ML20082H359
| ML20082H359 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/23/1983 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 0982-L, 982-L, U-10107, NUDOCS 8312010126 | |
| Download: ML20082H359 (1) | |
Text
h /710 0982-L ILLINDIS POWER COMPANY ff]
U-10107 CLINTON POWER STATION, P.O. BOX 678. CLINTON. ILLINOIS 61727 November 23, 1983 Docket No. 50-461
[PRINQlPAL STAFF
, -If v/RA kPRP v &ll Mr. James G. Keppler 9/RA DE f/
Regional Administrator, Region III A/RA DRMSF g
/
U.S. Nuclear Regulatory Commission RC ORMA 799 Roosevelt Road PAO SCS Glen Ellyn, Illinois 60137 sea
- a
Subject:
Corporate Nuclear Procedures
Dear Mr. Keppler:
On November 15, 1982 Illinois Power Company submitted the Illinois Power Company Improvement Program.
A more complete description of the program was contained in the Nuclear Power Program Management Manual which was forwarded to the Nuclear Regulatory Commission Region III office on March 9, 1983.
This letter provides the revised completion date for one activity in the Nuclear Power Program Management Manual.
Development of the Illinois Power Company Corporate Nuclear Procedures (CNPs) was originally scheduled for completion by December 31, 1983.
We have revised this date to April 30, 1984.
Completion of the CNPs identified to date will satisfy the commitment concerning these documents.
As the project progress-es, additional CNPs that are identified will be scheduled sepa-rately from this commitment.
Sincerely yours,
Hall Vice President JRS/j f cc:
USNRC Resident Inspector Director - Office of I&E, Washington, DC 20555 Illinois Department of Nuclear Safety 8312010126 831123 PDR ADOCK 05000461 A
% qo 8* 2 s m3 a