ML20084S954: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_ _. .__ _        _________ _ _ _ _ _ _ _ _
{{#Wiki_filter:_ _..__ _
                                                                              /,,                                   Q,)
/,,
n r                            ,
Q,)
s I
r n
                                                                      /f                                   ,
s
i CORSum8f8 Power F,:                                   .
/f CORSum8f8 I
Company Dh                         U o n. .i omc..: oss w..e u cn4a.n 4venu . .>=cm.on. uien.a.n 4osoi . area coo. sir 7s8.osso March 29, 1974 Mr. John F. O' Leary, Director                                                                     Re: Docket 50-255 Directorate of Licensing                                                                                 License DPR 20 US Atomic Energy Commission                                                                             Palisades Plant Washington, DC 205h5
i Power F,:
Company Dh U
o n..i omc..: oss w..e u cn4a.n 4venu..>=cm.on. uien.a.n 4osoi. area coo. sir 7s8.osso March 29, 1974 Mr. John F. O' Leary, Director Re: Docket 50-255 Directorate of Licensing License DPR 20 US Atomic Energy Commission Palisades Plant Washington, DC 205h5


==Dear Mr. O' Leary:==
==Dear Mr. O' Leary:==
 
On March 20, 1974 representatives of the Directorate of Regulatory Operations, Region III were informed by telephone that a deficiency existed in the actual set points of the Palisades Plant secondary relief valves and that this deficiency would be corrected prior to returning tne plant to service. The report was made at that time be.:ause it was wncluded that the Technical Specifications, Section 317, Paragraph (c) which stated that the i
On March 20, 1974 representatives of the Directorate of Regulatory Operations, Region III were informed by telephone that a deficiency existed in the actual set points of the Palisades Plant secondary relief valves and that this deficiency would be corrected prior to returning tne plant to service. The report was made at that time be.:ause it was wncluded that the Technical Specifications, Section 317, Paragraph (c) which stated that the i                 valves will be set between 985 and 1025 psig was in error. This conclusion was based on the fact that the FSAR (Section 4.3.4, Table 4-4) and Section 2.2 of the Technical Specifications listed the set points with the same numerical values but in pounds per square inch absolute instead of gage. Since that time, it has been concluded that valve set point pressures of between 985 and 1025 psic (or the equivalent absolute pressures) were used in the design, procurement and raalysis of the Palisades Plant. This con-clusion was based on a review of mechanical design information and the set points input into the safety analysis of the Palisades FSAR.
valves will be set between 985 and 1025 psig was in error. This conclusion was based on the fact that the FSAR (Section 4.3.4, Table 4-4) and Section 2.2 of the Technical Specifications listed the set points with the same numerical values but in pounds per square inch absolute instead of gage. Since that time, it has been concluded that valve set point pressures of between 985 and 1025 psic (or the equivalent absolute pressures) were used in the design, procurement and raalysis of the Palisades Plant. This con-clusion was based on a review of mechanical design information and the set points input into the safety analysis of the Palisades FSAR.
We have concluded that the use of absolute pressures with the set points for these valves that are specified in the FSAR and sections of the Technical Specifications, other than 3.1.7, Para-graph (c), was an editorial error. The valves are now, and have been in the past, set to the proper set point (985 to 1025 psig).
We have concluded that the use of absolute pressures with the set points for these valves that are specified in the FSAR and sections of the Technical Specifications, other than 3.1.7, Para-graph (c), was an editorial error. The valves are now, and have been in the past, set to the proper set point (985 to 1025 psig).
A Technical Specifications change vill be proposed to correct the editorial errors.
A Technical Specifications change vill be proposed to correct the editorial errors.
Yours very truly, A
Yours very truly, A
Ralph B. Sewell (Signed)                 i     t?
Ralph B. Sewell (Signed) i t?, k' i
i t-
/
                                                                                                                                              /  , k'
t-
                                                                                                                                              /t RBS/mel                                                                     Ralph B. Sewell                               b CC: JGKeppler, USAEC                                                                                                             272U B306200311 740329 PDR ADOCK 05000255 t                                                                             _ _ _ _ _ _ _ . _ _ _            _ _ _              -}}
/t RBS/mel Ralph B. Sewell b
CC: JGKeppler, USAEC 272U B306200311 740329 PDR ADOCK 05000255 t
-}}

Latest revision as of 04:00, 14 December 2024

Ro:Util Informed That Deficiency Existed in Actual Setpoints of Secondary Relief Valves.Use of Absolute Pressure W/Setpoints for Valves Specified in FSAR & Tech Specs Determined to Be Editorial Error.Valves Reset
ML20084S954
Person / Time
Site: Palisades 
Issue date: 03/29/1974
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8306200311
Download: ML20084S954 (1)


Text

_ _..__ _

/,,

Q,)

r n

s

/f CORSum8f8 I

i Power F,:

Company Dh U

o n..i omc..: oss w..e u cn4a.n 4venu..>=cm.on. uien.a.n 4osoi. area coo. sir 7s8.osso March 29, 1974 Mr. John F. O' Leary, Director Re: Docket 50-255 Directorate of Licensing License DPR 20 US Atomic Energy Commission Palisades Plant Washington, DC 205h5

Dear Mr. O' Leary:

On March 20, 1974 representatives of the Directorate of Regulatory Operations, Region III were informed by telephone that a deficiency existed in the actual set points of the Palisades Plant secondary relief valves and that this deficiency would be corrected prior to returning tne plant to service. The report was made at that time be.:ause it was wncluded that the Technical Specifications, Section 317, Paragraph (c) which stated that the i

valves will be set between 985 and 1025 psig was in error. This conclusion was based on the fact that the FSAR (Section 4.3.4, Table 4-4) and Section 2.2 of the Technical Specifications listed the set points with the same numerical values but in pounds per square inch absolute instead of gage. Since that time, it has been concluded that valve set point pressures of between 985 and 1025 psic (or the equivalent absolute pressures) were used in the design, procurement and raalysis of the Palisades Plant. This con-clusion was based on a review of mechanical design information and the set points input into the safety analysis of the Palisades FSAR.

We have concluded that the use of absolute pressures with the set points for these valves that are specified in the FSAR and sections of the Technical Specifications, other than 3.1.7, Para-graph (c), was an editorial error. The valves are now, and have been in the past, set to the proper set point (985 to 1025 psig).

A Technical Specifications change vill be proposed to correct the editorial errors.

Yours very truly, A

Ralph B. Sewell (Signed) i t?, k' i

/

t-

/t RBS/mel Ralph B. Sewell b

CC: JGKeppler, USAEC 272U B306200311 740329 PDR ADOCK 05000255 t

-