~7spT Telephone (412) 393-6000 P O Box 4 Shippingport. PA 15077-0004 March 7,1995 r

Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 g

Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooerating Reoort U. S. Nuclear Regulatory Commission Document Control Desk We.shington, D.C. 20555 Gentlemen:

In accordance with Appendix A,

Technical Specifications, the Monthly Operating Re rt is submitted for Unit 1 and Unit 2 for the month of February,199.

i Respectfully, i

/

&. = =-)

T. P. Noonan Division Vice President, i

Nuclear Operations /

Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA Q"

The Nuclear Professionals ee b.

i

\\

9503140247 950228 PDR ADOCK 05000334 g\\

R PDR T

m

p.

1 1

i NARRATIVE SutRRY OF MMHLY OPERATING EXPERIENCE INIT 1 1

FEBRLERY 1995 February 1

'Ihe Unit began the turn.t period shutdown in Mode 6 for the through tenth refueling outage.

February 11 February 12

'Ihe Unit entered Mode 5 at 1105 hours0.0128 days <br />0.307 hours <br />0.00183 weeks <br />4.204525e-4 months <br />.

Febtuary 13

'Ihe Unit remained in Mode 5 while preparations for entry into through Mode 4 continued.

February 26 February 27

'Ihe Unit entered Mode 4 at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> and began preparations for entry into Mode 3.

February 28

'Ihe Unit entered Mode 3 at 2107 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.017135e-4 months <br /> and remained in Mode 3 for the remainder of the r=ruit period.

i I

a I

v, 3..

' AVERAGE DAILY INIT POWER LEVEL DOGET NO.

50-334 INIT BVPS thiit 1 DATE Marc *1 1. 1995 L

CXMPLETED BY David T. Jones f.

TELEPHONE (412) 393-7553 M3fIH Fhavv 1995 DAY AVERMIE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net)

(Mht-Net) 1 0

17 0-2 0'

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22

-0 7

0 23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28.

0 13 0

29 14 0

30 15 0

31 16 0

INSDUCTICHS On this forin, list the average daily unit power level We-Net for endt day in the reporting month. Oxpute to the nearest whole megawatt.

y y

I OPERATING DATA REPORT DOCKET No.:

50-334 REPORT DATE:

03/02/95 i

COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Nat MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

672.0 1416.0 165072.0

12. NO OF HRS. REACTOR WAS CRITICAL:

0.0 48.7 106605.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

0.0 48,7 104586.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

0.0 72153.0 251399219.5 l

17. GROSS ELECT, ENERGY GEN. (MWH):

0.0 23230.0 81049197.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

-6300.0 10940.0 75734844.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0 3.4 65.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 3.4 65.2 4
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 1.0 59.0
22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.9 57.3
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.1
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

\\

THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

3/06/95

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY-N/A N/A COMMERCIAL OPERATION N/A N/A f

C

a-UNIT SNUTDOWNS AND POWER REDUCTIONS (t20%)

' Docket No.

50-334' Unit Name SVPS Unit #1 Date' march 2. 1995 Completed By David T. Jones REPORT MONTN February 1995

. Telephone (4122 393-7553 *

. Method of Licensee Cause & Corrective Duration Shutting Event System Component

' Action to-No.

Date Typel (Nours)

Reason 2 Doun Reactor 3 Report 8 Code 4 Code 5

. Prevent Recurrence 3

950201 S

672 C

4 N/A RC FUELXX The Unit remained shutdoun for its tenth refueling outage.

1 2

3

'4 F-Forced Reason:

Method:

Exhibit F-Instructions for S Scheduled A-Equipment Failure (Emplain) 1-Manuel Preparation of Data Entry Sheets a-Maintenance or Test 2-Manuel Scree for Licensee Event Report (LER) File C-Refueling 3 Automatic Scram (NUREG0161).

D-Regulatory Restriction 4 Cont'd. from Previous Month

~ -Operator Training & License Emma 5-Reduction 5

E F-AdelnistratIve-9-Other Exhibit N-Same Source.

G-operational Error (Emplain)~

N-Other (Esplein)

1 i

e s

1 1

NARRATIVE SGMARY OF KNIELY OPERATING EXPERIDICE 1

l LNIT 2 1

i FEBRUARY 1995 3

Fekruary 1

'Ihe unit operated at a ncaninal value of 100% cutput for the through entire i w t period.

February 28 1

l a

4 i

b i

l

?

h I

i 1

i l

[

h t

i i

- l.

..~. -

i s

p 7

e t

AVERAGE MILY INIT KMER LEVEL b

DOOGT NO.-

50-412 LNIT BVPS Iktit 2 MTE Martf1 1. 1995 CD4PLETED BY David T.- Jonas 4

TELEPH NE (412) 393-7553 6

)ENIH WmW 1995 MY AVERAGE IRILY POWER IEVEL IRY AVERAGE MILY POWER LEVEL G"L %t)

(PWe-Net) k 1

831 17 830 2

833 18 828 3

836 19 827 4

836 20 827 i

f 5

838 21 833 6

837 22 832 7

837 23 823 i

8 835 24 832 9

833 25 829 10 630 26 829 11 833 27 821 12 834 28 825 13 832 29 14 831 30 15 825 31 16 830 INS'IRUCTICNS

+

On this fcrm, list the average daily unit power level PWe-Net for each day in the reparting month. Campute to the nearest whole megawatt.

y f.

p l-1 F

^ -

OPERATING DATA REPORT DOCKET No.:

50-412

)

F.

REPORT DATE: 03/02/95 COMPLETED BY: DAVID T. JONES E

TELEPHONE:

(412) 393-7553 r, -

OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

.5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

~ 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:

f

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

672.0 1416.0 63855.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

672.0 1416.0 55240.5-

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS CENERATOR WAS ON LINE:

672.0 1416.0 54893.6

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MWH):

1771465.0 3700992.0 136222314.0

17. CROSS ELECT. ENERGY GEN. (MWH):

587552.0 1229678.0 44281471.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

558397.0 1168449.0 41843454.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0
20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 86.0
21. UNIT CAPACITY FACTOR (MDC): PCT 101.3 100.6 79.5
22. UNIT CAPACITY FACTOR (DER): PCT 99.4 98.7 78.4
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.9
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

[

THE UNIT IS SCHEDULED TO SHUTDOVN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995.

THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS.

t

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0"'JATION):

I FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A j

COMMERCIAL OPERATION N/A N/A f

s; t ;lq

.s; UNIT SMUTDOWWS AND POWER REDUC 1t0WS (t20%)-

Decket Wo.

50-412 Unit game BVPS unit 82 Date March 2. 1995 Completed By David T. Jones REPORT MONTu February 1995 Telephone (4123 393-7553 Method of Licensee Cause & Corrective Ouration Shutting Event System Component Action to No.

Date Typet (Nours)

Reason 2 Down Reactor 3 Report 8 Code 4 Code 5

_ Prevent Recurrence NONE s.

1 2

3 4-F Forced Reason:

Method:

Exhibit F-Instructions for S Scheduled A-Equipment Feiture (Emptein) 1-Manuel Preparation of-Dete Entry Sheets B-Meintenance or Test 2-Menuet Scram for Licensee Event Report. (LER) File C-Refueling 3 Automatic Scres (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E Operator Training & License Emen 5-Reduction 5

F-Adelnistrative 9 Other Exhibit N-Sese Source.

G operational Error (Emplain)

N-Other ;imptein)

~

.