNRC REmo,y -. | ||
ggpf | ggpf ATlM a | ||
=cosa fit M W 7 R{h,5GiA5 83 MG 8 A9: 48 Florida Power C 0 A P 7 A ATION August 4, 1983 3F-0883-02 Mr. James P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N. W., Suite 2900 Atlanta, Ga. | |||
30303 | |||
==Subject:== | ==Subject:== | ||
| Line 23: | Line 25: | ||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
We have completed our commitment to redraw the existing Flow Diagrams (302 & 318 series) on a Computer Aided Dratting (CAD) system by placing all of the 302 and 318 series drawings in the computer, incorporating the installed modifications including the Refuel IV modifications, in-corporating the field verification walk-down markings, and issuing the up-to-date Flow Diagrams on 8/1/83. | We have completed our commitment to redraw the existing Flow Diagrams (302 & 318 series) on a Computer Aided Dratting (CAD) system by placing all of the 302 and 318 series drawings in the computer, incorporating the installed modifications including the Refuel IV modifications, in-corporating the field verification walk-down markings, and issuing the up-to-date Flow Diagrams on 8/1/83. | ||
Sincerely, s | Sincerely, s | ||
G. R. Westafer Manager Nuclear Licensing and Fuel Management EMG/feb 8310250458 830804 PDR ADOCK 05000302 G | G. R. Westafer Manager Nuclear Licensing and Fuel Management EMG/feb 8310250458 830804 PDR ADOCK 05000302 G | ||
PDR h | |||
%Eol General Office 3201 Thirty-fourtn streei soutn. P.O. Box 14042. St. Petersburg. Fionda 33733 e 813-866 5151}} | |||
Latest revision as of 00:19, 15 December 2024
| ML20078N296 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/04/1983 |
| From: | Westafer G FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 3F-0883-02, 3F-883-2, NUDOCS 8310250458 | |
| Download: ML20078N296 (1) | |
Text
[P3 USNRC REmo,y -.
ggpf ATlM a
=cosa fit M W 7 R{h,5GiA5 83 MG 8 A9: 48 Florida Power C 0 A P 7 A ATION August 4, 1983 3F-0883-02 Mr. James P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N. W., Suite 2900 Atlanta, Ga.
30303
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. OPR-72 NRC Inspection Report 82-11 Redraw of Flow Diagrams on CAD
Dear Mr. O'Reilly:
We have completed our commitment to redraw the existing Flow Diagrams (302 & 318 series) on a Computer Aided Dratting (CAD) system by placing all of the 302 and 318 series drawings in the computer, incorporating the installed modifications including the Refuel IV modifications, in-corporating the field verification walk-down markings, and issuing the up-to-date Flow Diagrams on 8/1/83.
Sincerely, s
G. R. Westafer Manager Nuclear Licensing and Fuel Management EMG/feb 8310250458 830804 PDR ADOCK 05000302 G
PDR h
%Eol General Office 3201 Thirty-fourtn streei soutn. P.O. Box 14042. St. Petersburg. Fionda 33733 e 813-866 5151