ML20083Q889: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. | ||
0 | 0 Q | ||
Jersey Central PbWd | |||
Mr. A. Giambusso | & Light Oc mpany M ADtSON AVENUE AT PUNCH BOWL RO AD e MORRISTOWN, N.J 07960 e 539 6111 Y | ||
September 28, 1972 | |||
\\\\ | |||
,) | |||
Mr. A. Giambusso O | |||
Washington, D. C. 20545 | N, | ||
( k h fn ' (}. | |||
I)IL 4 l: | |||
Deputy Director for Reactor Projects Lh Directorate of Licensing 9 | |||
United States Atomic Energy Commission OCTo" Ib72* | |||
~ | |||
~~ | |||
Washington, D. C. 20545 y | |||
US G m a 11 | |||
%..hy | |||
==Dear Mr. Giambusso:== | ==Dear Mr. Giambusso:== | ||
h | h Sect ca | ||
==Subject:== | ==Subject:== | ||
Oyster Creek Station Docket No. 50-219 | Oyster Creek Station gy, Docket No. 50-219 Outside Radwaste Tank Activity The purpose of this letter is to report.an incident that occurred at Oyster Creek during which the outside radwaste storage tank activity exceeded the limit of 10 curies as set forth in Technical Specification 3.6.C. | ||
' -During a routine radwaste drumming operation on September 16, 1972, a drum of filter sludge fell from the drum transfer car as-it was being released for storage. | |||
In falling, the drum struck and-damaged the electrical bus work which supplies power to move the drums into the storage aisles. In order to reduce the radiation levels in the area to perform the necessary maintenance work on the transfer car and the electrical bus, the floor area required decontamination. The decontamination was accomplished by washing \\ | |||
levels in the area to perform the necessary maintenance work on the transfer car and the electrical bus, the floor area required decontamination. The decontamination was accomplished by washing \ | the' transfer car floor area into the filter sludge tank. The waste from the decontamination operation was then processed through the centrifuge, and the separated water was further processed through the floor drain treatment system ultimately being stored in floor drain sample tank "B" for sampling prior to discharge. | ||
the' transfer car floor area into the filter sludge tank. The | 10' 3 A routine analysis of the radwaste outside tank activity | ||
] | |||
10' 3 | was made on September 20, 1972, as required by Technical Specifi-cation paragraph 4.6.D, and it indicated a total content of 27.7.4 curies. Of this total activity, 25.1 curies was contained in I | ||
floor drain sample tank "B". | |||
Water was recycled to tanks within k | |||
floor drain sample tank "B". Water was recycled to tanks within | the radwaste facility as space became available; and at 2250 on. | ||
. p(d September 20, 1972, the activity in the outside tanks was less than 10 curies. Recycling was continued until the activity was reduced to less than 5 curies at 0245 on September 22, 1972. | |||
September 20, 1972, the activity in the outside tanks was less than 10 curies. Recycling was continued until the activity was reduced to less than 5 curies at 0245 on September 22, 1972. | Q d k | ||
Q | pn 0303310051 y % 9 PDR ADOCK PDR S | ||
g, 5368 COPY SENT REGION L | |||
a | |||
m 7- | m 7- | ||
.7'..o Mr.k.Giambusso I | |||
Mr.k.Giambusso | Page il l | ||
As I reported in my letter to you dated August 28, 1972, a review committee has been established to compile a report sum l marizing the problems that have been encountered with radwaste operations. Also, the investigation of radwaste problems by an outside consultant is underway with the aim toward making prompt recommendations for immediate corrections to procedures and equipment to reduce the problems in the short-term and permanent modifications to eliminate the problems in the future. | September 28, 1972 As I reported in my letter to you dated August 28, 1972, a review committee has been established to compile a report sum l marizing the problems that have been encountered with radwaste operations. Also, the investigation of radwaste problems by an outside consultant is underway with the aim toward making prompt recommendations for immediate corrections to procedures and equipment to reduce the problems in the short-term and permanent modifications to eliminate the problems in the future. | ||
Forty copies of this report are enclosed for your review. | Forty copies of this report are enclosed for your review. | ||
Very truly yours, (E)ll | Very truly yours, (E)ll Ivan R. Fin ock, Jr. | ||
Ivan R. Fin ock, Jr. | |||
Vice President Pk Enclosur'es I | Vice President Pk Enclosur'es I | ||
cc: Mr. J. P. O'Reilly, Director | cc: Mr. J. P. O'Reilly, Director Directorate of Regulatory Operations, Region 1 e | ||
1 o | |||
1 o | -,s}} | ||
Latest revision as of 05:08, 14 December 2024
| ML20083Q889 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 09/28/1972 |
| From: | Finfrock I JERSEY CENTRAL POWER & LIGHT CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20083Q887 | List: |
| References | |
| NUDOCS 8303310051 | |
| Download: ML20083Q889 (2) | |
Text
.
0 Q
Jersey Central PbWd
& Light Oc mpany M ADtSON AVENUE AT PUNCH BOWL RO AD e MORRISTOWN, N.J 07960 e 539 6111 Y
September 28, 1972
\\\\
,)
Mr. A. Giambusso O
N,
( k h fn ' (}.
I)IL 4 l:
Deputy Director for Reactor Projects Lh Directorate of Licensing 9
United States Atomic Energy Commission OCTo" Ib72*
~
~~
Washington, D. C. 20545 y
US G m a 11
%..hy
Dear Mr. Giambusso:
h Sect ca
Subject:
Oyster Creek Station gy, Docket No. 50-219 Outside Radwaste Tank Activity The purpose of this letter is to report.an incident that occurred at Oyster Creek during which the outside radwaste storage tank activity exceeded the limit of 10 curies as set forth in Technical Specification 3.6.C.
' -During a routine radwaste drumming operation on September 16, 1972, a drum of filter sludge fell from the drum transfer car as-it was being released for storage.
In falling, the drum struck and-damaged the electrical bus work which supplies power to move the drums into the storage aisles. In order to reduce the radiation levels in the area to perform the necessary maintenance work on the transfer car and the electrical bus, the floor area required decontamination. The decontamination was accomplished by washing \\
the' transfer car floor area into the filter sludge tank. The waste from the decontamination operation was then processed through the centrifuge, and the separated water was further processed through the floor drain treatment system ultimately being stored in floor drain sample tank "B" for sampling prior to discharge.
10' 3 A routine analysis of the radwaste outside tank activity
]
was made on September 20, 1972, as required by Technical Specifi-cation paragraph 4.6.D, and it indicated a total content of 27.7.4 curies. Of this total activity, 25.1 curies was contained in I
floor drain sample tank "B".
Water was recycled to tanks within k
the radwaste facility as space became available; and at 2250 on.
. p(d September 20, 1972, the activity in the outside tanks was less than 10 curies. Recycling was continued until the activity was reduced to less than 5 curies at 0245 on September 22, 1972.
Q d k
pn 0303310051 y % 9 PDR ADOCK PDR S
g, 5368 COPY SENT REGION L
a
m 7-
.7'..o Mr.k.Giambusso I
Page il l
September 28, 1972 As I reported in my letter to you dated August 28, 1972, a review committee has been established to compile a report sum l marizing the problems that have been encountered with radwaste operations. Also, the investigation of radwaste problems by an outside consultant is underway with the aim toward making prompt recommendations for immediate corrections to procedures and equipment to reduce the problems in the short-term and permanent modifications to eliminate the problems in the future.
Forty copies of this report are enclosed for your review.
Very truly yours, (E)ll Ivan R. Fin ock, Jr.
Vice President Pk Enclosur'es I
cc: Mr. J. P. O'Reilly, Director Directorate of Regulatory Operations, Region 1 e
1 o
-,s