NIAGARA M0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of December 1983 with a monthly availability factor of 100.0% and a not design electrical capacity factor (DER) of 96.7%. Reduction in capacity factor was due to power reduction for control rod maneuvering on December 2 and again on December 24. | NIAGARA M0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of December 1983 with a monthly availability factor of 100.0% and a not design electrical capacity factor (DER) of 96.7%. Reduction in capacity factor was due to power reduction for control rod maneuvering on December 2 and again on December 24. | ||
CLASS I WORK - INSTRUMENTATION 6 CONTROL - DECEMBER 1983 WR #23312 | CLASS I WORK - INSTRUMENTATION 6 CONTROL - DECEMBER 1983 WR #23312 | ||
#12 Inst. Air. Compresor blowing air out. Relief continuously. | |||
(Removed and cleaned unloading solencid U1) | (Removed and cleaned unloading solencid U1) | ||
CLASS I WORK - MAINTENANCE - DECEMBER 1983 KR #23759 - FW sys. seismic restraint 50-SC installed nut on restraint | CLASS I WORK - MAINTENANCE - DECEMBER 1983 KR #23759 - FW sys. seismic restraint 50-SC installed nut on restraint | ||
#24192 - liigh pressure turbine instrument taps - furmanite leak | |||
'#23864 - #112 RilDT level SW valve - furmanite valve - 12/8/83 | |||
#23788 - Diesel Generator #102 coolant leak at sight glass - retaped connection | |||
#23983 - Zone 41 west control room' door - latch sticks - replaced bolts | |||
#23233 - CRD 38-27 accumulator - replaced packing 6 "0" ring | |||
#23294 - Condensate transfer pump #12 oil leakage at sight glass. Drained oil and rechecked sight glass. | |||
#23313_- CRD 06-39 accumulator foot valve - replaced teflon rings and packing | |||
#23247.- Scram outlet valve CRD 06-39 replaced seat, teflon rings, gaskets, packing. | |||
#20067 - Door #39 from I6C Shop into Control Room - replaced screws | |||
#23314 - CRD 06-39 foot valve - packing | |||
#23104 - Ilanger #29-R1a - tightened loose nut | |||
#23316 - Scram outlet valve on CRD #06-39 leaks - re-tightened packing gland | |||
#23105 - Steel pipe clamp hanger 29-11 tighten nuts. | |||
CLASS I WORK - ELECTRICAL MAINTENANCE - DECEMBER 1983 N1-MST-M1 - 125 VDC batteries, cell specific gravities and battery voltage M0 2131 - Rx. prot, sys. MG set alarms MO 3411 - Core spray /rx. head vent valve logic mod. | CLASS I WORK - ELECTRICAL MAINTENANCE - DECEMBER 1983 N1-MST-M1 - 125 VDC batteries, cell specific gravities and battery voltage M0 2131 - Rx. prot, sys. MG set alarms MO 3411 - Core spray /rx. head vent valve logic mod. | ||
8401170007 831231 | |||
~ | |||
PDR ADOCK 05000220 R | |||
PDR J | |||
~. | |||
i AVER 4GE is4lLY L*Ngy row gg Lgygt | i AVER 4GE is4lLY L*Ngy row gg Lgygt DOCKET NO. | ||
50-220 UNIT 9 Mi16 Pt. 1 DATE I/9/84 CO.\\tPLETED BY Roman k | |||
TELErilONE _ (315)'349-2422 klONTH De.c. 1983 DAY AVERAGE DAILY FOWER LEVEL, DAY t.\\lWe Neti AVERACE DAILY FOWER LEVEL (MWe Neti 3 | |||
613' 17 612 2 | |||
DAY AVERAGE DAILY FOWER LEVEL, | 597 611 3 | ||
612 2 | 444 19 613 4 | ||
560 20 610 5 | |||
613 4 | 607 3 | ||
S | 597 6 | ||
10 | 609 22 600 7 | ||
610 | 613 23 609 - | ||
2- | S 613 74 ag 9 | ||
611 25 606 - | |||
10 013 26 610 l | |||
613 | 13 612 2-611 12 611 | ||
- ' ~ | |||
613 | |||
607 IS | :s n.. | ||
..,. g3.. - | |||
the nearest winele rne;ssesse | 34 613 30 607 IS 613 3 | ||
592 33 613 INSTRUCTIONS On tinis format. hst the averare daily unit p..wcr lesci in Mwe.Nc l'or e.seh day in the sep..eien. | |||
the nearest winele rne;ssesse. | |||
5 t | 5 t | ||
i VII~~ s | i VII~~ s | ||
it | it t | ||
i; | i; h | ||
~ | |||
li UNITSilUTDOWNS AND POWER REDUC | e li UNITSilUTDOWNS AND POWER REDUC 110NSit DOCKETNO. _ 50-220 l} | ||
TELEPilONE | UNITNAME 9 Mi1e Pt- #1 I | ||
(d DATE 1/0 N REPORT MONTil - | |||
U. | Dec. 1983 COMEERD BY W hm MI- | ||
'+ | |||
II c | 8-TELEPilONE m n 319 5422 su U. | ||
"L II c | |||
es 5 ta 3 j | |||
t | |||
~ | |||
c35 | C yo. | ||
* N0 | 1)aie g | ||
je y.! 'f Licensee Es | |||
12/2/83 | ,E% | ||
Lpl(ed reduction to 70'i, Ctp to pull | 2, p | ||
f{uxshapingcontrolrods. | e@ | ||
83-7 | M | ||
.2 3 oc Event u? | |||
g1 l:: | |||
Cause & Curreenive c35 sIe j di g Report | |||
* N0 Action to yb i | |||
Prevent Recurrence c5 k | |||
6,; | |||
h-8306 12/2/83 S | |||
54.5 11 1 | |||
Lpl(ed reduction to 70'i, Ctp to pull f{uxshapingcontrolrods. | |||
F: Forced | 83-7 12/24/83 S | ||
3 | 32 11 1 | ||
Load reduction to 67*6 ctp to. pull flux shaping control rods. | |||
~ | |||
'.' I a;. | |||
It r | |||
E Operator Training & l. ice nse Examination 4 Olher (Explaisi) | c. | ||
~ | |||
G Operallunal Eino (Emplein) | *a e | ||
19/77) | I" Js i | ||
Exhibii;l Same Source 1,- | I 2 | ||
s-F: Forced Reason: | |||
4 j | |||
hk | 3 S: Scheduled Method: | ||
A Equipment Failore(Explain) h Exhible:C. Instructions I | |||
v. | |||
B Maintenance of Test 1 Manual l,'i | |||
'for Preparation of Dans C Refueling 2 Manual Scram. | |||
j Entry Shecis for Licensee | |||
,D Regulatory Restrieiluo 3 Automatic Scram, q, | |||
. Event Report (LER) File INUREC. | |||
9f l | |||
E Operator Training & l. ice nse Examination 4 Olher (Explaisi) 0161)1 | |||
.! } | |||
F Administrative G Operallunal Eino (Emplein) 5 j | |||
'.s 19/77) | |||
Il Other (Explain) | |||
Exhibii;l Same Source 0 h 1,- | |||
! i | |||
} | |||
i jQ t. | |||
hk i | |||
' '~ ' | |||
: - -%2f ' | : - -%2f ' | ||
u- - | |||
e I' | ~' | ||
O."ER ATING DATA REPORT DOCKET NO. | e | ||
: l. Unit Name: | - am-. ~ ;p ?- | ||
I' O."ER ATING DATA REPORT 50-220 DOCKET NO. - | |||
DATE 1/#/04 COAlPLETED BY " K0"lih Ob TELEPliONE (315)349-2422 OPER 4 TING STATUS | |||
: 3. Licensed ThennalPower(SIWt): | : l. Unit Name: | ||
: 4. Nameplate Rating (Gross AlWe): | 9 Mile. Point tinit 1 N*''' | ||
'. Reporting Period: | |||
12/1/83-12/31/83 | |||
: 3. Licensed ThennalPower(SIWt): | |||
1850 640 | |||
: 4. Nameplate Rating (Gross AlWe): | |||
000 | 000 | ||
: 5. Desi;n Electriest Rating (Net AlWe): | : 5. Desi;n Electriest Rating (Net AlWe): | ||
: 6. Sfaximuin Dependable Capacity (Gross AlWe)L - | : 6. Sfaximuin Dependable Capacity (Gross AlWe)L - | ||
620 | |||
-[.:--- | |||
'.-- 7. 3fa.iisiviicD'eiEidNjMMl7(hY&iM%f2 * | |||
,,,~' _ | |||
g | |||
S. If Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since Last Report.Give Reasons: | '2 ' | ||
~~ | |||
^ | |||
~ | |||
S. If Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since Last Report.Give Reasons: | |||
: 9. Power Level To which Restricted,If Any(Net A!We): | : 9. Power Level To which Restricted,If Any(Net A!We): | ||
: 10. Reasons For Restrictions.lf Any: | : 10. Reasons For Restrictions.lf Any: | ||
s | s This >!onth Yr to.Date Cumulatise | ||
This >!onth | ) | ||
) | II. Hours in neportin; Period 744 8760 124,176.2 | ||
: 12. Number Of Hours Reactor Was Critical | |||
#44 499a.4 60,au1.7 | |||
: 12. Number Of Hours Reactor Was Critical | : 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2 | ||
: 13. Reactor Reserve Shutdown Hours | : 14. Hourt Generatur On Line 744 4925.8 83,488.3 | ||
: 14. Hourt Generatur On Line | : 15. Unit Re>erve Shu:de,wn Hours 0.0 0.0 0.0 | ||
: 15. Unit Re>erve Shu:de,wn Hours | : 16. Cross Therma! Energy Canerated (.\\lWH) 1.348,852.0 8,720,050.0 138,094,440.0 | ||
: 16. Cross Therma! Energy Canerated (.\lWH) | : 17. Cross Electrical Energy Generated (SlWH) 459 2,83,.,0 2,888,691.0 45,631,781.0 IS. Net Electrics: r.ner;y Generated (31% H) 446,043.0 2,802,108.0 44,194,759.0 100.0 56.2 6/.2 | ||
: 17. Cross Electrical Energy Generated (SlWH) | : 19. Unit Seruce r:cior | ||
: 20. Ure *,v:!':t" r- :,,r 100.0 do.4 oi.2 | |||
6/.2 | : 21. Ur.:: Cap.i:s Facsur (Usin; AIDC Nee, 96.6 52.4 58.3 | ||
: 20. Ure *,v:!':t" | : 22. Cni Capacity Factor (Using DER Net) 96 7 51.6 - | ||
: 21. Ur.:: Cap.i:s Facsur (Usin; AIDC Nee, | 57.4 i | ||
: 23. Unit Forced Outage Race 0.0 4a.6 l/.4 | |||
: 22. Cni Capacity Factor (Using DER Net) | |||
: 23. Unit Forced Outage Race | |||
: 24. Shutdowns Scheduled Oser Ne.se 6 Alonths eType. Date,an.r* Di.ratian of Eacht: | : 24. Shutdowns Scheduled Oser Ne.se 6 Alonths eType. Date,an.r* Di.ratian of Eacht: | ||
Biennial refuel f, overhaul March 15, 1984 - 8 weeks | Biennial refuel f, overhaul March 15, 1984 - 8 weeks | ||
: 25. If Shur 'Diewn At End Of Report Period. Estnuated Date of Startup. | : 25. If Shur 'Diewn At End Of Report Period. Estnuated Date of Startup. | ||
: 26. Uniss in Tes Status (Prior in Commercial Oper:stic'il Forceast | : 26. Uniss in Tes Status (Prior in Commercial Oper:stic'il Forceast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY CO\\l\\lCRCI\\L OPER g tos | ||
m com , | ~ | ||
m com, | |||
NMP-7759 NIAGARA MOHAWK POWER CORPORATION NIAGARA | |||
' MOHAWK 300 ERIE SOULEVARD. WEST SYR ACUSE. N. Y.13202 January 10, 1984 Director 0ffice of Inspection and Enforcement U.S. Nacicar Reguldory Commission k'ashington, ' DC 20555 | |||
- ATTN.: Document and Controi Desh Re: Docket No. 50-220 DPR - 63 | |||
==Dear Sir,== | ==Dear Sir,== | ||
Subnitted herewith is the Report af Operating Statistics and Shutdown Experience for December 1983 for the Nine Mile Point Nuclear-Station Unit M1 Also included is a narrative report of Operating Experience for- | Subnitted herewith is the Report af Operating Statistics and Shutdown Experience for December 1983 for the Nine Mile Point Nuclear-Station Unit M1 Also included is a narrative report of Operating Experience for- | ||
. December 1983. | |||
Sincerely, 14L Thomas E. Lempges | Sincerely, 14L f | ||
Vice President Nuclear Generation TEL/jm Attachments cc: Director, Office of ISE (10 copies) | Thomas E. Lempges Vice President Nuclear Generation TEL/jm Attachments cc: Director, Office of ISE (10 copies) | ||
I h | I; h | ||
se | m se e | ||
, ~, | |||
,r- | |||
,,e-n-n | |||
,.--e-,~ | |||
,wm | |||
----e---}} | |||
Latest revision as of 23:47, 14 December 2024
| ML20079D977 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/31/1983 |
| From: | Lempges T, Roman T NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NMP-7759, NUDOCS 8401170007 | |
| Download: ML20079D977 (5) | |
Text
m 6 '
NIAGARA M0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of December 1983 with a monthly availability factor of 100.0% and a not design electrical capacity factor (DER) of 96.7%. Reduction in capacity factor was due to power reduction for control rod maneuvering on December 2 and again on December 24.
CLASS I WORK - INSTRUMENTATION 6 CONTROL - DECEMBER 1983 WR #23312
- 12 Inst. Air. Compresor blowing air out. Relief continuously.
(Removed and cleaned unloading solencid U1)
CLASS I WORK - MAINTENANCE - DECEMBER 1983 KR #23759 - FW sys. seismic restraint 50-SC installed nut on restraint
- 24192 - liigh pressure turbine instrument taps - furmanite leak
'#23864 - #112 RilDT level SW valve - furmanite valve - 12/8/83
- 23788 - Diesel Generator #102 coolant leak at sight glass - retaped connection
- 23983 - Zone 41 west control room' door - latch sticks - replaced bolts
- 23233 - CRD 38-27 accumulator - replaced packing 6 "0" ring
- 23294 - Condensate transfer pump #12 oil leakage at sight glass. Drained oil and rechecked sight glass.
- 23313_- CRD 06-39 accumulator foot valve - replaced teflon rings and packing
- 20067 - Door #39 from I6C Shop into Control Room - replaced screws
- 23314 - CRD 06-39 foot valve - packing
- 23104 - Ilanger #29-R1a - tightened loose nut
- 23105 - Steel pipe clamp hanger 29-11 tighten nuts.
CLASS I WORK - ELECTRICAL MAINTENANCE - DECEMBER 1983 N1-MST-M1 - 125 VDC batteries, cell specific gravities and battery voltage M0 2131 - Rx. prot, sys. MG set alarms MO 3411 - Core spray /rx. head vent valve logic mod.
8401170007 831231
~
PDR ADOCK 05000220 R
PDR J
~.
i AVER 4GE is4lLY L*Ngy row gg Lgygt DOCKET NO.
50-220 UNIT 9 Mi16 Pt. 1 DATE I/9/84 CO.\\tPLETED BY Roman k
TELErilONE _ (315)'349-2422 klONTH De.c. 1983 DAY AVERAGE DAILY FOWER LEVEL, DAY t.\\lWe Neti AVERACE DAILY FOWER LEVEL (MWe Neti 3
613' 17 612 2
597 611 3
444 19 613 4
560 20 610 5
607 3
597 6
609 22 600 7
613 23 609 -
S 613 74 ag 9
611 25 606 -
10 013 26 610 l
13 612 2-611 12 611
- ' ~
613
- s n..
..,. g3.. -
34 613 30 607 IS 613 3
592 33 613 INSTRUCTIONS On tinis format. hst the averare daily unit p..wcr lesci in Mwe.Nc l'or e.seh day in the sep..eien.
the nearest winele rne;ssesse.
5 t
i VII~~ s
it t
i; h
~
e li UNITSilUTDOWNS AND POWER REDUC 110NSit DOCKETNO. _ 50-220 l}
UNITNAME 9 Mi1e Pt- #1 I
(d DATE 1/0 N REPORT MONTil -
Dec. 1983 COMEERD BY W hm MI-
'+
8-TELEPilONE m n 319 5422 su U.
"L II c
es 5 ta 3 j
t
~
C yo.
1)aie g
je y.! 'f Licensee Es
,E%
2, p
e@
M
.2 3 oc Event u?
g1 l::
Cause & Curreenive c35 sIe j di g Report
- N0 Action to yb i
Prevent Recurrence c5 k
6,;
h-8306 12/2/83 S
54.5 11 1
Lpl(ed reduction to 70'i, Ctp to pull f{uxshapingcontrolrods.
83-7 12/24/83 S
32 11 1
Load reduction to 67*6 ctp to. pull flux shaping control rods.
~
'.' I a;.
It r
c.
~
- a e
I" Js i
I 2
s-F: Forced Reason:
4 j
3 S: Scheduled Method:
A Equipment Failore(Explain) h Exhible:C. Instructions I
v.
B Maintenance of Test 1 Manual l,'i
'for Preparation of Dans C Refueling 2 Manual Scram.
j Entry Shecis for Licensee
,D Regulatory Restrieiluo 3 Automatic Scram, q,
. Event Report (LER) File INUREC.
9f l
E Operator Training & l. ice nse Examination 4 Olher (Explaisi) 0161)1
.! }
F Administrative G Operallunal Eino (Emplein) 5 j
'.s 19/77)
Il Other (Explain)
Exhibii;l Same Source 0 h 1,-
! i
}
i jQ t.
hk i
' '~ '
- - -%2f '
u- -
~'
e
- am-. ~ ;p ?-
I' O."ER ATING DATA REPORT 50-220 DOCKET NO. -
DATE 1/#/04 COAlPLETED BY " K0"lih Ob TELEPliONE (315)349-2422 OPER 4 TING STATUS
- l. Unit Name:
9 Mile. Point tinit 1 N*
'. Reporting Period:
12/1/83-12/31/83
- 3. Licensed ThennalPower(SIWt):
1850 640
- 4. Nameplate Rating (Gross AlWe):
000
- 5. Desi;n Electriest Rating (Net AlWe):
- 6. Sfaximuin Dependable Capacity (Gross AlWe)L -
620
-[.:---
'.-- 7. 3fa.iisiviicD'eiEidNjMMl7(hY&iM%f2 *
,,,~' _
g
'2 '
~~
^
~
S. If Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To which Restricted,If Any(Net A!We):
- 10. Reasons For Restrictions.lf Any:
s This >!onth Yr to.Date Cumulatise
)
II. Hours in neportin; Period 744 8760 124,176.2
- 12. Number Of Hours Reactor Was Critical
- 44 499a.4 60,au1.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hourt Generatur On Line 744 4925.8 83,488.3
- 15. Unit Re>erve Shu:de,wn Hours 0.0 0.0 0.0
- 16. Cross Therma! Energy Canerated (.\\lWH) 1.348,852.0 8,720,050.0 138,094,440.0
- 17. Cross Electrical Energy Generated (SlWH) 459 2,83,.,0 2,888,691.0 45,631,781.0 IS. Net Electrics: r.ner;y Generated (31% H) 446,043.0 2,802,108.0 44,194,759.0 100.0 56.2 6/.2
- 19. Unit Seruce r:cior
- 20. Ure *,v:!':t" r- :,,r 100.0 do.4 oi.2
- 21. Ur.:: Cap.i:s Facsur (Usin; AIDC Nee, 96.6 52.4 58.3
- 22. Cni Capacity Factor (Using DER Net) 96 7 51.6 -
57.4 i
- 23. Unit Forced Outage Race 0.0 4a.6 l/.4
- 24. Shutdowns Scheduled Oser Ne.se 6 Alonths eType. Date,an.r* Di.ratian of Eacht:
Biennial refuel f, overhaul March 15, 1984 - 8 weeks
- 25. If Shur 'Diewn At End Of Report Period. Estnuated Date of Startup.
- 26. Uniss in Tes Status (Prior in Commercial Oper:stic'il Forceast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY CO\\l\\lCRCI\\L OPER g tos
~
m com,
NMP-7759 NIAGARA MOHAWK POWER CORPORATION NIAGARA
' MOHAWK 300 ERIE SOULEVARD. WEST SYR ACUSE. N. Y.13202 January 10, 1984 Director 0ffice of Inspection and Enforcement U.S. Nacicar Reguldory Commission k'ashington, ' DC 20555
- ATTN.: Document and Controi Desh Re: Docket No. 50-220 DPR - 63
Dear Sir,
Subnitted herewith is the Report af Operating Statistics and Shutdown Experience for December 1983 for the Nine Mile Point Nuclear-Station Unit M1 Also included is a narrative report of Operating Experience for-
. December 1983.
Sincerely, 14L f
Thomas E. Lempges Vice President Nuclear Generation TEL/jm Attachments cc: Director, Office of ISE (10 copies)