ML20082H359: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:h /710 0982-L ILLINDIS POWER COMPANY                 U-10107 ff]    CLINTON POWER STATION, P.O. BOX 678. CLINTON. ILLINOIS 61727 November 23, 1983 Docket No. 50-461
{{#Wiki_filter:h /710 0982-L ILLINDIS POWER COMPANY ff]
[PRINQlPAL STAFF v/RA kPRP                       v   &ll,  -If Mr. James G. Keppler                                       9/RA           DE     f/
U-10107 CLINTON POWER STATION, P.O. BOX 678. CLINTON. ILLINOIS 61727 November 23, 1983 Docket No. 50-461
Regional Administrator, Region III                         A/RA           DRMSF   g       /
[PRINQlPAL STAFF
U.S. Nuclear Regulatory Commission                         RC             ORMA 799 Roosevelt Road                                         PAO             SCS Glen Ellyn, Illinois     60137                             sea a
, -If v/RA kPRP v &ll Mr. James G. Keppler 9/RA DE f/
Regional Administrator, Region III A/RA DRMSF g
/
U.S. Nuclear Regulatory Commission RC ORMA 799 Roosevelt Road PAO SCS Glen Ellyn, Illinois 60137 sea
- a


==Subject:==
==Subject:==
Line 25: Line 29:


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
On November 15, 1982 Illinois Power Company submitted the Illinois Power Company Improvement Program.
On November 15, 1982 Illinois Power Company submitted the Illinois Power Company Improvement Program. A more complete description of the program was contained in the Nuclear Power Program Management Manual which was forwarded to the Nuclear Regulatory Commission Region III office on March 9, 1983.
A more complete description of the program was contained in the Nuclear Power Program Management Manual which was forwarded to the Nuclear Regulatory Commission Region III office on March 9, 1983.
This letter provides the revised completion date for one activity in the Nuclear Power Program Management Manual.
This letter provides the revised completion date for one activity in the Nuclear Power Program Management Manual.
Development of the Illinois Power Company Corporate Nuclear Procedures (CNPs) was originally scheduled for completion by December 31, 1983. We have revised this date to April 30, 1984.
Development of the Illinois Power Company Corporate Nuclear Procedures (CNPs) was originally scheduled for completion by December 31, 1983.
Completion of the CNPs identified to date will satisfy the commitment concerning these documents.         As the project progress-es, additional CNPs that are identified will be scheduled sepa-rately from this commitment.
We have revised this date to April 30, 1984.
Sincerely yours ,
Completion of the CNPs identified to date will satisfy the commitment concerning these documents.
                                        .    . Hall Vice President JRS/j f cc:   USNRC Resident Inspector Director - Office of I&E, Washington, DC 20555 Illinois Department of Nuclear Safety 8312010126 831123 PDR ADOCK 05000461 A               PDR 8* 2 s m3
As the project progress-es, additional CNPs that are identified will be scheduled sepa-rately from this commitment.
                                                                                          % qo a}}
Sincerely yours,
Hall Vice President JRS/j f cc:
USNRC Resident Inspector Director - Office of I&E, Washington, DC 20555 Illinois Department of Nuclear Safety 8312010126 831123 PDR ADOCK 05000461 A
PDR
% qo 8* 2 s m3 a}}

Latest revision as of 07:05, 14 December 2024

Revises Completion Date for Item in Nuclear Power Program Mgt Manual.Corporate Nuclear Procedures Originally Scheduled for Completion by 831231 Extended to 840430
ML20082H359
Person / Time
Site: Clinton 
Issue date: 11/23/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0982-L, 982-L, U-10107, NUDOCS 8312010126
Download: ML20082H359 (1)


Text

h /710 0982-L ILLINDIS POWER COMPANY ff]

U-10107 CLINTON POWER STATION, P.O. BOX 678. CLINTON. ILLINOIS 61727 November 23, 1983 Docket No. 50-461

[PRINQlPAL STAFF

, -If v/RA kPRP v &ll Mr. James G. Keppler 9/RA DE f/

Regional Administrator, Region III A/RA DRMSF g

/

U.S. Nuclear Regulatory Commission RC ORMA 799 Roosevelt Road PAO SCS Glen Ellyn, Illinois 60137 sea

- a

Subject:

Corporate Nuclear Procedures

Dear Mr. Keppler:

On November 15, 1982 Illinois Power Company submitted the Illinois Power Company Improvement Program.

A more complete description of the program was contained in the Nuclear Power Program Management Manual which was forwarded to the Nuclear Regulatory Commission Region III office on March 9, 1983.

This letter provides the revised completion date for one activity in the Nuclear Power Program Management Manual.

Development of the Illinois Power Company Corporate Nuclear Procedures (CNPs) was originally scheduled for completion by December 31, 1983.

We have revised this date to April 30, 1984.

Completion of the CNPs identified to date will satisfy the commitment concerning these documents.

As the project progress-es, additional CNPs that are identified will be scheduled sepa-rately from this commitment.

Sincerely yours,

Hall Vice President JRS/j f cc:

USNRC Resident Inspector Director - Office of I&E, Washington, DC 20555 Illinois Department of Nuclear Safety 8312010126 831123 PDR ADOCK 05000461 A

PDR

% qo 8* 2 s m3 a