~7spT Telephone (412) 393-6000 P O Box 4 Shippingport. PA 15077-0004 r March 7,1995 ,

Beaver Valley Power Station g Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooerating Reoort U. S. Nuclear Regulatory Commission .

Document Control Desk  :

We.shington, D.C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Re rt is submitted for Unit 1 and Unit 2 for the month of February,199 .

i Respectfully, li l

/  ;&. = =-)

T. P. Noonan i Division Vice President, i Nuclear Operations / l Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA ,

Q" ee The Nuclear Professionals

b. \ i 9503140247 950228 PDR R

ADOCK 05000334 g\

PDR T m

p.

1

. 1 i

NARRATIVE SutRRY OF  !

'. MMHLY OPERATING EXPERIENCE INIT 1 1 l

FEBRLERY 1995 February 1 'Ihe Unit began the turn.t period shutdown in Mode 6 for the through tenth refueling outage.

February 11 February 12 'Ihe Unit entered Mode 5 at 1105 hours0.0128 days <br />0.307 hours <br />0.00183 weeks <br />4.204525e-4 months <br />.

Febtuary 13 'Ihe Unit remained in Mode 5 while preparations for entry into through Mode 4 continued.

February 26 February 27 'Ihe Unit entered Mode 4 at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> and began preparations for entry into Mode 3.

February 28 'Ihe Unit entered Mode 3 at 2107 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.017135e-4 months <br /> and remained in Mode 3 for the remainder of the r=ruit period.

i I

a I

v, . ,. . . _

3..

' AVERAGE DAILY INIT POWER LEVEL DOGET NO. 50-334 INIT BVPS thiit 1 DATE Marc *1 1. 1995 L CXMPLETED BY David T. Jones -

f. TELEPHONE (412) 393-7553 M3fIH Fhavv 1995 DAY AVERMIE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net) (Mht-Net) 1 0 17 0-2 0' 18 0 3 0 19 0 ,

4 0 20 0 5 0 21 0 6 0 22 -0 7 0 23 0 8 0 24 0 9 0 25 0  ;

10 0 26 0 11 0 27 0 12 0 28. 0 13 0 29 ,

14 0 30 15 0 31 16 0 INSDUCTICHS On this forin, list the average daily unit power level We-Net for endt day in the reporting month. Oxpute to the nearest whole megawatt.

y -

y I

OPERATING DATA REPORT DOCKET No.: 50-334 REPORT DATE: 03/02/95 i COMPLETED BY: DAVID T. JONES  !

TELEPHONE: (412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWt): 2652 ,
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835
6. MAX DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX. DEPENDABLE CAPACITY (Nat MWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 672.0 1416.0 165072.0
12. NO OF HRS. REACTOR WAS CRITICAL: 0.0 48.7 106605.5
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 0.0 48,7 104586.4
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 0.0 72153.0 251399219.5 l
17. GROSS ELECT, ENERGY GEN. (MWH): 0.0 23230.0 81049197.0
18. NET ELECTRICAL ENERGY GEN. (MWH): -6300.0 10940.0 75734844.0
19. UNIT SERVICE FACTOR: (PERCENT) 0.0 3.4 65.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 3.4 65.2 4
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 1.0 59.0
22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.9 57.3
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 16.1 *
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): \

THE UNIT WAS SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON JANUARY 3. 1995 AT 0043 HOURS.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 3/06/95
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY- N/A N/A

, COMMERCIAL OPERATION N/A N/A f

C

a-UNIT SNUTDOWNS AND POWER REDUCTIONS (t20%) ' Docket No. 50-334' Unit Name SVPS Unit #1 Date' march 2. 1995 Completed By David T. Jones REPORT MONTN February 1995 . Telephone (4122 393-7553 *

. Method of Licensee Cause & Corrective -

Duration Shutting Event System Component ' Action to-No. Date Typel (Nours) Reason 2 Doun Reactor 3 Report 8 Code 4 Code 5 . Prevent Recurrence 3 950201 S 672 C 4 N/A RC FUELXX The Unit remained shutdoun for its tenth refueling outage.

1 2 3 '4 F-Forced Reason: Method: Exhibit F-Instructions for S Scheduled A-Equipment Failure (Emplain) 1-Manuel Preparation of Data Entry Sheets a-Maintenance or Test 2-Manuel Scree for Licensee Event Report (LER) File C-Refueling 3 Automatic Scram (NUREG0161).

D-Regulatory Restriction 4 Cont'd. from Previous Month

~E -Operator Training & License Emma 5-Reduction 5 F-AdelnistratIve- 9-Other Exhibit N-Same Source. -

G-operational Error (Emplain)~

N-Other (Esplein)

1 i

- e s 1

1 NARRATIVE SGMARY OF

, KNIELY OPERATING EXPERIDICE 1

1 l

LNIT 2  ;

1 i

FEBRUARY 1995 3 ,

I Fekruary 1 'Ihe unit operated at a ncaninal value of 100% cutput for the through entire i w t period.

February 28 .

1 l

a 4

i b

i l

?

h I

i 1

i l

[

h t

i i

- l.

. . .~. - - _ _ . . .

i ..

s ,

p ..

, , 7 e

t

., AVERAGE MILY INIT KMER LEVEL '

b DOOGT NO.- 50-412 -

LNIT BVPS Iktit 2  ;

MTE Martf1 1. 1995 4

CD4PLETED BY David T.- Jonas .

TELEPH NE (412) 393-7553  !

6

)ENIH WmW 1995 MY AVERAGE IRILY POWER IEVEL IRY AVERAGE MILY POWER LEVEL G"L %t) (PWe-Net) k 1 831 17 830 2 833 18 828 3 836 19 827 ,

4 836 20 827 i 5 838 21 833 f 6 837 22 832 '

7 837 23 823 i 8 835 24 832 ,

9 833 25 829 10 630 26 829  !

11 833 27 821 12 834 28 825 13 832 29 .

14 831 30 15 825 31 16 830 ,

INS'IRUCTICNS +

On this fcrm, list the average daily unit power level PWe-Net for each day in the reparting month. Campute to the nearest whole megawatt.

y _

f. ,

p  :

l- l 1

F ^- OPERATING DATA REPORT l

. DOCKET No.: 50-412 )

F.

REPORT DATE: 03/02/95  !

E COMPLETED BY: DAVID T. JONES .

TELEPHONE: (412) 393-7553 r, -

OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923

.5. DESIGN ELECTRICAL RATING (Net MWe): 836

6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
7. MAX. DEPENDABLE CAPACITY (Net MWe): 820

~ 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:

f

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
11. HOURS IN REPORTING PERIOD: 672.0 1416.0 63855.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 672.0 1416.0 55240.5-
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0  !
14. HOURS CENERATOR WAS ON LINE: 672.0 1416.0 54893.6
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. CROSS THERMAL ENERGY GEN. (MWH): 1771465.0 3700992.0 136222314.0
17. CROSS ELECT. ENERGY GEN. (MWH): 587552.0 1229678.0 44281471.0  :
18. NET ELECTRICAL ENERGY GEN. (MWH): 558397.0 1168449.0 41843454.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0
20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 '

86.0

21. UNIT CAPACITY FACTOR (MDC): PCT 101.3 100.6 79.5
22. UNIT CAPACITY FACTOR (DER): PCT 99.4 98.7 78.4
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.9
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): [

THE UNIT IS SCHEDULED TO SHUTDOVN FOR ITS FIFTH REFUELING OUTAGE ON MARCH 24. 1995. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS. t

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0"'JATION):

I FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A j COMMERCIAL OPERATION N/A N/A f

s; t

lq

.s; <

UNIT SMUTDOWWS AND POWER REDUC 1t0WS (t20%)- Decket Wo. 50-412 Unit game BVPS unit 82 Date March 2. 1995 Completed By David T. Jones REPORT MONTu February 1995 Telephone (4123 393-7553 .

Method of Licensee Cause & Corrective .'

Ouration Shutting Event System Component Action to No. Date Typet (Nours) Reason 2 Down Reactor 3 Report 8 Code 4 Code 5 _ Prevent Recurrence NONE s.

1 2 3 4-F Forced Reason: Method: Exhibit F-Instructions for S Scheduled A-Equipment Feiture (Emptein) 1-Manuel Preparation of-Dete Entry Sheets B-Meintenance or Test 2-Menuet Scram for Licensee Event Report. (LER) File C-Refueling 3 Automatic Scres (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E Operator Training & License Emen 5-Reduction 5 F-Adelnistrative .

9 Other Exhibit N-Sese Source.

G operational Error (Emplain)

N-Other ;imptein)

. - - . . . _ ~ - - . . . . - _ .. ._ .- - .- . . . - . - .. .- ._ _ . , . . . . . _ . . .