~7spT Telephone (412) 393-6000 P O Box 4 Shippingport. PA 15077-0004 March 7,1995 r | |||
Beaver Valley Power Station | Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 g | ||
Document Control Desk | Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooerating Reoort U. S. Nuclear Regulatory Commission Document Control Desk We.shington, D.C. 20555 Gentlemen: | ||
We.shington, D.C. 20555 Gentlemen: | In accordance with Appendix A, | ||
In accordance with Appendix A, Technical Specifications, the Monthly Operating Re rt is submitted for Unit 1 and Unit 2 for the month of February,199 . | Technical Specifications, the Monthly Operating Re rt is submitted for Unit 1 and Unit 2 for the month of February,199. | ||
i Respectfully, | i Respectfully, i | ||
/ | |||
T. P. Noonan | ;&. = =-) | ||
Q" | T. P. Noonan Division Vice President, i | ||
Nuclear Operations / | |||
ADOCK 05000334 | Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA Q" | ||
PDR | The Nuclear Professionals ee b. | ||
i | |||
\\ | |||
9503140247 950228 PDR ADOCK 05000334 g\\ | |||
R PDR T | |||
m | |||
p. | p. | ||
1 | 1 1 | ||
i NARRATIVE SutRRY OF MMHLY OPERATING EXPERIENCE INIT 1 1 | |||
NARRATIVE SutRRY OF | FEBRLERY 1995 February 1 | ||
'Ihe Unit began the turn.t period shutdown in Mode 6 for the through tenth refueling outage. | |||
FEBRLERY 1995 February 1 | February 11 February 12 | ||
February 11 February 12 | 'Ihe Unit entered Mode 5 at 1105 hours. | ||
Febtuary 13 | Febtuary 13 | ||
February 26 February 27 | 'Ihe Unit remained in Mode 5 while preparations for entry into through Mode 4 continued. | ||
February 28 | February 26 February 27 | ||
'Ihe Unit entered Mode 4 at 1730 hours and began preparations for entry into Mode 3. | |||
February 28 | |||
'Ihe Unit entered Mode 3 at 2107 hours and remained in Mode 3 for the remainder of the r=ruit period. | |||
i I | i I | ||
a I | a I | ||
v, | v, 3.. | ||
3.. | ' AVERAGE DAILY INIT POWER LEVEL DOGET NO. | ||
50-334 INIT BVPS thiit 1 DATE Marc *1 1. 1995 L | |||
CXMPLETED BY David T. Jones f. | |||
4 | TELEPHONE (412) 393-7553 M3fIH Fhavv 1995 DAY AVERMIE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net) | ||
10 | (Mht-Net) 1 0 | ||
14 | 17 0-2 0' | ||
18 0 | |||
3 0 | |||
19 0 | |||
4 0 | |||
20 0 | |||
5 0 | |||
21 0 | |||
6 0 | |||
22 | |||
-0 7 | |||
0 23 0 | |||
8 0 | |||
24 0 | |||
9 0 | |||
25 0 | |||
10 0 | |||
26 0 | |||
11 0 | |||
27 0 | |||
12 0 | |||
28. | |||
0 13 0 | |||
29 14 0 | |||
30 15 0 | |||
31 16 0 | |||
INSDUCTICHS On this forin, list the average daily unit power level We-Net for endt day in the reporting month. Oxpute to the nearest whole megawatt. | |||
y | y y | ||
I OPERATING DATA REPORT DOCKET No.: | |||
OPERATING DATA REPORT DOCKET No.: | 50-334 REPORT DATE: | ||
TELEPHONE: | 03/02/95 i | ||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 | COMPLETED BY: DAVID T. JONES TELEPHONE: | ||
(412) 393-7553 OPERATING STATUS | |||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes | |||
: 2. REPORTING PERIOD: FEBRUARY 1995 | : 2. REPORTING PERIOD: FEBRUARY 1995 | ||
: 3. LICENSED THERMAL POWER (MWt): | : 3. LICENSED THERMAL POWER (MWt): | ||
: 4. NAMEPLATE RATING (Gross MWe): | 2652 | ||
: 5. DESIGN ELECTRICAL RATING (Net MWe): | : 4. NAMEPLATE RATING (Gross MWe): | ||
: 6. MAX DEPENDABLE CAPACITY (Gross MWe): | 923 | ||
: 7. MAX. DEPENDABLE CAPACITY (Nat MWe): | : 5. DESIGN ELECTRICAL RATING (Net MWe): | ||
835 | |||
: 6. MAX DEPENDABLE CAPACITY (Gross MWe): | |||
860 | |||
: 7. MAX. DEPENDABLE CAPACITY (Nat MWe): | |||
810 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS: | : 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS: | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | None | ||
: 11. HOURS IN REPORTING PERIOD: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
: 12. NO OF HRS. REACTOR WAS CRITICAL: | N/A THIS MONTH YEAR TO DATE CUMULATIVE | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS: | : 11. HOURS IN REPORTING PERIOD: | ||
: 14. HOURS GENERATOR WAS ON LINE: | 672.0 1416.0 165072.0 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS: | : 12. NO OF HRS. REACTOR WAS CRITICAL: | ||
: 16. GROSS THERMAL ENERGY GEN. (MWH): | 0.0 48.7 106605.5 | ||
: 17. GROSS ELECT, ENERGY GEN. (MWH): | : 13. REACTOR RESERVE SHUTDOWN HOURS: | ||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | 0.0 0.0 4482.8 | ||
: 19. UNIT SERVICE FACTOR: (PERCENT) | : 14. HOURS GENERATOR WAS ON LINE: | ||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) | 0.0 48,7 104586.4 | ||
: 21. UNIT CAPACITY FACTOR (MDC): PCT | : 15. UNIT RESERVE SHUTDOWN HOURS: | ||
: 22. UNIT CAPACITY FACTOR (DER): PCT | 0.0 0.0 0.0 | ||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) | : 16. GROSS THERMAL ENERGY GEN. (MWH): | ||
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): | 0.0 72153.0 251399219.5 l | ||
: 17. GROSS ELECT, ENERGY GEN. (MWH): | |||
0.0 23230.0 81049197.0 | |||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | |||
-6300.0 10940.0 75734844.0 | |||
: 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 3.4 65.2 | |||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 3.4 65.2 4 | |||
: 21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 1.0 59.0 | |||
: 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.9 57.3 | |||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.1 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): | |||
\\ | |||
THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS. | THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS. | ||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
3/06/95 | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
FORECAST | FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY-N/A N/A COMMERCIAL OPERATION N/A N/A f | ||
C | C | ||
a-UNIT SNUTDOWNS AND POWER REDUCTIONS (t20%) | a-UNIT SNUTDOWNS AND POWER REDUCTIONS (t20%) | ||
' Docket No. | |||
Duration | 50-334' Unit Name SVPS Unit #1 Date' march 2. 1995 Completed By David T. Jones REPORT MONTN February 1995 | ||
1 | . Telephone (4122 393-7553 * | ||
D-Regulatory Restriction | . Method of Licensee Cause & Corrective Duration Shutting Event System Component | ||
' Action to-No. | |||
Date Typel (Nours) | |||
Reason 2 Doun Reactor 3 Report 8 Code 4 Code 5 | |||
. Prevent Recurrence 3 | |||
950201 S | |||
672 C | |||
4 N/A RC FUELXX The Unit remained shutdoun for its tenth refueling outage. | |||
1 2 | |||
3 | |||
'4 F-Forced Reason: | |||
Method: | |||
Exhibit F-Instructions for S Scheduled A-Equipment Failure (Emplain) 1-Manuel Preparation of Data Entry Sheets a-Maintenance or Test 2-Manuel Scree for Licensee Event Report (LER) File C-Refueling 3 Automatic Scram (NUREG0161). | |||
D-Regulatory Restriction 4 Cont'd. from Previous Month | |||
~ -Operator Training & License Emma 5-Reduction 5 | |||
E F-AdelnistratIve-9-Other Exhibit N-Same Source. | |||
G-operational Error (Emplain)~ | G-operational Error (Emplain)~ | ||
N-Other (Esplein) | N-Other (Esplein) | ||
1 i | 1 i | ||
e s | |||
1 1 | |||
NARRATIVE SGMARY OF KNIELY OPERATING EXPERIDICE 1 | |||
l LNIT 2 1 | |||
LNIT 2 | i FEBRUARY 1995 3 | ||
Fekruary 1 | |||
FEBRUARY 1995 3 | 'Ihe unit operated at a ncaninal value of 100% cutput for the through entire i w t period. | ||
February 28 1 | |||
February 28 | l a | ||
4 i | |||
b i | |||
i | l | ||
? | |||
h I | h I | ||
i 1 | i 1 | ||
| Line 120: | Line 185: | ||
h t | h t | ||
i i | i i | ||
- l. | |||
..~. - | |||
i | i s | ||
s | p 7 | ||
p | e t | ||
AVERAGE MILY INIT KMER LEVEL b | |||
t | DOOGT NO.- | ||
50-412 LNIT BVPS Iktit 2 MTE Martf1 1. 1995 CD4PLETED BY David T.- Jonas 4 | |||
TELEPH NE (412) 393-7553 6 | |||
LNIT | )ENIH WmW 1995 MY AVERAGE IRILY POWER IEVEL IRY AVERAGE MILY POWER LEVEL G"L %t) | ||
MTE | (PWe-Net) k 1 | ||
CD4PLETED BY | 831 17 830 2 | ||
TELEPH NE | 833 18 828 3 | ||
6 | 836 19 827 4 | ||
836 20 827 i | |||
f 5 | |||
838 21 833 6 | |||
837 22 832 7 | |||
11 | 837 23 823 i | ||
14 | 8 835 24 832 9 | ||
INS'IRUCTICNS | 833 25 829 10 630 26 829 11 833 27 821 12 834 28 825 13 832 29 14 831 30 15 825 31 16 830 INS'IRUCTICNS | ||
On this fcrm, | + | ||
On this fcrm, list the average daily unit power level PWe-Net for each day in the reparting month. Campute to the nearest whole megawatt. | |||
y | y f. | ||
p l-1 F | |||
p | ^ - | ||
l- | OPERATING DATA REPORT DOCKET No.: | ||
50-412 | |||
) | |||
F. | F. | ||
REPORT DATE: 03/02/95 | REPORT DATE: 03/02/95 COMPLETED BY: DAVID T. JONES E | ||
TELEPHONE: | |||
TELEPHONE: | (412) 393-7553 r, - | ||
OPERATING STATUS | OPERATING STATUS | ||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 | : 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes | ||
: 2. REPORTING PERIOD: FEBRUARY 1995 | : 2. REPORTING PERIOD: FEBRUARY 1995 | ||
: 3. LICENSED THERMAL POWER (MWt): | : 3. LICENSED THERMAL POWER (MWt): | ||
: 4. NAMEPLATE RATING (Gross MWe): | 2652 | ||
: 4. NAMEPLATE RATING (Gross MWe): | |||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | 923 | ||
: 7. MAX. DEPENDABLE CAPACITY (Net MWe): | .5. DESIGN ELECTRICAL RATING (Net MWe): | ||
836 | |||
: 6. MAX. DEPENDABLE CAPACITY (Gross MWe): | |||
870 | |||
: 7. MAX. DEPENDABLE CAPACITY (Net MWe): | |||
820 | |||
~ 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS: | |||
f | f | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | None | ||
: 11. HOURS IN REPORTING PERIOD: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
: 12. NO. OF HRS. REACTOR WAS CRITICAL: | N/A THIS MONTH YEAR TO DATE CUMUIATIVE | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS: | : 11. HOURS IN REPORTING PERIOD: | ||
: 14. HOURS CENERATOR WAS ON LINE: | 672.0 1416.0 63855.0 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS: | : 12. NO. OF HRS. REACTOR WAS CRITICAL: | ||
: 16. CROSS THERMAL ENERGY GEN. (MWH): | 672.0 1416.0 55240.5- | ||
: 17. CROSS ELECT. ENERGY GEN. (MWH): | : 13. REACTOR RESERVE SHUTDOWN HOURS: | ||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | 0.0 0.0 0.0 | ||
: 19. UNIT SERVICE FACTOR: (PERCENT) | : 14. HOURS CENERATOR WAS ON LINE: | ||
: 20. UNIT AVAIIABILITY FACTOR:(PERCENT) | 672.0 1416.0 54893.6 | ||
86.0 | : 15. UNIT RESERVE SHUTDOWN HOURS: | ||
: 21. UNIT CAPACITY FACTOR (MDC): PCT | 0.0 0.0 0.0 | ||
: 22. UNIT CAPACITY FACTOR (DER): PCT | : 16. CROSS THERMAL ENERGY GEN. (MWH): | ||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) | 1771465.0 3700992.0 136222314.0 | ||
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): | : 17. CROSS ELECT. ENERGY GEN. (MWH): | ||
THE UNIT IS SCHEDULED TO SHUTDOVN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS. | 587552.0 1229678.0 44281471.0 | ||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | |||
558397.0 1168449.0 41843454.0 | |||
: 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0 | |||
: 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 86.0 | |||
: 21. UNIT CAPACITY FACTOR (MDC): PCT 101.3 100.6 79.5 | |||
: 22. UNIT CAPACITY FACTOR (DER): PCT 99.4 98.7 78.4 | |||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.9 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): | |||
[ | |||
THE UNIT IS SCHEDULED TO SHUTDOVN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995. | |||
THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS. | |||
t | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0"'JATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0"'JATION): | ||
I FORECAST | I FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A j | ||
COMMERCIAL OPERATION N/A N/A f | |||
s; t | s; t ;lq | ||
.s; UNIT SMUTDOWWS AND POWER REDUC 1t0WS (t20%)- | |||
Decket Wo. | |||
UNIT SMUTDOWWS AND POWER REDUC 1t0WS (t20%)- | 50-412 Unit game BVPS unit 82 Date March 2. 1995 Completed By David T. Jones REPORT MONTu February 1995 Telephone (4123 393-7553 Method of Licensee Cause & Corrective Ouration Shutting Event System Component Action to No. | ||
Method of | Date Typet (Nours) | ||
Ouration | Reason 2 Down Reactor 3 Report 8 Code 4 Code 5 | ||
1 | _ Prevent Recurrence NONE s. | ||
D-Regulatory Restriction | 1 2 | ||
9 Other | 3 4-F Forced Reason: | ||
Method: | |||
Exhibit F-Instructions for S Scheduled A-Equipment Feiture (Emptein) 1-Manuel Preparation of-Dete Entry Sheets B-Meintenance or Test 2-Menuet Scram for Licensee Event Report. (LER) File C-Refueling 3 Automatic Scres (NUREG0161). | |||
D-Regulatory Restriction 4-Cont'd. from Previous Month E Operator Training & License Emen 5-Reduction 5 | |||
F-Adelnistrative 9 Other Exhibit N-Sese Source. | |||
G operational Error (Emplain) | G operational Error (Emplain) | ||
N-Other ;imptein) | N-Other ;imptein) | ||
~ | |||
.}} | |||
Latest revision as of 08:29, 14 December 2024
| ML20080U144 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/28/1995 |
| From: | David Jones, Noonan T DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9503140247 | |
| Download: ML20080U144 (9) | |
Text
W'; _ {.
~
.I
,t,
~7spT Telephone (412) 393-6000 P O Box 4 Shippingport. PA 15077-0004 March 7,1995 r
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 g
Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooerating Reoort U. S. Nuclear Regulatory Commission Document Control Desk We.shington, D.C. 20555 Gentlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Re rt is submitted for Unit 1 and Unit 2 for the month of February,199.
i Respectfully, i
/
- &. = =-)
T. P. Noonan Division Vice President, i
Nuclear Operations /
Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA Q"
The Nuclear Professionals ee b.
i
\\
9503140247 950228 PDR ADOCK 05000334 g\\
R PDR T
m
p.
1 1
i NARRATIVE SutRRY OF MMHLY OPERATING EXPERIENCE INIT 1 1
FEBRLERY 1995 February 1
'Ihe Unit began the turn.t period shutdown in Mode 6 for the through tenth refueling outage.
February 11 February 12
'Ihe Unit entered Mode 5 at 1105 hours0.0128 days <br />0.307 hours <br />0.00183 weeks <br />4.204525e-4 months <br />.
Febtuary 13
'Ihe Unit remained in Mode 5 while preparations for entry into through Mode 4 continued.
February 26 February 27
'Ihe Unit entered Mode 4 at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> and began preparations for entry into Mode 3.
February 28
'Ihe Unit entered Mode 3 at 2107 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.017135e-4 months <br /> and remained in Mode 3 for the remainder of the r=ruit period.
i I
a I
v, 3..
' AVERAGE DAILY INIT POWER LEVEL DOGET NO.
50-334 INIT BVPS thiit 1 DATE Marc *1 1. 1995 L
CXMPLETED BY David T. Jones f.
TELEPHONE (412) 393-7553 M3fIH Fhavv 1995 DAY AVERMIE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net)
(Mht-Net) 1 0
17 0-2 0'
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22
-0 7
0 23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28.
0 13 0
29 14 0
30 15 0
31 16 0
INSDUCTICHS On this forin, list the average daily unit power level We-Net for endt day in the reporting month. Oxpute to the nearest whole megawatt.
y y
I OPERATING DATA REPORT DOCKET No.:
50-334 REPORT DATE:
03/02/95 i
COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: FEBRUARY 1995
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Nat MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
672.0 1416.0 165072.0
- 12. NO OF HRS. REACTOR WAS CRITICAL:
0.0 48.7 106605.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
0.0 48,7 104586.4
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
0.0 72153.0 251399219.5 l
- 17. GROSS ELECT, ENERGY GEN. (MWH):
0.0 23230.0 81049197.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
-6300.0 10940.0 75734844.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 3.4 65.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 3.4 65.2 4
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.9 57.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
\\
THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
3/06/95
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY-N/A N/A COMMERCIAL OPERATION N/A N/A f
C
a-UNIT SNUTDOWNS AND POWER REDUCTIONS (t20%)
' Docket No.
50-334' Unit Name SVPS Unit #1 Date' march 2. 1995 Completed By David T. Jones REPORT MONTN February 1995
. Telephone (4122 393-7553 *
. Method of Licensee Cause & Corrective Duration Shutting Event System Component
' Action to-No.
Date Typel (Nours)
Reason 2 Doun Reactor 3 Report 8 Code 4 Code 5
. Prevent Recurrence 3
950201 S
672 C
4 N/A RC FUELXX The Unit remained shutdoun for its tenth refueling outage.
1 2
3
'4 F-Forced Reason:
Method:
Exhibit F-Instructions for S Scheduled A-Equipment Failure (Emplain) 1-Manuel Preparation of Data Entry Sheets a-Maintenance or Test 2-Manuel Scree for Licensee Event Report (LER) File C-Refueling 3 Automatic Scram (NUREG0161).
D-Regulatory Restriction 4 Cont'd. from Previous Month
~ -Operator Training & License Emma 5-Reduction 5
E F-AdelnistratIve-9-Other Exhibit N-Same Source.
G-operational Error (Emplain)~
N-Other (Esplein)
1 i
e s
1 1
NARRATIVE SGMARY OF KNIELY OPERATING EXPERIDICE 1
l LNIT 2 1
i FEBRUARY 1995 3
Fekruary 1
'Ihe unit operated at a ncaninal value of 100% cutput for the through entire i w t period.
February 28 1
l a
4 i
b i
l
?
h I
i 1
i l
[
h t
i i
- l.
..~. -
i s
p 7
e t
AVERAGE MILY INIT KMER LEVEL b
DOOGT NO.-
50-412 LNIT BVPS Iktit 2 MTE Martf1 1. 1995 CD4PLETED BY David T.- Jonas 4
TELEPH NE (412) 393-7553 6
)ENIH WmW 1995 MY AVERAGE IRILY POWER IEVEL IRY AVERAGE MILY POWER LEVEL G"L %t)
(PWe-Net) k 1
831 17 830 2
833 18 828 3
836 19 827 4
836 20 827 i
f 5
838 21 833 6
837 22 832 7
837 23 823 i
8 835 24 832 9
833 25 829 10 630 26 829 11 833 27 821 12 834 28 825 13 832 29 14 831 30 15 825 31 16 830 INS'IRUCTICNS
+
On this fcrm, list the average daily unit power level PWe-Net for each day in the reparting month. Campute to the nearest whole megawatt.
y f.
p l-1 F
^ -
OPERATING DATA REPORT DOCKET No.:
50-412
)
F.
REPORT DATE: 03/02/95 COMPLETED BY: DAVID T. JONES E
TELEPHONE:
(412) 393-7553 r, -
OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUARY 1995
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
.5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
~ 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
f
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
672.0 1416.0 63855.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
672.0 1416.0 55240.5-
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS CENERATOR WAS ON LINE:
672.0 1416.0 54893.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH):
1771465.0 3700992.0 136222314.0
- 17. CROSS ELECT. ENERGY GEN. (MWH):
587552.0 1229678.0 44281471.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
558397.0 1168449.0 41843454.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 86.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 99.4 98.7 78.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
[
THE UNIT IS SCHEDULED TO SHUTDOVN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995.
THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS.
t
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0"'JATION):
I FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A j
COMMERCIAL OPERATION N/A N/A f
s; t ;lq
.s; UNIT SMUTDOWWS AND POWER REDUC 1t0WS (t20%)-
Decket Wo.
50-412 Unit game BVPS unit 82 Date March 2. 1995 Completed By David T. Jones REPORT MONTu February 1995 Telephone (4123 393-7553 Method of Licensee Cause & Corrective Ouration Shutting Event System Component Action to No.
Date Typet (Nours)
Reason 2 Down Reactor 3 Report 8 Code 4 Code 5
_ Prevent Recurrence NONE s.
1 2
3 4-F Forced Reason:
Method:
Exhibit F-Instructions for S Scheduled A-Equipment Feiture (Emptein) 1-Manuel Preparation of-Dete Entry Sheets B-Meintenance or Test 2-Menuet Scram for Licensee Event Report. (LER) File C-Refueling 3 Automatic Scres (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E Operator Training & License Emen 5-Reduction 5
F-Adelnistrative 9 Other Exhibit N-Sese Source.
G operational Error (Emplain)
N-Other ;imptein)
~
.