ML20080Q092: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20080Q092 | | number = ML20080Q092 | ||
| issue date = 08/04/1983 | | issue date = 08/04/1983 | ||
| title = Informs That Final Corrective Action Item Re Recovery Verification Team Assessment of QA Program & Implementation as Applied to Mechanical Equipment,Piping,Pipe Supports/ Restraints & HVAC Complete on 830718,per | | title = Informs That Final Corrective Action Item Re Recovery Verification Team Assessment of QA Program & Implementation as Applied to Mechanical Equipment,Piping,Pipe Supports/ Restraints & HVAC Complete on 830718,per | ||
| author name = Hall D | | author name = Hall D | ||
| author affiliation = ILLINOIS POWER CO. | | author affiliation = ILLINOIS POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 4250-1, 4250-L, U-10081, NUDOCS 8310120181 | | document report number = 4250-1, 4250-L, U-10081, NUDOCS 8310120181 | ||
| title reference date = 04-21-1982 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| Line 16: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Dm8 | {{#Wiki_filter:Dm8 4250"L | ||
/LL/NOIS POWER COMPANY j'jUF U-10081 CLINTON POWER STATION, P.O. BOX 678 CLINTON, ILLINOIS 61727 August 4, 1983 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 r | |||
==Reference:== | ==Reference:== | ||
IP Letter U-0468 W. C. Gerstner to J. G. Keppler dated 4/21/82 Subj ect: | IP Letter U-0468 W. C. Gerstner to J. G. Keppler dated 4/21/82 Subj ect: | ||
Recovery Verification Team | |||
==Dear Mr. Keppler:== | ==Dear Mr. Keppler:== | ||
As identified in the above referenced letter the Illinois Power (IP) Executive Vice President assembled a team of personnel to perform an overall assessment of the Quality Assurance Program and implementation as applied to mechanical equipment, piping, pipe supports / restraints and HVAC. | As identified in the above referenced letter the Illinois Power (IP) Executive Vice President assembled a team of personnel to perform an overall assessment of the Quality Assurance Program and implementation as applied to mechanical equipment, piping, pipe supports / restraints and HVAC. | ||
Concerns identified by the Verification Team were documented on the Verification Team Report Matrix. | Concerns identified by the Verification Team were documented on the Verification Team Report Matrix. | ||
Corrective action was established for each of the concerns and reviewed for adequacy by both Baldwin Associates Quality Assurance and Illinois Power Quality Assurance. | |||
The final Corrective Action item was re-viewed, accepted and approved for closure on July 18, 1983. | |||
This action completes this effort by IP to address potential program deficiencies. | This action completes this effort by IP to address potential program deficiencies. | ||
Sincerely , | Sincerely, | ||
D. P. Hall Vice President REC /jf cc: | D. P. Hall Vice President REC /jf cc: | ||
Director-Office of I&E USNRC | H. H. Livermore, Sr. Resident Inspector Manager-QA g0 Director-Office of I&E USNRC v | ||
Washington, DC 20555 Illinois Department of Nuclear Safety | |||
/ | |||
AUG08 gg 8310120181 830804 PDR ADOCK 05000461 A | |||
PDR}} | |||
Latest revision as of 08:47, 14 December 2024
| ML20080Q092 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 08/04/1983 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 4250-1, 4250-L, U-10081, NUDOCS 8310120181 | |
| Download: ML20080Q092 (1) | |
Text
Dm8 4250"L
/LL/NOIS POWER COMPANY j'jUF U-10081 CLINTON POWER STATION, P.O. BOX 678 CLINTON, ILLINOIS 61727 August 4, 1983 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 r
Reference:
IP Letter U-0468 W. C. Gerstner to J. G. Keppler dated 4/21/82 Subj ect:
Recovery Verification Team
Dear Mr. Keppler:
As identified in the above referenced letter the Illinois Power (IP) Executive Vice President assembled a team of personnel to perform an overall assessment of the Quality Assurance Program and implementation as applied to mechanical equipment, piping, pipe supports / restraints and HVAC.
Concerns identified by the Verification Team were documented on the Verification Team Report Matrix.
Corrective action was established for each of the concerns and reviewed for adequacy by both Baldwin Associates Quality Assurance and Illinois Power Quality Assurance.
The final Corrective Action item was re-viewed, accepted and approved for closure on July 18, 1983.
This action completes this effort by IP to address potential program deficiencies.
Sincerely,
D. P. Hall Vice President REC /jf cc:
H. H. Livermore, Sr. Resident Inspector Manager-QA g0 Director-Office of I&E USNRC v
Washington, DC 20555 Illinois Department of Nuclear Safety
/
AUG08 gg 8310120181 830804 PDR ADOCK 05000461 A