Dm8

/LL/NOIS POWER COMPANY 4250"L j'jUF U-10081 CLINTON POWER STATION, P.O. BOX 678 CLINTON, ILLINOIS 61727 August 4, 1983 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 r

Reference:

IP Letter U-0468 W. C. Gerstner to J. G. Keppler dated 4/21/82 Subj ect: Recovery Verification Team

Dear Mr. Keppler:

As identified in the above referenced letter the Illinois Power (IP) Executive Vice President assembled a team of personnel to perform an overall assessment of the Quality Assurance Program and implementation as applied to mechanical equipment, piping, pipe supports / restraints and HVAC.

Concerns identified by the Verification Team were documented on the Verification Team Report Matrix. Corrective action was established for each of the concerns and reviewed for adequacy by both Baldwin Associates Quality Assurance and Illinois Power Quality Assurance. The final Corrective Action item was re-viewed, accepted and approved for closure on July 18, 1983.

This action completes this effort by IP to address potential program deficiencies.

Sincerely ,

D. P. Hall Vice President REC /jf cc: H. H. Livermore , Sr. Resident Inspector Manager-QA g0 !

Director-Office of I&E USNRC v Washington, DC 20555 Illinois Department of Nuclear Safety  :..