ML20084J154: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Y I P | {{#Wiki_filter:Y I | ||
P Western Union. | |||
' ~~ | |||
l | l I | ||
_LDO26 PDF TDVE CORDOVA ILL DEC 2 100P CST | |||
_LDO26 | ~ | ||
GLEN ELLYN ILL 60137 REFERENCE QUAD-CITIES NUCLEAR POWER STATION DPR-30 APPENDIX A SECTION 1.0.1.4. AND 6.6. A.3. AT 10:00PM ON DECEMBER 1ST 1972 WiTH THE UNIT AT 90 PER C NT THERMAL POWER R.C.i.C. ISOLATION VALVE 1301-17 FAILED TO CLESE DURING THE MONTHLY SURVEILLANCE TEST. VALVE 1301-16 WAS CLOSED AND THE HPCI SYSTEM WAS TESTED AND FOUND TO BE OPERABLE. | E JORDAN REGION 3 COMPLIANCE JS ATOMIC ENERGY C0fMISS10N 799 ROOSEVELT-RD GLEN ELLYN ILL 60137 REFERENCE QUAD-CITIES NUCLEAR POWER STATION DPR-30 APPENDIX A SECTION 1.0.1.4. AND 6.6. A.3. AT 10:00PM ON DECEMBER 1ST 1972 WiTH THE UNIT AT 90 PER C NT THERMAL POWER R.C.i.C. | ||
ANN J KALIVIANAKIS | ISOLATION VALVE 1301-17 FAILED TO CLESE DURING THE MONTHLY SURVEILLANCE TEST. VALVE 1301-16 WAS CLOSED AND THE HPCI SYSTEM WAS TESTED AND FOUND TO BE OPERABLE. | ||
ANN J KALIVIANAKIS | |||
/ | |||
u,a r,a | ? | ||
nf | go9s9]5 u,a r,a nf C l Y | ||
i S}} | ib | ||
) | |||
4 i | |||
S}} | |||
Latest revision as of 04:31, 14 December 2024
| ML20084J154 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 12/02/1972 |
| From: | Kalivianakis N COMMONWEALTH EDISON CO. |
| To: | Jordan E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084J139 | List: |
| References | |
| NUDOCS 8305120202 | |
| Download: ML20084J154 (1) | |
Text
Y I
P Western Union.
' ~~
l I
_LDO26 PDF TDVE CORDOVA ILL DEC 2 100P CST
~
E JORDAN REGION 3 COMPLIANCE JS ATOMIC ENERGY C0fMISS10N 799 ROOSEVELT-RD GLEN ELLYN ILL 60137 REFERENCE QUAD-CITIES NUCLEAR POWER STATION DPR-30 APPENDIX A SECTION 1.0.1.4. AND 6.6. A.3. AT 10:00PM ON DECEMBER 1ST 1972 WiTH THE UNIT AT 90 PER C NT THERMAL POWER R.C.i.C.
ISOLATION VALVE 1301-17 FAILED TO CLESE DURING THE MONTHLY SURVEILLANCE TEST. VALVE 1301-16 WAS CLOSED AND THE HPCI SYSTEM WAS TESTED AND FOUND TO BE OPERABLE.
ANN J KALIVIANAKIS
/
?
go9s9]5 u,a r,a nf C l Y
ib
)
4 i
S