ML20080U144: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~
{{#Wiki_filter:W'; _ {.
W'; _ {.
~
      .I
.I
                      ,t,
,t,
              ~7spT Telephone (412) 393-6000 P O Box 4 Shippingport. PA 15077-0004 r                                                                              March 7,1995                         ,
~7spT Telephone (412) 393-6000 P O Box 4 Shippingport. PA 15077-0004 March 7,1995 r
Beaver Valley Power Station g                                        Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooerating Reoort U. S. Nuclear Regulatory Commission                                                                   .
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 g
Document Control Desk                                                                                 :
Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooerating Reoort U. S. Nuclear Regulatory Commission Document Control Desk We.shington, D.C. 20555 Gentlemen:
We.shington, D.C. 20555 Gentlemen:
In accordance with Appendix A,
In accordance with Appendix A, Technical Specifications, the Monthly Operating Re rt is submitted for Unit 1 and Unit 2 for the month of February,199 .
Technical Specifications, the Monthly Operating Re rt is submitted for Unit 1 and Unit 2 for the month of February,199.
i Respectfully,                         li l
i Respectfully, i
                                                                          /             ;&. = =-)
/
T. P. Noonan                           i Division Vice President,               i Nuclear Operations /                   l Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA                                                                             ,
;&. = =-)
Q" ee    The Nuclear Professionals
T. P. Noonan Division Vice President, i
: b.                                                                                                     \ i 9503140247 950228 PDR R
Nuclear Operations /
ADOCK 05000334                                                             g\
Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA Q"
PDR                                                           T m
The Nuclear Professionals ee b.
i
\\
9503140247 950228 PDR ADOCK 05000334 g\\
R PDR T
m


p.
p.
1
1 1
      .                                                                                1 i
i NARRATIVE SutRRY OF MMHLY OPERATING EXPERIENCE INIT 1 1
NARRATIVE SutRRY OF                             !
FEBRLERY 1995 February 1
                    '.            MMHLY OPERATING EXPERIENCE INIT 1                                     1 l
'Ihe Unit began the turn.t period shutdown in Mode 6 for the through tenth refueling outage.
FEBRLERY 1995 February 1     'Ihe Unit began the turn.t period shutdown in Mode 6 for the through       tenth refueling outage.
February 11 February 12
February 11 February 12   'Ihe Unit entered Mode 5 at 1105 hours.
'Ihe Unit entered Mode 5 at 1105 hours.
Febtuary 13   'Ihe Unit remained in Mode 5 while preparations for entry into through       Mode 4 continued.
Febtuary 13
February 26 February 27   'Ihe Unit entered Mode 4 at 1730 hours and began preparations for entry into Mode 3.
'Ihe Unit remained in Mode 5 while preparations for entry into through Mode 4 continued.
February 28   'Ihe Unit entered Mode 3 at 2107 hours and remained in Mode 3 for the remainder of the r=ruit period.
February 26 February 27
'Ihe Unit entered Mode 4 at 1730 hours and began preparations for entry into Mode 3.
February 28
'Ihe Unit entered Mode 3 at 2107 hours and remained in Mode 3 for the remainder of the r=ruit period.
i I
i I
a I
a I


v,     . ,.                                                          .      . _
v, 3..
3..
' AVERAGE DAILY INIT POWER LEVEL DOGET NO.
                                        ' AVERAGE DAILY INIT POWER LEVEL DOGET NO.       50-334 INIT     BVPS thiit 1 DATE   Marc *1 1. 1995 L                                                               CXMPLETED BY       David T. Jones -
50-334 INIT BVPS thiit 1 DATE Marc *1 1. 1995 L
: f.                                                                   TELEPHONE       (412) 393-7553 M3fIH Fhavv 1995 DAY       AVERMIE DAILY POWER LEVEL           DAY         AVERAGE DAILY POWER LEVEL (We-Net)                                           (Mht-Net) 1                   0                       17                         0-2                   0'                       18                         0 3                   0                       19                         0           ,
CXMPLETED BY David T. Jones f.
4                   0                       20                         0 5                   0                       21                         0 6                   0                       22                       -0 7                   0                       23                         0 8                   0                       24                         0 9                   0                       25                         0           ;
TELEPHONE (412) 393-7553 M3fIH Fhavv 1995 DAY AVERMIE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net)
10                   0                       26                         0 11                   0                       27                         0 12                   0                       28.                       0 13                   0                       29                                     ,
(Mht-Net) 1 0
14                   0                       30 15                   0                       31 16                   0 INSDUCTICHS On this forin,   list the average daily unit power level We-Net for endt day in the reporting month. Oxpute to the nearest whole megawatt.
17 0-2 0'
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22
-0 7
0 23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28.
0 13 0
29 14 0
30 15 0
31 16 0
INSDUCTICHS On this forin, list the average daily unit power level We-Net for endt day in the reporting month. Oxpute to the nearest whole megawatt.


y   -
y y
y I
I OPERATING DATA REPORT DOCKET No.:
OPERATING DATA REPORT DOCKET No.:     50-334 REPORT DATE:   03/02/95             i COMPLETED BY: DAVID T. JONES         !
50-334 REPORT DATE:
TELEPHONE:     (412) 393-7553 OPERATING STATUS
03/02/95 i
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1       Notes
COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 OPERATING STATUS
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
: 2. REPORTING PERIOD: FEBRUARY 1995
: 2. REPORTING PERIOD: FEBRUARY 1995
: 3. LICENSED THERMAL POWER (MWt):               2652                                     ,
: 3. LICENSED THERMAL POWER (MWt):
: 4. NAMEPLATE RATING (Gross MWe):               923
2652
: 5. DESIGN ELECTRICAL RATING (Net MWe):         835
: 4. NAMEPLATE RATING (Gross MWe):
: 6. MAX DEPENDABLE CAPACITY (Gross MWe):         860
923
: 7. MAX. DEPENDABLE CAPACITY (Nat MWe):         810
: 5. DESIGN ELECTRICAL RATING (Net MWe):
835
: 6. MAX DEPENDABLE CAPACITY (Gross MWe):
860
: 7. MAX. DEPENDABLE CAPACITY (Nat MWe):
810
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):           None
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
: 10. REASONS FOR RESTRICTIONS, IF ANY:                             N/A THIS MONTH     YEAR TO DATE       CUMULATIVE
None
: 11. HOURS IN REPORTING PERIOD:                   672.0           1416.0       165072.0
: 10. REASONS FOR RESTRICTIONS, IF ANY:
: 12. NO OF HRS. REACTOR WAS CRITICAL:               0.0             48.7       106605.5
N/A THIS MONTH YEAR TO DATE CUMULATIVE
: 13. REACTOR RESERVE SHUTDOWN HOURS:               0.0             0.0           4482.8
: 11. HOURS IN REPORTING PERIOD:
: 14. HOURS GENERATOR WAS ON LINE:                   0.0             48,7       104586.4
672.0 1416.0 165072.0
: 15. UNIT RESERVE SHUTDOWN HOURS:                   0.0             0.0             0.0
: 12. NO OF HRS. REACTOR WAS CRITICAL:
: 16. GROSS THERMAL ENERGY GEN. (MWH):               0.0         72153.0     251399219.5   l
0.0 48.7 106605.5
: 17. GROSS ELECT, ENERGY GEN. (MWH):               0.0         23230.0       81049197.0
: 13. REACTOR RESERVE SHUTDOWN HOURS:
: 18. NET ELECTRICAL ENERGY GEN. (MWH):         -6300.0         10940.0       75734844.0
0.0 0.0 4482.8
: 19. UNIT SERVICE FACTOR: (PERCENT)                 0.0             3.4             65.2
: 14. HOURS GENERATOR WAS ON LINE:
: 20. UNIT AVAILABILITY FACTOR:(PERCENT)             0.0             3.4             65.2 4
0.0 48,7 104586.4
: 21. UNIT CAPACITY FACTOR (MDC): PCT               0.0             1.0             59.0
: 15. UNIT RESERVE SHUTDOWN HOURS:
: 22. UNIT CAPACITY FACTOR (DER): PCT               0.0             0.9             57.3
0.0 0.0 0.0
: 23. UNIT FORCED OUTAGE RATE: (PERCENT)             0.0             0.0             16.1 *
: 16. GROSS THERMAL ENERGY GEN. (MWH):
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):           \
0.0 72153.0 251399219.5 l
: 17. GROSS ELECT, ENERGY GEN. (MWH):
0.0 23230.0 81049197.0
: 18. NET ELECTRICAL ENERGY GEN. (MWH):
-6300.0 10940.0 75734844.0
: 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 3.4 65.2
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 3.4 65.2 4
: 21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 1.0 59.0
: 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.9 57.3
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.1
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
\\
THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS.
THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS.
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:         3/06/95
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
3/06/95
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST       ACHIEVED INITIAL CRITICALITY                 N/A           N/A INITIAL ELECTRICITY-                 N/A           N/A
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY-N/A N/A COMMERCIAL OPERATION N/A N/A f
,                            COMMERCIAL OPERATION                 N/A           N/A f
C
C


a-UNIT SNUTDOWNS AND POWER REDUCTIONS (t20%)                       ' Docket No. 50-334' Unit Name     SVPS Unit #1 Date' march 2. 1995 Completed By David T. Jones REPORT MONTN February 1995                             . Telephone         (4122 393-7553 *
a-UNIT SNUTDOWNS AND POWER REDUCTIONS (t20%)
                                                        . Method of       Licensee                                         Cause & Corrective       -
' Docket No.
Duration                   Shutting         Event     System   Component                       ' Action to-No. Date     Typel     (Nours)     Reason 2   Doun Reactor 3     Report 8     Code 4     Code 5                 . Prevent Recurrence 3   950201       S         672         C             4               N/A         RC       FUELXX     The Unit remained shutdoun for its tenth refueling outage.
50-334' Unit Name SVPS Unit #1 Date' march 2. 1995 Completed By David T. Jones REPORT MONTN February 1995
1               2                                               3                                     '4 F-Forced         Reason:                                         Method:                               Exhibit F-Instructions for S Scheduled     A-Equipment Failure (Emplain)                   1-Manuel                               Preparation of Data Entry Sheets a-Maintenance or Test                           2-Manuel Scree                         for Licensee Event Report (LER) File C-Refueling                                   3 Automatic Scram                       (NUREG0161).
. Telephone (4122 393-7553 *
D-Regulatory Restriction                       4 Cont'd. from Previous Month
. Method of Licensee Cause & Corrective Duration Shutting Event System Component
                    ~E -Operator Training & License Emma             5-Reduction                         5 F-AdelnistratIve-                               9-Other                               Exhibit N-Same Source.                           -
' Action to-No.
Date Typel (Nours)
Reason 2 Doun Reactor 3 Report 8 Code 4 Code 5
. Prevent Recurrence 3
950201 S
672 C
4 N/A RC FUELXX The Unit remained shutdoun for its tenth refueling outage.
1 2
3
'4 F-Forced Reason:
Method:
Exhibit F-Instructions for S Scheduled A-Equipment Failure (Emplain) 1-Manuel Preparation of Data Entry Sheets a-Maintenance or Test 2-Manuel Scree for Licensee Event Report (LER) File C-Refueling 3 Automatic Scram (NUREG0161).
D-Regulatory Restriction 4 Cont'd. from Previous Month
~ -Operator Training & License Emma 5-Reduction 5
E F-AdelnistratIve-9-Other Exhibit N-Same Source.
G-operational Error (Emplain)~
G-operational Error (Emplain)~
N-Other (Esplein)
N-Other (Esplein)


1 i
1 i
- e s 1
e s
1 NARRATIVE SGMARY OF
1 1
                    ,                            KNIELY OPERATING EXPERIDICE 1
NARRATIVE SGMARY OF KNIELY OPERATING EXPERIDICE 1
1 l
l LNIT 2 1
LNIT 2                                   ;
i FEBRUARY 1995 3
1 i
Fekruary 1
FEBRUARY 1995 3                                             ,
'Ihe unit operated at a ncaninal value of 100% cutput for the through entire i w t period.
I Fekruary 1             'Ihe unit operated at a ncaninal value of 100% cutput for the through               entire i w t period.
February 28 1
February 28                                                                               .
l a
1 l
4 i
a 4
b i
i b
l
i l
?
                                                                                                    ?
h I
h I
i 1
i 1
Line 120: Line 185:
h t
h t
i i
i i
                                                                                                - l.
- l.
      .            . .~. -     -    _ _ . .    .
..~. -


i   ..
i s
s                                                                                   ,
p 7
p     ..
e t
  , ,                                                                                        7 e
AVERAGE MILY INIT KMER LEVEL b
t
DOOGT NO.-
                      .,              AVERAGE MILY INIT KMER LEVEL                             '
50-412 LNIT BVPS Iktit 2 MTE Martf1 1. 1995 CD4PLETED BY David T.- Jonas 4
b DOOGT NO.-   50-412         -
TELEPH NE (412) 393-7553 6
LNIT   BVPS Iktit 2   ;
)ENIH WmW 1995 MY AVERAGE IRILY POWER IEVEL IRY AVERAGE MILY POWER LEVEL G"L %t)
MTE   Martf1 1. 1995 4
(PWe-Net) k 1
CD4PLETED BY   David T.- Jonas .
831 17 830 2
TELEPH NE   (412) 393-7553 !
833 18 828 3
6
836 19 827 4
          )ENIH WmW 1995 MY         AVERAGE IRILY POWER IEVEL           IRY         AVERAGE MILY POWER LEVEL G"L %t)                                           (PWe-Net)         k 1                 831                       17                     830 2                 833                       18                     828 3                 836                       19                     827           ,
836 20 827 i
4                  836                       20                     827           i 5                 838                       21                     833           f 6                 837                       22                     832           '
f 5
7                  837                       23                     823           i 8                 835                       24                     832           ,
838 21 833 6
9                  833                       25                     829 10                   630                       26                     829           !
837 22 832 7
11                   833                       27                     821 12                   834                       28                     825 13                   832                       29                                   .
837 23 823 i
14                   831                       30 15                   825                       31 16                   830                                                             ,
8 835 24 832 9
INS'IRUCTICNS                                                                       +
833 25 829 10 630 26 829 11 833 27 821 12 834 28 825 13 832 29 14 831 30 15 825 31 16 830 INS'IRUCTICNS
On this fcrm,     list the average daily unit power level PWe-Net for each day in the reparting month. Campute to the nearest whole megawatt.
+
On this fcrm, list the average daily unit power level PWe-Net for each day in the reparting month. Campute to the nearest whole megawatt.


y       _
y f.
: f.                                                                                                 ,
p l-1 F
p                                                                                                       :
^ -
l-                                                                                                     l 1
OPERATING DATA REPORT DOCKET No.:
F                      ^-             OPERATING DATA REPORT                                             l
50-412
                                                    .            DOCKET No.:     50-412               )
)
F.
F.
REPORT DATE: 03/02/95                 !
REPORT DATE: 03/02/95 COMPLETED BY: DAVID T. JONES E
E COMPLETED BY: DAVID T. JONES         .
TELEPHONE:
TELEPHONE:     (412) 393-7553 r, -
(412) 393-7553 r, -
OPERATING STATUS
OPERATING STATUS
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2         Notes
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
: 2. REPORTING PERIOD: FEBRUARY 1995
: 2. REPORTING PERIOD: FEBRUARY 1995
: 3. LICENSED THERMAL POWER (MWt):               2652
: 3. LICENSED THERMAL POWER (MWt):
: 4. NAMEPLATE RATING (Gross MWe):               923
2652
            .5. DESIGN ELECTRICAL RATING (Net MWe):         836
: 4. NAMEPLATE RATING (Gross MWe):
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):       870
923
: 7. MAX. DEPENDABLE CAPACITY (Net MWe):         820
.5. DESIGN ELECTRICAL RATING (Net MWe):
            ~ 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
836
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
: 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
~ 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
f
f
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):           None
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
: 10. REASONS FOR RESTRICTIONS, IF ANY:                             N/A THIS MONTH     YEAR TO DATE       CUMUIATIVE
None
: 11. HOURS IN REPORTING PERIOD:                   672.0           1416.0         63855.0
: 10. REASONS FOR RESTRICTIONS, IF ANY:
: 12. NO. OF HRS. REACTOR WAS CRITICAL:             672.0           1416.0         55240.5-
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
: 13. REACTOR RESERVE SHUTDOWN HOURS:                 0.0             0.0             0.0   !
: 11. HOURS IN REPORTING PERIOD:
: 14. HOURS CENERATOR WAS ON LINE:                 672.0           1416.0         54893.6
672.0 1416.0 63855.0
: 15. UNIT RESERVE SHUTDOWN HOURS:                   0.0             0.0             0.0
: 12. NO. OF HRS. REACTOR WAS CRITICAL:
: 16. CROSS THERMAL ENERGY GEN. (MWH):         1771465.0         3700992.0     136222314.0
672.0 1416.0 55240.5-
: 17. CROSS ELECT. ENERGY GEN. (MWH):           587552.0         1229678.0     44281471.0   :
: 13. REACTOR RESERVE SHUTDOWN HOURS:
: 18. NET ELECTRICAL ENERGY GEN. (MWH):         558397.0         1168449.0     41843454.0
0.0 0.0 0.0
: 19. UNIT SERVICE FACTOR: (PERCENT)               100.0           100.0           86.0
: 14. HOURS CENERATOR WAS ON LINE:
: 20. UNIT AVAIIABILITY FACTOR:(PERCENT)           100.0           100.0       '
672.0 1416.0 54893.6
86.0
: 15. UNIT RESERVE SHUTDOWN HOURS:
: 21. UNIT CAPACITY FACTOR (MDC): PCT               101.3           100.6           79.5
0.0 0.0 0.0
: 22. UNIT CAPACITY FACTOR (DER): PCT               99.4             98.7           78.4
: 16. CROSS THERMAL ENERGY GEN. (MWH):
: 23. UNIT FORCED OUTAGE RATE: (PERCENT)             0.0             0.0             2.9
1771465.0 3700992.0 136222314.0
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):               [
: 17. CROSS ELECT. ENERGY GEN. (MWH):
THE UNIT IS SCHEDULED TO SHUTDOVN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS.                   t
587552.0 1229678.0 44281471.0
: 18. NET ELECTRICAL ENERGY GEN. (MWH):
558397.0 1168449.0 41843454.0
: 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0
: 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 86.0
: 21. UNIT CAPACITY FACTOR (MDC): PCT 101.3 100.6 79.5
: 22. UNIT CAPACITY FACTOR (DER): PCT 99.4 98.7 78.4
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.9
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
[
THE UNIT IS SCHEDULED TO SHUTDOVN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995.
THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS.
t
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0"'JATION):
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0"'JATION):
I FORECAST     ACHIEVED INITIAL CRITICALITY                   N/A           N/A INITIAL ELECTRICITY                   N/A           N/A             j COMMERCIAL OPERATION                 N/A           N/A               f
I FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A j
COMMERCIAL OPERATION N/A N/A f


s; t
s; t ;lq
                                                                                                                                                                                                                ;lq
.s; UNIT SMUTDOWWS AND POWER REDUC 1t0WS (t20%)-
                                                                                                                                                                                                                .s; <
Decket Wo.
UNIT SMUTDOWWS AND POWER REDUC 1t0WS (t20%)-                                         Decket Wo.       50-412 Unit game     BVPS unit 82 Date March 2. 1995 Completed By David T. Jones REPORT MONTu February 1995                                                     Telephone     (4123 393-7553       .
50-412 Unit game BVPS unit 82 Date March 2. 1995 Completed By David T. Jones REPORT MONTu February 1995 Telephone (4123 393-7553 Method of Licensee Cause & Corrective Ouration Shutting Event System Component Action to No.
Method of       Licensee                                                         Cause & Corrective             .'
Date Typet (Nours)
Ouration                     Shutting         Event         System   Component                                   Action to No. Date       Typet       (Nours)     Reason 2   Down Reactor 3       Report 8         Code 4     Code 5                             _ Prevent Recurrence NONE s.
Reason 2 Down Reactor 3 Report 8 Code 4 Code 5
1                 2                                                 3                                             4-F Forced           Reason:                                           Method:                                       Exhibit F-Instructions for S Scheduled         A-Equipment Feiture (Emptein)                     1-Manuel                                       Preparation of-Dete Entry Sheets B-Meintenance or Test                             2-Menuet Scram                                 for Licensee Event Report. (LER) File C-Refueling                                       3 Automatic Scres                               (NUREG0161).
_ Prevent Recurrence NONE s.
D-Regulatory Restriction                         4-Cont'd. from Previous Month E Operator Training & License Emen               5-Reduction                               5 F-Adelnistrative           .
1 2
9 Other                                       Exhibit N-Sese Source.
3 4-F Forced Reason:
Method:
Exhibit F-Instructions for S Scheduled A-Equipment Feiture (Emptein) 1-Manuel Preparation of-Dete Entry Sheets B-Meintenance or Test 2-Menuet Scram for Licensee Event Report. (LER) File C-Refueling 3 Automatic Scres (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E Operator Training & License Emen 5-Reduction 5
F-Adelnistrative 9 Other Exhibit N-Sese Source.
G operational Error (Emplain)
G operational Error (Emplain)
N-Other ;imptein)
N-Other ;imptein)
  . - - . . . _ ~         - - . . .        . - _          ..      ._    .- -            .-        .  . . - .  -    ..    .- ._                _            . ,    . . . . . _        .      .          .}}
~
.}}

Latest revision as of 08:29, 14 December 2024

Monthly Operating Repts for Feb 1995 for BVPS Units 1 & 2.W/
ML20080U144
Person / Time
Site: Beaver Valley
Issue date: 02/28/1995
From: David Jones, Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9503140247
Download: ML20080U144 (9)


Text

W'; _ {.

~

.I

,t,

~7spT Telephone (412) 393-6000 P O Box 4 Shippingport. PA 15077-0004 March 7,1995 r

Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 g

Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooerating Reoort U. S. Nuclear Regulatory Commission Document Control Desk We.shington, D.C. 20555 Gentlemen:

In accordance with Appendix A,

Technical Specifications, the Monthly Operating Re rt is submitted for Unit 1 and Unit 2 for the month of February,199.

i Respectfully, i

/

&. = =-)

T. P. Noonan Division Vice President, i

Nuclear Operations /

Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA Q"

The Nuclear Professionals ee b.

i

\\

9503140247 950228 PDR ADOCK 05000334 g\\

R PDR T

m

p.

1 1

i NARRATIVE SutRRY OF MMHLY OPERATING EXPERIENCE INIT 1 1

FEBRLERY 1995 February 1

'Ihe Unit began the turn.t period shutdown in Mode 6 for the through tenth refueling outage.

February 11 February 12

'Ihe Unit entered Mode 5 at 1105 hours0.0128 days <br />0.307 hours <br />0.00183 weeks <br />4.204525e-4 months <br />.

Febtuary 13

'Ihe Unit remained in Mode 5 while preparations for entry into through Mode 4 continued.

February 26 February 27

'Ihe Unit entered Mode 4 at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> and began preparations for entry into Mode 3.

February 28

'Ihe Unit entered Mode 3 at 2107 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.017135e-4 months <br /> and remained in Mode 3 for the remainder of the r=ruit period.

i I

a I

v, 3..

' AVERAGE DAILY INIT POWER LEVEL DOGET NO.

50-334 INIT BVPS thiit 1 DATE Marc *1 1. 1995 L

CXMPLETED BY David T. Jones f.

TELEPHONE (412) 393-7553 M3fIH Fhavv 1995 DAY AVERMIE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net)

(Mht-Net) 1 0

17 0-2 0'

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22

-0 7

0 23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28.

0 13 0

29 14 0

30 15 0

31 16 0

INSDUCTICHS On this forin, list the average daily unit power level We-Net for endt day in the reporting month. Oxpute to the nearest whole megawatt.

y y

I OPERATING DATA REPORT DOCKET No.:

50-334 REPORT DATE:

03/02/95 i

COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Nat MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

672.0 1416.0 165072.0

12. NO OF HRS. REACTOR WAS CRITICAL:

0.0 48.7 106605.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

0.0 48,7 104586.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

0.0 72153.0 251399219.5 l

17. GROSS ELECT, ENERGY GEN. (MWH):

0.0 23230.0 81049197.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

-6300.0 10940.0 75734844.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0 3.4 65.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 3.4 65.2 4
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 1.0 59.0
22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.9 57.3
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.1
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

\\

THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

3/06/95

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY-N/A N/A COMMERCIAL OPERATION N/A N/A f

C

a-UNIT SNUTDOWNS AND POWER REDUCTIONS (t20%)

' Docket No.

50-334' Unit Name SVPS Unit #1 Date' march 2. 1995 Completed By David T. Jones REPORT MONTN February 1995

. Telephone (4122 393-7553 *

. Method of Licensee Cause & Corrective Duration Shutting Event System Component

' Action to-No.

Date Typel (Nours)

Reason 2 Doun Reactor 3 Report 8 Code 4 Code 5

. Prevent Recurrence 3

950201 S

672 C

4 N/A RC FUELXX The Unit remained shutdoun for its tenth refueling outage.

1 2

3

'4 F-Forced Reason:

Method:

Exhibit F-Instructions for S Scheduled A-Equipment Failure (Emplain) 1-Manuel Preparation of Data Entry Sheets a-Maintenance or Test 2-Manuel Scree for Licensee Event Report (LER) File C-Refueling 3 Automatic Scram (NUREG0161).

D-Regulatory Restriction 4 Cont'd. from Previous Month

~ -Operator Training & License Emma 5-Reduction 5

E F-AdelnistratIve-9-Other Exhibit N-Same Source.

G-operational Error (Emplain)~

N-Other (Esplein)

1 i

e s

1 1

NARRATIVE SGMARY OF KNIELY OPERATING EXPERIDICE 1

l LNIT 2 1

i FEBRUARY 1995 3

Fekruary 1

'Ihe unit operated at a ncaninal value of 100% cutput for the through entire i w t period.

February 28 1

l a

4 i

b i

l

?

h I

i 1

i l

[

h t

i i

- l.

..~. -

i s

p 7

e t

AVERAGE MILY INIT KMER LEVEL b

DOOGT NO.-

50-412 LNIT BVPS Iktit 2 MTE Martf1 1. 1995 CD4PLETED BY David T.- Jonas 4

TELEPH NE (412) 393-7553 6

)ENIH WmW 1995 MY AVERAGE IRILY POWER IEVEL IRY AVERAGE MILY POWER LEVEL G"L %t)

(PWe-Net) k 1

831 17 830 2

833 18 828 3

836 19 827 4

836 20 827 i

f 5

838 21 833 6

837 22 832 7

837 23 823 i

8 835 24 832 9

833 25 829 10 630 26 829 11 833 27 821 12 834 28 825 13 832 29 14 831 30 15 825 31 16 830 INS'IRUCTICNS

+

On this fcrm, list the average daily unit power level PWe-Net for each day in the reparting month. Campute to the nearest whole megawatt.

y f.

p l-1 F

^ -

OPERATING DATA REPORT DOCKET No.:

50-412

)

F.

REPORT DATE: 03/02/95 COMPLETED BY: DAVID T. JONES E

TELEPHONE:

(412) 393-7553 r, -

OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

.5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

~ 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:

f

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

672.0 1416.0 63855.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

672.0 1416.0 55240.5-

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS CENERATOR WAS ON LINE:

672.0 1416.0 54893.6

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MWH):

1771465.0 3700992.0 136222314.0

17. CROSS ELECT. ENERGY GEN. (MWH):

587552.0 1229678.0 44281471.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

558397.0 1168449.0 41843454.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0
20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 86.0
21. UNIT CAPACITY FACTOR (MDC): PCT 101.3 100.6 79.5
22. UNIT CAPACITY FACTOR (DER): PCT 99.4 98.7 78.4
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.9
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

[

THE UNIT IS SCHEDULED TO SHUTDOVN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995.

THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS.

t

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0"'JATION):

I FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A j

COMMERCIAL OPERATION N/A N/A f

s; t ;lq

.s; UNIT SMUTDOWWS AND POWER REDUC 1t0WS (t20%)-

Decket Wo.

50-412 Unit game BVPS unit 82 Date March 2. 1995 Completed By David T. Jones REPORT MONTu February 1995 Telephone (4123 393-7553 Method of Licensee Cause & Corrective Ouration Shutting Event System Component Action to No.

Date Typet (Nours)

Reason 2 Down Reactor 3 Report 8 Code 4 Code 5

_ Prevent Recurrence NONE s.

1 2

3 4-F Forced Reason:

Method:

Exhibit F-Instructions for S Scheduled A-Equipment Feiture (Emptein) 1-Manuel Preparation of-Dete Entry Sheets B-Meintenance or Test 2-Menuet Scram for Licensee Event Report. (LER) File C-Refueling 3 Automatic Scres (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E Operator Training & License Emen 5-Reduction 5

F-Adelnistrative 9 Other Exhibit N-Sese Source.

G operational Error (Emplain)

N-Other ;imptein)

~

.