ML20086H967: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
AVERAGE DAILY UNIT' POWER LEVEL Docket No. 50-311 Unit Name   Salem # 2 Date     Jan.10, 1984 LCcmp.leted by. L. K. Miller                               Telephone 609-935-6000 Extension 4455 Month     December 1983 Day Average Daily Power Level               Day Average Daily Power Level (MWe-NET)                                   (MWe-NET) 1         0                                 16         0 2         0                                 17         0 3         0                                 18         0 4         0                                 19         0 5         0                                 20         0
AVERAGE DAILY UNIT' POWER LEVEL Docket No.
  '6         0                                 21         0 7~       0                                 22         0   __
50-311 Unit Name Salem # 2 Date Jan.10, 1984 LCcmp.leted by.
8         0                                 23         0 9       0                                 24         0 10       0                                 25         0 1
L.
11       0                                 26         0 12       0                                 27     ,_ ,
K. Miller Telephone 609-935-6000 Extension 4455 Month December 1983 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)
0 13       0                                 28         0 14       0                                 29         0 15       0                                 30         0 Pg. 8,1-7 R1 8401230004 831231 DRADOCK05000g I
(MWe-NET) 1 0
Page 2 of 16                           g M1 4
16 0
2 0
17 0
3 0
18 0
4 0
19 0
5 0
20 0
'6 0
21 0
7~
0 22 0
8 0
23 0
9 0
24 0
10 0
25 0
1 11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
Pg. 8,1-7 R1 8401230004 831231 DRADOCK05000g I
Page 2 of 16 g M1 4


4 s
4 s
OPERATING DATA REPORT
OPERATING DATA REPORT
                                                                            ' Docket No. 50-311-
' Docket No.
_Date-     Jan.10, 1984
50-311-
_Date-Jan.10, 1984
~
~
                    . ,                                                      Telephone     935-6000
Telephone 935-6000 Completed-by.
  't  Completed-by.             L. K. Miller                               Extension     445L
L. K. Miller Extension 445L
      ~ Operating Status I?. Unit'Name                               Salem No. 2     Notes
't
      ;2.       Reporting Period                 .
~ Operating Status I?.
December 1983
Unit'Name Salem No. 2 Notes
      '3.       Licensed Thermal Power _(MWt)                     3411
;2.
      '4.     Nameplate Rating (Gross. MWe).                     1162 (5. Design Electrical Rating - (Net Mue)                     TIT 5 61 Maximum Dependable Capacity (Gross MWe)1149
Reporting Period December 1983
.        7 . -- Maximum' Dependable Capacity (Net MWe) 1106
'3.
      ' 8 .'   If Changes Occur in. Capacity Ratings (ltems 3 through 7) since Last Report, Give Reason
Licensed Thermal Power _(MWt) 3411
                                -N/A
'4.
: 9. Power: Level to Which Restricted, if any (Net MWe)                     N/A
Nameplate Rating (Gross. MWe).
: 10. Reasons for Bestrictions, if any                               N/A This Month   Year to Dnte     Cumulative 113 Hours'in Reporting Period'                       744             8760           19466 12.-No. of Hrs. Reactor was. Critical'                 O             1252.9         11708.5
1162 (5.
: 13. ' Reactor Reserve Shutdown Hrs.                   -744           2054.1           2090.6 t-       14.LHours Generator On-Line                             0             1080.1         11417.3
Design Electrical Rating - (Net Mue)
: 15. Unit Reserve Shutdown Hours                         0                 0               0
TIT 5 61 Maximum Dependable Capacity (Gross MWe)1149 7. -- Maximum' Dependable Capacity (Net MWe) 1106
: 16. Gross Thermal Energy Generated
' 8.'
              .              (MWH)                             0         2954523         33471072
If Changes Occur in. Capacity Ratings (ltems 3 through 7) since Last Report, Give Reason
      '17.' Gross.Elec. Energy Generated
-N/A 9.
                            - (MWE)                             0         852040         10868290
Power: Level to Which Restricted, if any (Net MWe)
: 18. Net Elec. Energy Generated - (MWH)             (4102)         743604         10317251
N/A
:19. Unit Service Factor                                 0               12.3             58.7 20., Unit Availability Factor                           0               12.3             58.7
: 10. Reasons for Bestrictions, if any N/A This Month Year to Dnte Cumulative 113 Hours'in Reporting Period' 744 8760 19466 12.-No. of Hrs. Reactor was. Critical' O
.    ' 21. Unit Capacity -Factor
1252.9 11708.5
.                        (using MDC Net)                         0                 7.7           47.9
: 13. ' Reactor Reserve Shutdown Hrs.
    - 22. Unit Capacity Factor (using DER Net)                         0                 7.6             47.5
-744 2054.1 2090.6 t-14.LHours Generator On-Line 0
:23. Unit Forced Outage Rate                         100                 75.6             24.5-24.-Shutdowns-scheduled over next 6 months (type, date and duration of each)
1080.1 11417.3
: 15. Unit Reserve Shutdown Hours 0
0 0
: 16. Gross Thermal Energy Generated (MWH) 0 2954523 33471072
'17.' Gross.Elec. Energy Generated
- (MWE) 0 852040 10868290
: 18. Net Elec. Energy Generated - (MWH)
(4102) 743604 10317251
:19. Unit Service Factor 0
12.3 58.7 20., Unit Availability Factor 0
12.3 58.7
' 21. Unit Capacity -Factor (using MDC Net) 0 7.7 47.9
- 22. Unit Capacity Factor (using DER Net) 0 7.6 47.5
:23. Unit Forced Outage Rate 100 75.6 24.5-24.-Shutdowns-scheduled over next 6 months (type, date and duration of each)
N/A
N/A
: 25. If shutdown at end of. Report Period, Estimated Date of Startup:
: 25. If shutdown at end of. Report Period, Estimated Date of Startup:
2-10-84
2-10-84
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast         Achieved Initial Criticality       6/30/80         8/2/80 Initial Electricity       9/1/80         6/3/81 Commercial Operation       9/24/80         10/13/81 8-1-7.R2 4
Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2 4
Page 3 of 16
Page 3 of 16


UNIT SHUTDOWN AND POWER REDUCTIONS               Dockht No. 50-311' REPORT MONTH DECEMBER 1983                     ~ Unit - Ntme Sal:tm No.2   .
UNIT SHUTDOWN AND POWER REDUCTIONS Dockht No. 50-311' REPORT MONTH DECEMBER 1983
Date         Jan. 10, 1984 Completed by   L.K. Miller                                                                   ' Telephone' 609-935-6000 Extension 4455-             -
~ Unit - Ntme Sal:tm No.2 Date Jan. 10, 1984 Completed by L.K. Miller
Method of Duration                     ' Shutting   ' License                           Cause and Corrective No.     -Date   Type   . Hours             Reason   Down       Event     System. Ccmponent             Action to 1                           2     Rea ctor     Report   Code 4     Code 5       . Prevent Recurrence Stator Core A          4                  'HA       GENERA         Iron Generator 83-116   11/17   F       '744                                       -
' Telephone' 609-935-6000 Extension 4455-Method of Duration
2 Reason                                               3 Method             4 Exhibit G       5 Exhibit 1 1
' Shutting
F: Forced           A-Equipment Failure-explain                           1-Manual             Instructions Salem as S: Scheduled       B-Maintenance or Test                                 2-Manual Scram,       for Prepara- Source C-Refueling                                           3-Automatic Scram. tion of Data D-Regulatory Restriction                             4-Continuation of Entry Sheets E-Operator Training & Licensing Exam                   Previous Outage for Licensee-F-Administrative                                     5-Load Reduction     Event Report G-Operational Error-explain                           9-Other               (LER) File H-Other-explain                                                             (NUREG 0161)
' License Cause and Corrective Action to No.
-Date Type
. Hours Reason Down Event System.
Ccmponent
. Prevent Recurrence 1
2 Rea ctor Report Code 4 Code 5 Stator Core
'HA GENERA Iron Generator 83-116 11/17 F
'744 A
4 1
2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram, for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee-F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)
Page 4 of 16
Page 4 of 16


MAJOR PLANT MODIFICATIONS                                                                                 N                     N                                                       "
MAJOR PLANT MODIFICATIONS N
REPORT MONTE                              DECEMBER 1983
N
                                                                                  ~
~
UNIT NAME:           SEM2                                           _
UNIT NAME:
                          .                                                                                                          DATE:         JANUARY:10, 1984                               ,
SEM2 REPORT MONTE DECEMBER 1983 DATE:
COMPLETED BY:           L. K. MILLER TELEPHONE:             (609) 339-4455
JANUARY:10, 1984 COMPLETED BY:
        .0               *DCR No.-                             PRINCIPLE SYSTEM                                                               SUBJECT 2EC-0765A- Control Room Air                                                                     Modify CAACS and EACS systems to Conditioning / Chilled                                           comply with requirements of controls Water                                                           DM-S-12, Par. 5.4 (page 7).
L. K. MILLER TELEPHONE:
t 2EC-1054                       Penetration Area                                                 Install four high temperature
(609) 339-4455
;                                                      Ventilation                                                     thermostats in the penetration area-two are located on El. 78' in the                             -
.0
Mechanical Penetration Area and two are located in the area above on El. 100'.
*DCR No.-
2EC-1073                       Fuel Transfer System                                             Change wiring on system to correct y
PRINCIPLE SYSTEM SUBJECT 2EC-0765A-Control Room Air Modify CAACS and EACS systems to Conditioning / Chilled comply with requirements of controls Water DM-S-12, Par. 5.4 (page 7).
problem of both pit side and
t 2EC-1054 Penetration Area Install four high temperature Ventilation thermostats in the penetration area-two are located on El. 78' in the Mechanical Penetration Area and two are located in the area above on El. 100'.
:                                                                                                                        reactor side winch position
2EC-1073 Fuel Transfer System Change wiring on system to correct problem of both pit side and y
;                                                                                                                        indicators energizing simultaneously when transferring. fuel.
reactor side winch position indicators energizing simultaneously when transferring. fuel.
2ET-1645                       Safety Injection                                                 This test is required to determine feasibility of testing the 2SJ4 and 2SJS valves without violating i                                                                                                                       Technical Specification S/4.5.4.1 s                                                                                                              and to ensure that these valves will operate under anticipated delta P. conditions.                 The 2SJ4 and 2SJ5 valves are required to open on a safety injection signal.
2ET-1645 Safety Injection This test is required to determine feasibility of testing the 2SJ4 and 2SJS valves without violating i
2SC-0530                       Condensate Polishing                                             Revise " Condensate Polishing Partial Bypass Alert" alarm circuit so that alarm is received when ?CN190 valve is open and any 21/22/23CN108 valve.
Technical Specification S/4.5.4.1 and to ensure that these valves s
will operate under anticipated delta P. conditions.
The 2SJ4 and 2SJ5 valves are required to open on a safety injection signal.
2SC-0530 Condensate Polishing Revise " Condensate Polishing Partial Bypass Alert" alarm circuit so that alarm is received when ?CN190 valve is open and any 21/22/23CN108 valve.
is not fully shut.
is not fully shut.
:                        2SC-0627                       Diesel Generators                                                 Relocate the lube oil and jacket (2A, 2B, 2C)                                                     water switches from the diesel skid to a remote area.
2SC-0627 Diesel Generators Relocate the lube oil and jacket (2A, 2B, 2C) water switches from the diesel skid to a remote area.
4 2SC-0683                       E-H Control Oil System                                           Replace tubing on'E-H System with heavy wall S.S. pipe.                                      .
4 2SC-0683 E-H Control Oil System Replace tubing on'E-H System with heavy wall S.S. pipe.
i
i
* DESIGN'GHANGE REOUEST 9-1-7.R1 i                                                                                    Page 5 of 16 i
* DESIGN'GHANGE REOUEST 9-1-7.R1 Page 5 of 16 i
n   ,,.    , ~ - - , , , , , - ..- ,-.
i n
                                                  ,,-n,   ..,-,--+--mn -,n,,-,..,   ,ve---n-. . , , -,...-.m,n,,-m.gew,--,,         mm.,.--~m5.,-wa,v,-,-. r   -- - , - , - - e     gy -g~-,-   ev--m
, ~ - -,,,,, -
,,-n,
..,-,--+--mn
-,n,,-,..,
,ve---n-..,,
-,...-.m,n,,-m.gew,--,,
mm.,.--~m5.,-wa,v,-,-.
r
-- -, -, - - e gy
-g~-,-
ev--m


            ~~
~~
e
e MAJOR' PLANT MODIFICATIONS DOCKET NO.:
* MAJOR' PLANT MODIFICATIONS                                                         DOCKET NO.:               50-311
50-311
                  ' REPORT MONTH                 DECEMBER                                             UNIT NAME:               Salem 2 DATE:                   January 10, 1984 COMPLETED'BY:               L.K. Miller TELEPHONE:               609/339-4455 DCR.NO.-                   10CFR 50.59                                           SAFETI EVALUATION 2EC-0765A: Provision of the' corridor, as required by the NRC, with filtered air from the EACS increases plant safety in all modes of operation. No unreviewed safety or environmental questione are involved.
' REPORT MONTH DECEMBER UNIT NAME:
2EC-1054               The addition of these thermostats will not affect any
Salem 2 DATE:
                                                                                                ~                      ~
January 10, 1984 COMPLETED'BY:
plant process or environmental impact, nor will it create
L.K. Miller TELEPHONE:
                                            ' any new safety' hazards.                              No unreviewed safety or environmental questions are involved.
609/339-4455 DCR.NO.-
2EC-1073              Implement'ation of=this DCR will not create any new safety
10CFR 50.59 SAFETI EVALUATION 2EC-0765A: Provision of the' corridor, as required by the NRC, with filtered air from the EACS increases plant safety in all modes of operation.
                                            ' hazards.                No unreviewed safety or environmental questions are involved..
No unreviewed safety or environmental questione are involved.
2EC-1645'              Implementation of this DCR'will not create any new safety
2EC-1054 The addition of these thermostats will not affect any plant process or environmental impact, nor will it create
                                            ' hazards or alter plant effluent discharge.         _
~
~
' any new safety' hazards.
No unreviewed safety or environmental questions are involved.
No unreviewed safety or environmental questions are involved.
2SC-0530               This design change is not_ safety related and does not y                                            affect _ the safe shutdown of, the unit.                                         Ik) unreviewed safety or environmental questions are involved.
2EC-1073 Implement'ation of=this DCR will not create any new safety
2SC-0627               The relocation of the switches will reduce the' amount the vibration they are subject 1to.                                 No.unreviewed safety or environmental questions--are involved.
' hazards.
,                    2SC-0683_             'This design change will eliminate forced outages due to t                                             tubing failures. No~unreviewed safety or environmental questions are involved.
No unreviewed safety or environmental questions are involved..
,.                  -*DCR - Design Change Request i
2EC-1645' Implementation of this DCR'will not create any new safety
' hazards or alter plant effluent discharge.
No unreviewed safety or environmental questions are involved.
2SC-0530 This design change is not_ safety related and does not affect _ the safe shutdown of, the unit.
Ik) unreviewed y
safety or environmental questions are involved.
2SC-0627 The relocation of the switches will reduce the' amount the vibration they are subject 1to.
No.unreviewed safety or environmental questions--are involved.
2SC-0683_
'This design change will eliminate forced outages due to t
tubing failures.
No~unreviewed safety or environmental questions are involved.
-*DCR - Design Change Request i
ff l-t e
ff l-t e
Page 6 of.16
Page 6 of.16


m       a i                                                         PSE&G SALEM GENERATING SDEION:
m a
i PSE&G SALEM GENERATING SDEION:
SAFETY REIATED WORK CEDER IOG -
SAFETY REIATED WORK CEDER IOG -
(;
(;
j                                                                                                                                   .i
j
  '                                                                    SAI2M UNIT 2 -                                                       .,
.i SAI2M UNIT 2 -
,    WO NO   DEPT WIT EQUIPBENT IudenrICATIm                                                                                           _
WO NO DEPT WIT EQUIPBENT IudenrICATIm
)     940966       CD           2   PMS 2R41A GANNEL IEICATES FAIIED. 831122.
)
4 FAIIURE DESCRIPTIW:                                                                                        '
940966 CD 2
  ?                                                                                                                               - .
PMS 2R41A FAIIURE DESCRIPTIW:
,                                    CORRECTIVE PCTION:       REPIACED DITE IN IN RAM BATTERY CIRCUIT T CONTRnrIER. REPIACED BAD 7800       n
GANNEL IEICATES FAIIED. 831122.
,                                                          ,PRm. RETEST SAT. 831122.
4
934093       MD           2   FIRE BARRIERS
?
!                                    FAIIURE DESCRIPTIW:     REPAIR FIRE BARRIERS IOCATED WILE PEREDRMING PENEfRATIN INSPECTIO. 830819.-
CORRECTIVE PCTION:
REPIACED DITE IN IN RAM BATTERY CIRCUIT T CONTRnrIER. REPIACED BAD 7800 n
,PRm. RETEST SAT. 831122.
i 934093 MD 2
FIRE BARRIERS FAIIURE DESCRIPTIW:
REPAIR FIRE BARRIERS IOCATED WILE PEREDRMING PENEfRATIN INSPECTIO. 830819.-
4 2
4 2
FTTJFn HOLES WITH SE!CO PR855 SIIJCON FOAM AFTER DAPMING UP WITH KAOW000 CCRRECTIVE ACTION:
CCRRECTIVE ACTION:
I                                                            REFRACIORY FIBER. -830819.
FTTJFn HOLES WITH SE!CO PR855 SIIJCON FOAM AFTER DAPMING UP WITH KAOW000 I
i     934063       MD             2 FIRE BARRIERS i
REFRACIORY FIBER. -830819.
PERFORM PHYSICAL INSPECTIW T ALL LNIT 2 FIRE BARRIER PENEFRATINS.- 830517. o FAILURE DESCRIPTIN:
i 934063 MD 2
i CORRECTIVE ACTION:       INSPECTED APPROPRIATE FIRE BARRIERS. REPAIRS TO BE MADE UOER WO #934093.
FIRE BARRIERS i
FAILURE DESCRIPTIN:
PERFORM PHYSICAL INSPECTIW T ALL LNIT 2 FIRE BARRIER PENEFRATINS.- 830517.
o i
CORRECTIVE ACTION:
INSPECTED APPROPRIATE FIRE BARRIERS. REPAIRS TO BE MADE UOER WO #934093.
830819.
830819.
!    937078       OD             2 23 CG T. FAN COIL UNIT i
937078 OD 2
23 CECU STARTED IN SIDW SPEED AIO BKR TRIPPED IPNEDIATELY. CFCU HAD BEEN FAILURE DESCRIPTICH:
23 CG T. FAN COIL UNIT i
RUtNING IN FAST SPEED. INVESTIGATIm SHOWED SHUNT BKR REMAINED CLOSED.
FAILURE DESCRIPTICH:
23 CECU STARTED IN SIDW SPEED AIO BKR TRIPPED IPNEDIATELY. CFCU HAD BEEN RUtNING IN FAST SPEED. INVESTIGATIm SHOWED SHUNT BKR REMAINED CLOSED.
830828.
830828.
4 CORRECTIVE ACTICN:       EHUNP BKR TRIP COIL FOUtO SHORTED. REPLACED WITH LIKE KIND. TESTED SAT.
CORRECTIVE ACTICN:
830901.
EHUNP BKR TRIP COIL FOUtO SHORTED. REPLACED WITH LIKE KIND. TESTED SAT.
4 830901.
]
]
!      937250     CD             2 CCNr. AIR IOCK EL 130 1
937250 CD 2
FAILURE DESCRIPTIW:     OUTER DOOR HAS EXCESSIVE AIR IEAK. 830831.
CCNr. AIR IOCK EL 130 1
Cut <mJnVE ACTION:     RESET DOOR SEAL. 830831.
FAILURE DESCRIPTIW:
f
OUTER DOOR HAS EXCESSIVE AIR IEAK.
.      938193       CD             2 23 CHARGING FUMP l
830831.
FAIIURE DESCRIPTIN:     INNER PISim GLAt0 LEAKING BADLY. SEAL TANK IS OVERFIDWIE. 830809.
Cut <mJnVE ACTION:
I i                                     CutwEunVE ACTION:       REPACKED 31 CYLINER AND REPIACED PIONGER. 830824.
RESET DOOR SEAL.
830831.
f 938193 CD 2
23 CHARGING FUMP l
FAIIURE DESCRIPTIN:
INNER PISim GLAt0 LEAKING BADLY. SEAL TANK IS OVERFIDWIE. 830809.
I i
CutwEunVE ACTION:
REPACKED 31 CYLINER AND REPIACED PIONGER.
830824.
l Page 7 of 16
l Page 7 of 16


P S E & G S M GENEPATING STATIN.
P S E & G S M GENEPATING STATIN.
SAFETY REIATED NGK CIIDER LOG
SAFETY REIATED NGK CIIDER LOG SAIIM UNIT 2
                                                                                ~
~
SAIIM UNIT 2 WO NO     DEPT WIT EQUIP!ENT IuDenrICATIm 938809 CD           2 24MS10 A'IMOS. . RELIEF FAILURE DESCRIPTIN:             VALVE IIAKING BY. 830820.                                                      .
WO NO DEPT WIT EQUIP!ENT IuDenrICATIm 938809 CD 2
Cuto<tL'nVE ACTION:             REMNED VALVE, 'IOOK CUT CN SEAT, DISC AND IAPPED. BLUE CHECKED AIO
24MS10 A'IMOS.. RELIEF FAILURE DESCRIPTIN:
* REASSDmi.m. 830825.
VALVE IIAKING BY.
938950     CD       2 CWr. AIR IDCK EL 100 FAILURE DESCRIPTIW:             EXTERIm DOOR HAS EXCESSIVE IIAKAGE. 830815.
830820.
Cuto<tL'nVE ACTION:             REPIACED CUTER SEAL IN CUPER DOOR. 830815.
Cuto<tL'nVE ACTION:
938858     OD       2   21 BA TRANSFER PUMP FAILURE DESCRIPTIW:             PUMP NOUID NOT DEVE[DPE ADEQUATE DISCHAIGE PRESSURE 'IO PASS 405P. 830825.
REMNED VALVE, 'IOOK CUT CN SEAT, DISC AND IAPPED. BLUE CHECKED AIO REASSDmi.m.
cut <FEI'nVE ACTION:           REBUILT PWP, REINSTAT.T.m AND ALINED. 830901.
830825.
935026     MD       2   23 CHARGING Pm P FAILURE DESCRIPTIW:           PUMP HAS PilIMARY PICKING LEAK. 831021.
938950 CD 2
Cutc<tL'nVE ACTION:           REPACKED #4 AND #5 CYT TNDERS. 831026.
CWr. AIR IDCK EL 100 FAILURE DESCRIPTIW:
926486     Mr       2   23SW44, DTFRETS FAILURE DESCRIPTIW:           INSPECT IAW NRC BULLYfIN 83-03 FOR ANY INTERNAL ABNNMALITIES AND ASSURE FLAPPER HAS FREEDW T MOVEMENT. 830412.
EXTERIm DOOR HAS EXCESSIVE IIAKAGE. 830815.
CORRHXIVE ACTIW:             RENOVED VALVE, INSPECTED AND REPLACED. 031105.
Cuto<tL'nVE ACTION:
927395     MD       2   2C VITAL 230V BKRS FAILURE DESCRIPTIW:           REMOVE ALL 230V BKRS, CLEAN & TEST PER M30, M3Z. CLEAN ALL BKR CUBICLES.
REPIACED CUTER SEAL IN CUPER DOOR.
830815.
938858 OD 2
21 BA TRANSFER PUMP FAILURE DESCRIPTIW:
PUMP NOUID NOT DEVE[DPE ADEQUATE DISCHAIGE PRESSURE 'IO PASS 405P. 830825.
cut <FEI'nVE ACTION:
REBUILT PWP, REINSTAT.T.m AND ALINED.
830901.
935026 MD 2
23 CHARGING Pm P FAILURE DESCRIPTIW:
PUMP HAS PilIMARY PICKING LEAK.
831021.
Cutc<tL'nVE ACTION:
REPACKED #4 AND #5 CYT TNDERS. 831026.
926486 Mr 2
23SW44, DTFRETS FAILURE DESCRIPTIW:
INSPECT IAW NRC BULLYfIN 83-03 FOR ANY INTERNAL ABNNMALITIES AND ASSURE FLAPPER HAS FREEDW T MOVEMENT.
830412.
CORRHXIVE ACTIW:
RENOVED VALVE, INSPECTED AND REPLACED. 031105.
927395 MD 2
2C VITAL 230V BKRS FAILURE DESCRIPTIW:
REMOVE ALL 230V BKRS, CLEAN & TEST PER M30, M3Z. CLEAN ALL BKR CUBICLES.
830215.
830215.
CORRECTIVE ACTIW:             REMNED, CLEANED, INSPECTED AND REPAIRED AS NE'ESSARY 230V BKRS IN C BUS. 2C2Y AND 2C10Y WTT.T. E CmFIEEED AT ANOTHER TIME. 830706.                             _
CORRECTIVE ACTIW:
Page 8 of 16
REMNED, CLEANED, INSPECTED AND REPAIRED AS NE'ESSARY 230V BKRS IN C BUS. 2C2Y AND 2C10Y WTT.T. E CmFIEEED AT ANOTHER TIME.
                                                . _ - .              . _ _ _                                                              l
830706.
Page 8 of 16 l


P 50E & G SALEM GENERATING STATIN SAFC1Y REIATED WORK GDER IOG SAIfti UNIT 2 WO NO   DEPT WIT EQUIPMENE IDENTIFICATIm 924133   Or   2   RELIEF VALVE 2RH3 FAILURE DESCRIPTICN:     PERFORM IJFf SET TEST 0:12RII3 USING M17E. LIFF SEP PRESSURE 'IO BE 375 PSIG PER DCR 2SC-1245. 830908.
P 50E & G SALEM GENERATING STATIN SAFC1Y REIATED WORK GDER IOG SAIfti UNIT 2 WO NO DEPT WIT EQUIPMENE IDENTIFICATIm 924133 Or 2
TIRECTIVE PCTIN:         SET VALVE 'IO 380 PSI. 830915.
RELIEF VALVE 2RH3 FAILURE DESCRIPTICN:
933236   IC   2   R'ID, NARROW RANGE FAILURE DESCRIPTICN:     REPLACE 2TE411A, 410A and 411B.     831031.
PERFORM IJFf SET TEST 0:12RII3 USING M17E. LIFF SEP PRESSURE 'IO BE 375 PSIG PER DCR 2SC-1245.
CORRECTIVE 7CTION:       REPLACED RID'S, CmPIETED FUNCTINAL SAT.     831104.
830908.
935719   OD   2   RMS, 2R41B 4
TIRECTIVE PCTIN:
FAILURE DESCRIPTICN:     GANNEL KEEPS SPIKING GIVING CWTAIMENT ISOIATICN.       831015.
SET VALVE 'IO 380 PSI.
CORRECTIVE PCTION:       REPLACED CCNTROLLER BACKPLANE PINS AND RE-INSTALLED BACKPIANE AND MQXILES.
830915.
ElRCTINAL TEST SAT.     831019.
933236 IC 2
: 919996   IC   2   RMS,2R2 FAILURE DESCRIPTICN:     CHANNEL IN AIARM. 830204.
R'ID, NARROW RANGE FAILURE DESCRIPTICN:
CUKHtA;nVE 7CTION:       REPIACED BATTERIES, CWNECTOR CN DISPIAY CABLE, TRANSMIT OFf0 COUPLER AND UPGRADED 7 CIA'S. CAL AND CIANNEL CHECKS SAT. 830915.
REPLACE 2TE411A, 410A and 411B.
935050 MD   2   23MS18, MS BYPASS
831031.
'                      FAILURE DESCRIPTICN:     BGY 'IO BWNET LEAK.     831023.
CORRECTIVE 7CTION:
CuHatx;nVE PCTION:       REPIACED VALVE INTERNALS. 831030.
REPLACED RID'S, CmPIETED FUNCTINAL SAT.
935069 MD   2   22CV155 FAILURE DESCRIPTICN:     BWNEP LEAK DRIPPING BORIC 7CID CN 22 BAT PUMP. 831027.
831104.
CohxtI:nVE ACTION:       REPIACED DIAPHRAM. 831031.
935719 OD 2
RMS, 2R41B FAILURE DESCRIPTICN:
GANNEL KEEPS SPIKING GIVING CWTAIMENT ISOIATICN.
831015.
4 CORRECTIVE PCTION:
REPLACED CCNTROLLER BACKPLANE PINS AND RE-INSTALLED BACKPIANE AND MQXILES.
ElRCTINAL TEST SAT.
831019.
919996 IC 2
RMS,2R2 FAILURE DESCRIPTICN:
CHANNEL IN AIARM. 830204.
CUKHtA;nVE 7CTION:
REPIACED BATTERIES, CWNECTOR CN DISPIAY CABLE, TRANSMIT OFf0 COUPLER AND UPGRADED 7 CIA'S. CAL AND CIANNEL CHECKS SAT.
830915.
935050 MD 2
23MS18, MS BYPASS FAILURE DESCRIPTICN:
BGY 'IO BWNET LEAK.
831023.
CuHatx;nVE PCTION:
REPIACED VALVE INTERNALS.
831030.
935069 MD 2
22CV155 FAILURE DESCRIPTICN:
BWNEP LEAK DRIPPING BORIC 7CID CN 22 BAT PUMP.
831027.
CohxtI:nVE ACTION:
REPIACED DIAPHRAM.
831031.
Page 9 of 16
Page 9 of 16


P:S E &'G SAIst GENERATING SDTICN                         '
P:S E &'G SAIst GENERATING SDTICN SAFETY REIATED WDEE ORDER IM SAIRM WIT 2 WO NO - DEPT WIT EUJIPMENT if=wnnCATIN l937026' OD 2'
<-                                                                SAFETY REIATED WDEE ORDER IM SAIRM WIT 2 WO NO - DEPT WIT EUJIPMENT if=wnnCATIN l937026'         OD 2' L2SW352 I                                     FAIIURE DESCRIPfIW:   VALVE NELD 'IO SERVICE WATER HEADER HAS SLRIOUS IRAK. . 830925..
L2SW352 I
: i.                                    COPywr1VE ACTION:      REPIACED SPOOL PIECE.        830927.
FAIIURE DESCRIPfIW:
937027        OD  2    23SW24, SCREEN NASH 1
VALVE NELD 'IO SERVICE WATER HEADER HAS SLRIOUS IRAK.. 830925..
:                                    FAIIURE DESCRIPTIW:    NATER FRCM TELL TALE DRAIN I!OICATES BIDH DIAPHRAM. 830925.-
i.
i.
CORRECTIVE ACTION:     REPIACED DIAPHRAM.     830927.                                                 _
COPywr1VE ACTION:
t 937049         CD 2     T-REFERENCE 4
REPIACED SPOOL PIECE.
FAILURE DESCRIPTICN:   T-REF, DOES NOT APPEAR TO BE 'IRACKING PROPERLY W 'IHE UNITS INCREASE IN POWER.-
830927.
937027 OD 2
23SW24, SCREEN NASH 1
FAIIURE DESCRIPTIW:
NATER FRCM TELL TALE DRAIN I!OICATES BIDH DIAPHRAM. 830925.-
i CORRECTIVE ACTION:
REPIACED DIAPHRAM.
830927.
t 937049 CD 2
T-REFERENCE 4
FAILURE DESCRIPTICN:
T-REF, DOES NOT APPEAR TO BE 'IRACKING PROPERLY W 'IHE UNITS INCREASE IN POWER.-
THIS PRECWDES AUIO RCD CONTROL A10 PROPER STEAM DUMP CCNTROL.- 830924.
THIS PRECWDES AUIO RCD CONTROL A10 PROPER STEAM DUMP CCNTROL.- 830924.
CORRECTIVE ACTIW:       REPLACED SLMIA'IOR 2IC-505 AIO CALIBRATED 830925.
CORRECTIVE ACTIW:
I
REPLACED SLMIA'IOR 2IC-505 AIO CALIBRATED 830925.
!            937063         m   2     GG SEAL PRESS TRANS i
I 937063 m
FAIIURE DESCRIPTICN:   'IHE PRESSURE TRANSMITfER HAS LEAK FRCH BOITCM CF 1 GPM RATE. 830921.-
2 GG SEAL PRESS TRANS i
CCRRECTIVE ACTION:       REPIACED TRANSMITTER DUE TO LEAKING BOURDCE 'IUBE. INSTAT.Tm SNUBBER AT TRANStuM. EDUtO PROBLEM IN SGNA'ICR. 830926.
FAIIURE DESCRIPTICN:
'IHE PRESSURE TRANSMITfER HAS LEAK FRCH BOITCM CF 1 GPM RATE.
830921.-
CCRRECTIVE ACTION:
REPIACED TRANSMITTER DUE TO LEAKING BOURDCE 'IUBE. INSTAT.Tm SNUBBER AT TRANStuM. EDUtO PROBLEM IN SGNA'ICR. 830926.
}
}
)             937549       m   2   CCNT AIR IDCK EL 100 4
)
L                                      FAILURE DESCRIPTIN:     FAILED LEAK RNFE TEST.       830926.
937549 m
i 4
2 CCNT AIR IDCK EL 100 4
2                                      Cuous.;nVE ACTION:       RESEATED SEAL AND ADJUSTED DOOR W HINGES. 830926.
FAILURE DESCRIPTIN:
\
FAILED LEAK RNFE TEST.
;              937654         CD 2     RMS, 2RS 1
830926.
t i                                      FAILURE DESCRIPTICN:   ALARM I<EEPG GOIIG CFF IN FHB. GANNEL BIOCKED IN CCNIPOL ROOM. 831003.
L i
i CORRECTIVE ACTION:       REPIACED DEFECTIVE POWER SUPPIX AND STICKING RESET SWITCH. EUNCTIONAL TEST f                                                                SAT. 831006.
4 2
7 Page 10'of 16
Cuous.;nVE ACTION:
RESEATED SEAL AND ADJUSTED DOOR W HINGES.
830926.
\\
937654 CD 2
RMS, 2RS 1
FAILURE DESCRIPTICN:
ALARM I<EEPG GOIIG CFF IN FHB. GANNEL BIOCKED IN CCNIPOL ROOM. 831003.
t i
i f
CORRECTIVE ACTION:
REPIACED DEFECTIVE POWER SUPPIX AND STICKING RESET SWITCH. EUNCTIONAL TEST SAT.
831006.
7
]
]
l
Page 10'of 16 l


  . . . .      . - . .      .          . _ . .- ..  -- -,        . - , , .- , _ -          .    . -  .        ~                                 .-
~
V
V
:J' .                                                     PSE&G SALEM GENERATING STATIN SAFETY RFIATED WORK @ DER LOG -           .
:J'.
SAIEM UNIT 2 WO NO         DEPT WIT EQUIPMENT unWIIFICATIW                                                                                 ,
PSE&G SALEM GENERATING STATIN SAFETY RFIATED WORK @ DER LOG -
937683       CD   2   CCNT AIR IIXX EL 130 FAILURE DESCRIPTICN:     INNER DOOR HAS EXCESSIVE IEAKGE IM SEAL. 831005.
SAIEM UNIT 2 WO NO DEPT WIT EQUIPMENT unWIIFICATIW 937683 CD 2
l                                   Cuoer;r1VE ACTION:       REPLACED INNER AND OUIER DOOR SFAL.         831006.
CCNT AIR IIXX EL 130 FAILURE DESCRIPTICN:
INNER DOOR HAS EXCESSIVE IEAKGE IM SEAL. 831005.
l Cuoer;r1VE ACTION:
REPLACED INNER AND OUIER DOOR SFAL.
831006.
i
i
          '937937       CD   2   IEIDOWN PRESSURE                                                                                                     :'
'937937 CD 2
1 FAIIERE DESCRIPTIN:       BOTH CCNSOLE AND l'250, LEIDOWN PRESSURE INDICATICN FAILED TF-SCALE HIGH.
IEIDOWN PRESSURE 1
>                                                            830725.
FAIIERE DESCRIPTIN:
i CORRECTIVE ACTIN:       TRANSMITTER HAD BRWEN BOURDCN 'IUBE. REPLACED TRANSMITTER. 830726,
BOTH CCNSOLE AND l'250, LEIDOWN PRESSURE INDICATICN FAILED TF-SCALE HIGH.
:          943501       MT   2   CONT AIR IOCK EL 130 3
830725.
i                                 . FAILURE DESCRIPTICN:     INNER DOOR IS LEAKING FROM UPPER RIGHT HAND CCENER.         831114.
i CORRECTIVE ACTIN:
Cuwrr;r1VE ACTION:       REPIACED BOIH SEALS CN INNER DOOR.         831114.
TRANSMITTER HAD BRWEN BOURDCN 'IUBE. REPLACED TRANSMITTER. 830726, 943501 MT 2
938824       OD   2   21A EEEDWATER HEATER l
CONT AIR IOCK EL 130 3
FAILURE DESCRIPTICE:     HEATER HAS POSSIBLE 'IUBE LEAKS. 830822.
i
l I                                   CORRECTIVE ACTION:       IOCATED 1 LEAK AND PIUGGED. - SEAL NEEDED DIAPHRAM AND RE-INSTATJm MANWAY.
. FAILURE DESCRIPTICN:
INNER DOOR IS LEAKING FROM UPPER RIGHT HAND CCENER.
831114.
t Cuwrr;r1VE ACTION:
REPIACED BOIH SEALS CN INNER DOOR.
831114.
l 938824 OD 2
21A EEEDWATER HEATER l
FAILURE DESCRIPTICE:
HEATER HAS POSSIBLE 'IUBE LEAKS. 830822.
I CORRECTIVE ACTION:
IOCATED 1 LEAK AND PIUGGED. - SEAL NEEDED DIAPHRAM AND RE-INSTATJm MANWAY.
830828.
830828.
!            939004             2   PZR SPRAY VALVIE FAILURE DESCRIPTICE:     DO NOT MAKE CPEN LIMIT.           830918.
939004 2
)                                   CORRECTIVE ACTION:       AIR IEAKING AROUND DIAPHRAM CN 2P53. TIGHTENED DIAPHPAM BOLTS. REPLACED 1                                                             LEAKING EIP CCNVERIER AND I/P.POSITICNER CN 2 PSI. 830920.
PZR SPRAY VALVIE FAILURE DESCRIPTICE:
l 940329       OD   2   NIS N-43 POWER RANGE FAILURE DESCRIPTICN:     GANNEL HAS LOSS T DETECITE NOLTAGE AIABM UP.         831024.
DO NOT MAKE CPEN LIMIT.
1 CuwturiVE ACTION:         REPLACED HIGH VOLTAGE PCHER SUPPLY.         831024.
830918.
)
CORRECTIVE ACTION:
AIR IEAKING AROUND DIAPHRAM CN 2P53. TIGHTENED DIAPHPAM BOLTS. REPLACED 1
LEAKING EIP CCNVERIER AND I/P.POSITICNER CN 2 PSI. 830920.
l 940329 OD 2
NIS N-43 POWER RANGE FAILURE DESCRIPTICN:
GANNEL HAS LOSS T DETECITE NOLTAGE AIABM UP.
831024.
1 CuwturiVE ACTION:
REPLACED HIGH VOLTAGE PCHER SUPPLY.
831024.
Page 11 of 16
Page 11 of 16


PSE&G SAIDI GENERATING SIATIN SAFETY RELATED WOIE CRDER I/JG SALEM UNIT 2 WO NO   DEPT UNIT EQUIPMENT IDENTIFICATIm
PSE&G SAIDI GENERATING SIATIN SAFETY RELATED WOIE CRDER I/JG SALEM UNIT 2 WO NO DEPT UNIT EQUIPMENT IDENTIFICATIm 940341 CD 2
.                            940341   CD   2   22 SI PCMP FAILURE DESCRIPTIm:   SERVICE WATER LEAK CN OU'II.ET LINE FIOi IUBE OIL COOLER. 831027.
22 SI PCMP FAILURE DESCRIPTIm:
Cut <RtL'nVE ICTION:   FABRICATED NEW SPOOL PIECE AND INSTN m . 831116.
SERVICE WATER LEAK CN OU'II.ET LINE FIOi IUBE OIL COOLER.
942729   IC   2   NIS 2N31 SOURCE RANGE FAILURE DESCRIPTIW:   COUNTS DURING CALIBRATICN IfW m 2N31 CP METER. 831114.
831027.
CeuxtL'nVE ACTION:     REPIACED BAD DRIVER AMPLIFIER ASSENBLY NM-103. CAL AND MWANL CHECK GAT.
Cut <RtL'nVE ICTION:
FABRICATED NEW SPOOL PIECE AND INSTN m. 831116.
942729 IC 2
NIS 2N31 SOURCE RANGE FAILURE DESCRIPTIW:
COUNTS DURING CALIBRATICN IfW m 2N31 CP METER. 831114.
CeuxtL'nVE ACTION:
REPIACED BAD DRIVER AMPLIFIER ASSENBLY NM-103. CAL AND MWANL CHECK GAT.
831117.
831117.
940887   CD   2   2C SBC FAILURE DESCRIPTICN:   SEC WILL NOT RESET AFTER SAFEGUARDS TEST. 831118.
940887 CD 2
CUHKtL'nVE ACTION:     RENOVED GASIS 1964-1008 AND REPIKm WITH CHASIS 1964-1004.     831118.
2C SBC FAILURE DESCRIPTICN:
940861 CD   2   CONT AIR IOCK EL 130 FAILURE DESCRIPTICN: FAILED LEAK RATE, BOTH DOOR.S 831118.
SEC WILL NOT RESET AFTER SAFEGUARDS TEST.
CuMxtA;nVE ACTION:   CLEANED AND TURNED AROUND SEALS. 831118.                       ,
831118.
940549   m     2   2A EMERG DIESEL FAILURE DESCRIPTICN: JACKET WATER HEATER IS LEAKING CHRWATES.     831109.
CUHKtL'nVE ACTION:
CuKt<tA;nVE ACTICN:   FOUND HEATERS 'IO BE CORRCDED. REPIFm HEATERS. 831110.
RENOVED GASIS 1964-1008 AND REPIKm WITH CHASIS 1964-1004.
941069   MD   2   SPARE SEC G ASSIS FAILURE DESCRIPTICN:   TROUBLESHOUP SEC GASSIS RENOVED FRCM UNIT 2C SEC. 831118.
831118.
CUKxtL'nVE ACTION:     REPIrm Dr.tu;nVE PC BOARD IN SIDF 27. TESTED SAT. 831121.
940861 CD 2
CONT AIR IOCK EL 130 FAILURE DESCRIPTICN:
FAILED LEAK RATE, BOTH DOOR.S 831118.
CuMxtA;nVE ACTION:
CLEANED AND TURNED AROUND SEALS.
831118.
940549 m
2 2A EMERG DIESEL FAILURE DESCRIPTICN:
JACKET WATER HEATER IS LEAKING CHRWATES.
831109.
CuKt<tA;nVE ACTICN:
FOUND HEATERS 'IO BE CORRCDED. REPIFm HEATERS. 831110.
941069 MD 2
SPARE SEC G ASSIS FAILURE DESCRIPTICN:
TROUBLESHOUP SEC GASSIS RENOVED FRCM UNIT 2C SEC. 831118.
CUKxtL'nVE ACTION:
REPIrm Dr.tu;nVE PC BOARD IN SIDF 27. TESTED SAT. 831121.
l Page 12 of 16
l Page 12 of 16


PSE&G SALEM GENERATING STATION SAFELY RELATED MORK WDER IfG SAIEM UNIT 2
PSE&G SALEM GENERATING STATION SAFELY RELATED MORK WDER IfG SAIEM UNIT 2
  ,WO NO   DEPT UNIT EQUIPMENT IDENTIFICATIW 942502   IC   2   22 BC WIDE RNG T HOP FAILURE DESCRIPTIN:   ILW LEVEL AMP QTTPUT FAIIS IIM WEN RID RECWNECTED EDLIOTING CWPLETIW T DCR 2EC-1620A, REPLACEFENT CP WR RTD TEMP RECWDERS. 830830.
, O NO DEPT UNIT EQUIPMENT IDENTIFICATIW W
CORRECTIVE PCTIO4     REPIJCED LOW LEVEL AMPLIFIER. 830830.
942502 IC 2
942533   IC   2   RMS, 2R17A FAILURE DESCRIPTIW :   GANNEL SHCWS BAD DATA N CRP ALARM AND NARNINGS. 830907.
22 BC WIDE RNG T HOP FAILURE DESCRIPTIN:
CuxxtL'nVE PCTION:     REPIACED FIRST STAW OP AMP 715 IN SCALER. CHANNEL CAL SAT. 831003.
ILW LEVEL AMP QTTPUT FAIIS IIM WEN RID RECWNECTED EDLIOTING CWPLETIW T DCR 2EC-1620A, REPLACEFENT CP WR RTD TEMP RECWDERS.
940927   OD   2   CONT AIR LOCK EL 100 FAILURE DESCRIPTIW:   FAILED LEAK RATE TEST. 831118.
830830.
CusatL'nVE PCTION:     ('TPANED SEAL, REPIN m WE.     831118.
CORRECTIVE PCTIO4 REPIJCED LOW LEVEL AMPLIFIER. 830830.
942586 IC   2   NIS 2N42 PWR PANGE FAILURE DESCRIPTIW:     ISOLATIN AMPLIFIER 1E307 FGJND CUT C SPDC. DUE 'IO HIS'IORY CF DRIFF, REPLACE AMPLIFIER. 831028.
942533 IC 2
CORRECTIVE PCTIW:       REPLACED ISOIATIm AMPLIFIER. 831028.
RMS, 2R17A FAILURE DESCRIPTIW :
942572   IC   2   INS, 2R41A FAILURE DESCRIPTIN:   CHANNEL DRIPTS HIGH AND IG7 WITH SCAN UP W CmIVIER.       830924.
GANNEL SHCWS BAD DATA N CRP ALARM AND NARNINGS. 830907.
CuxxtL'nVE ACTION:     REPIACED ACIA'S U42 AhD U43 'IO BRING COUNIS 'IO NORMAL. REPIACED SCALER TEST JACK A10 REALIGNED BENT J1 C3EN PINS. 830927.
CuxxtL'nVE PCTION:
940922   CD   2   BKR 2CP PZR HEATERS FAIIERE DESCRIPTION:   OPERATIN T WEN OR CIOSED CCESOLE PUSHBUITW CAUSES A GROUT 0 CN 2A 125VDC l
REPIACED FIRST STAW OP AMP 715 IN SCALER. CHANNEL CAL SAT. 831003.
BUS. 831122.
940927 OD 2
l l                     CORRECTIVE PCTICN:     REPLACED BAD SPRING GARGING KTIOR IN PZR 1 EATER BREAKER. CYCLED WITH NO
CONT AIR LOCK EL 100 FAILURE DESCRIPTIW:
!                                            DETECTAnTR GROUND. 831128.
FAILED LEAK RATE TEST. 831118.
CusatL'nVE PCTION:
('TPANED SEAL, REPIN m WE.
831118.
942586 IC 2
NIS 2N42 PWR PANGE FAILURE DESCRIPTIW:
ISOLATIN AMPLIFIER 1E307 FGJND CUT C SPDC. DUE 'IO HIS'IORY CF DRIFF, REPLACE AMPLIFIER.
831028.
CORRECTIVE PCTIW:
REPLACED ISOIATIm AMPLIFIER. 831028.
942572 IC 2
INS, 2R41A FAILURE DESCRIPTIN:
CHANNEL DRIPTS HIGH AND IG7 WITH SCAN UP W CmIVIER.
830924.
CuxxtL'nVE ACTION:
REPIACED ACIA'S U42 AhD U43 'IO BRING COUNIS 'IO NORMAL. REPIACED SCALER TEST JACK A10 REALIGNED BENT J1 C3EN PINS. 830927.
940922 CD 2
BKR 2CP PZR HEATERS FAIIERE DESCRIPTION:
OPERATIN T WEN OR CIOSED CCESOLE PUSHBUITW CAUSES A GROUT 0 CN 2A 125VDC l
BUS.
831122.
l l
CORRECTIVE PCTICN:
REPLACED BAD SPRING GARGING KTIOR IN PZR 1 EATER BREAKER. CYCLED WITH NO DETECTAnTR GROUND.
831128.
Page 13 of 16
Page 13 of 16


                                          .PSE&G SALEM GENERATING SD&IN SAFET1Y REIATED N0iE WDER IOG SAIEM UNIT 2                                               ,
.PSE&G SALEM GENERATING SD&IN SAFET1Y REIATED N0iE WDER IOG SAIEM UNIT 2 WO NO DEPP UNIT Bgun+1ENP IDENTIFICATIN
WO NO DEPP UNIT Bgun+1ENP IDENTIFICATIN
.938777 CD 2
  .938777 CD   2   2PS2,.PZR SPRAY FAIIURE DESCRIPTIW:     INSPECI VALVE INTERNALS AND LINE EUR BIOCKAGE N0/OR PROPER VALVE CPERATIN.
2PS2,.PZR SPRAY FAIIURE DESCRIPTIW:
INSPECI VALVE INTERNALS AND LINE EUR BIOCKAGE N0/OR PROPER VALVE CPERATIN.
330812.
330812.
CORRECTIVE ACPIN:       INSTATM NW SPEM ASSEMBLY, P7CKING N0 PACKING GIAIO NUT. 831113.~ -
CORRECTIVE ACPIN:
937758 (D   2. 2CV141, CHG RELIEF FAILURE DESCRIPTICN:   23 CHARGING PUMP RELIEF VALVE FAIIED GPEN. 830726.
INSTATM NW SPEM ASSEMBLY, P7CKING N0 PACKING GIAIO NUT. 831113.~ -
CORRECTIVE ACTION:     REPIACED VALVE INTERNAIS. 830807.
937758 (D
Page 14 of 16 l
2.
2CV141, CHG RELIEF FAILURE DESCRIPTICN:
23 CHARGING PUMP RELIEF VALVE FAIIED GPEN.
830726.
CORRECTIVE ACTION:
REPIACED VALVE INTERNAIS.
830807.
l Page 14 of 16


t a
t a
                                                                          ' SALEM UNIT 2 OPERATIONS  
' SALEM UNIT 2 OPERATIONS  


==SUMMARY==
==SUMMARY==
REPORT DECEMBER 1983
REPORT DECEMBER 1983
              ~ Unit.No. 2 remained shutdown.the entire month as repairs to the generatorfcontinued.                     A number of major items were-completed during
~ Unit.No. 2 remained shutdown.the entire month as repairs to the generatorfcontinued.
              ~ the month.- 'Five new coils were received-from Westinghouse and
A number of major items were-completed during
              . installed in the generator: stator.                                               Installation of-the' coil. spacers and-air gap baffle was'also completed.                                                 Preliminary testing was
~ the month.- 'Five new coils were received-from Westinghouse and
              - performed on the stator cooling water nipple thermocouples and thermocouple. terminal board. Minor problems were encountered with some of:the thermocouples tested. These problems were corrected and'
. installed in the generator: stator.
              -the affected thermocouples were tested satisfactorily. Westinghouse is currently performing repairs to four fan coil unit motors. Barring                                                                                       l unforeseen difficulties, Unit No. 2 is currently scheduled'to return to service on February 9, 1984. .
Installation of-the' coil. spacers and-air gap baffle was'also completed.
Preliminary testing was
- performed on the stator cooling water nipple thermocouples and thermocouple. terminal board.
Minor problems were encountered with some of:the thermocouples tested.
These problems were corrected and'
-the affected thermocouples were tested satisfactorily.
Westinghouse is currently performing repairs to four fan coil unit motors.
Barring l
unforeseen difficulties, Unit No. 2 is currently scheduled'to return to service on February 9, 1984..
t 1
t 1
9 1
9 1
~
~
Page 15 of 16
Page 15 of 16
    ,            ,.--r e *-
,.--r e *-
* r--
* r--
4,-- , ..me-wwm -m- r---#., n.v n y,   =-e-,,-m--*-.e-m,--.     --wr-,-e- - - , - , , , - , , .- <   ,,,m.m., , *-e. * - -,e--v- -
4,--
..me-wwm
-m-r---#.,
n.v n y,
=-e-,,-m--*-.e-m,--.
--wr-,-e- - -, -,,, -,,.- <
,,,m.m.,
*-e.
-,e--v-


I N %
I N
REFUELING INFORMATION DOCKET NO.:               50-311 COMPLETED BY:               L.K. Miller                                     UNIT NAME:               Salem 2 DATE:             January 10, 1984 TELEPHONE:               609/935-6000 EXTENSION:               4455 Month               December-1983
REFUELING INFORMATION DOCKET NO.:
                    - 1. .       Refueling information _has changed from last month:
50-311 COMPLETED BY:
,                                                              YES     X-                     NO J2 .         Scheduled date for next refueling:                                 January.5, 1985
L.K. Miller UNIT NAME:
                  - 3.           . Scheduled date for restart following refueling:                                                 March 17, 1985 _
Salem 2 DATE:
: 4.         A)       Will Technical Specification changes or other license amendments-be required?
January 10, 1984 TELEPHONE:
YES                         NO NOT DETERMINED TO DATE                                     1/1/84 B)       Has . the reload fuel design ~ been reviewed by the Station Operating Review Coramittee?
609/935-6000 EXTENSION:
YES                         NO   X If no, when is it scheduled? November 1984 1
4455 Month December-1983
: 5.           Scheduled date (s) for submitting proposed licensing action:
- 1..
Refueling information _has changed from last month:
YES X-NO J2.
Scheduled date for next refueling:
January.5, 1985
- 3.
. Scheduled date for restart following refueling:
March 17, 1985 4.
A)
Will Technical Specification changes or other license amendments-be required?
YES NO NOT DETERMINED TO DATE 1/1/84 B)
Has. the reload fuel design ~ been reviewed by the Station Operating Review Coramittee?
YES NO X
If no, when is it scheduled? November 1984 1
5.
Scheduled date (s) for submitting proposed licensing action:
December 1984 (if required)
December 1984 (if required)
                    '6.           Important licensing considerations associated with refueling:
'6.
Important licensing considerations associated with refueling:
NONE 6
NONE 6
: 7.         Number of Fue1-' Asse;t.blies:
7.
A)         Incore'                                                                                         193 B)       In Spent Fuel Storage                                                                               72
Number of Fue1-' Asse;t.blies:
: 8.           Present licensed spent fuel storage capacity:                                                             1170 Future spent fuel storage capacity:                                                                       1170 9..          Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:                                                                                     March.2000 8-1-7.R4 Page 16 of 16
A)
Incore' 193 B)
In Spent Fuel Storage 72 8.
Present licensed spent fuel storage capacity:
1170 Future spent fuel storage capacity:
1170 Date of last refueling that can be discharged 9..
to spent fuel pool assuming the present licensed capacity:
March.2000 8-1-7.R4 Page 16 of 16


L .
L g pggg Public Service Electric and GO Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station January 10, 1984 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
g pggg Public Service Electric and GO Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station January 10, 1984 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555


==Dear Sir:==
==Dear Sir:==
MONTHLY OPERATING REPORT S ALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of December 1983 are being sent to you.
MONTHLY OPERATING REPORT S ALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of December 1983 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours,
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours,
                                                                /
/
J. M. Zupko, Jr.
J.
General Manager - Salem Operations (hhhKM:sbh cc:     Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Contro3.
M.
U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page lof 16 8-1-7.R4 7/',
Zupko, Jr.
                                                                      ) l? i   l i
General Manager - Salem Operations (hhhKM:sbh cc:
I The Energy People
Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Contro3.
                                                                                            % 21M (2(M 1181}}
U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page lof 16 7/
8-1-7.R4
) l?
i l
i I
The Energy People
% 21M (2(M 1181}}

Latest revision as of 02:03, 14 December 2024

Monthly Operating Rept for Dec 1983
ML20086H967
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/31/1983
From: Miller L, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8401230004
Download: ML20086H967 (16)


Text

-

AVERAGE DAILY UNIT' POWER LEVEL Docket No.

50-311 Unit Name Salem # 2 Date Jan.10, 1984 LCcmp.leted by.

L.

K. Miller Telephone 609-935-6000 Extension 4455 Month December 1983 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)

(MWe-NET) 1 0

16 0

2 0

17 0

3 0

18 0

4 0

19 0

5 0

20 0

'6 0

21 0

7~

0 22 0

8 0

23 0

9 0

24 0

10 0

25 0

1 11 0

26 0

12 0

27 0

13 0

28 0

14 0

29 0

15 0

30 0

Pg. 8,1-7 R1 8401230004 831231 DRADOCK05000g I

Page 2 of 16 g M1 4

4 s

OPERATING DATA REPORT

' Docket No.

50-311-

_Date-Jan.10, 1984

~

Telephone 935-6000 Completed-by.

L. K. Miller Extension 445L

't

~ Operating Status I?.

Unit'Name Salem No. 2 Notes

2.

Reporting Period December 1983

'3.

Licensed Thermal Power _(MWt) 3411

'4.

Nameplate Rating (Gross. MWe).

1162 (5.

Design Electrical Rating - (Net Mue)

TIT 5 61 Maximum Dependable Capacity (Gross MWe)1149 7. -- Maximum' Dependable Capacity (Net MWe) 1106

' 8.'

If Changes Occur in. Capacity Ratings (ltems 3 through 7) since Last Report, Give Reason

-N/A 9.

Power: Level to Which Restricted, if any (Net MWe)

N/A

10. Reasons for Bestrictions, if any N/A This Month Year to Dnte Cumulative 113 Hours'in Reporting Period' 744 8760 19466 12.-No. of Hrs. Reactor was. Critical' O

1252.9 11708.5

13. ' Reactor Reserve Shutdown Hrs.

-744 2054.1 2090.6 t-14.LHours Generator On-Line 0

1080.1 11417.3

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 2954523 33471072

'17.' Gross.Elec. Energy Generated

- (MWE) 0 852040 10868290

18. Net Elec. Energy Generated - (MWH)

(4102) 743604 10317251

19. Unit Service Factor 0

12.3 58.7 20., Unit Availability Factor 0

12.3 58.7

' 21. Unit Capacity -Factor (using MDC Net) 0 7.7 47.9

- 22. Unit Capacity Factor (using DER Net) 0 7.6 47.5

23. Unit Forced Outage Rate 100 75.6 24.5-24.-Shutdowns-scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of. Report Period, Estimated Date of Startup:

2-10-84

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2 4

Page 3 of 16

UNIT SHUTDOWN AND POWER REDUCTIONS Dockht No. 50-311' REPORT MONTH DECEMBER 1983

~ Unit - Ntme Sal:tm No.2 Date Jan. 10, 1984 Completed by L.K. Miller

' Telephone' 609-935-6000 Extension 4455-Method of Duration

' Shutting

' License Cause and Corrective Action to No.

-Date Type

. Hours Reason Down Event System.

Ccmponent

. Prevent Recurrence 1

2 Rea ctor Report Code 4 Code 5 Stator Core

'HA GENERA Iron Generator 83-116 11/17 F

'744 A

4 1

2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram, for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee-F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)

Page 4 of 16

MAJOR PLANT MODIFICATIONS N

N

~

UNIT NAME:

SEM2 REPORT MONTE DECEMBER 1983 DATE:

JANUARY:10, 1984 COMPLETED BY:

L. K. MILLER TELEPHONE:

(609) 339-4455

.0

  • DCR No.-

PRINCIPLE SYSTEM SUBJECT 2EC-0765A-Control Room Air Modify CAACS and EACS systems to Conditioning / Chilled comply with requirements of controls Water DM-S-12, Par. 5.4 (page 7).

t 2EC-1054 Penetration Area Install four high temperature Ventilation thermostats in the penetration area-two are located on El. 78' in the Mechanical Penetration Area and two are located in the area above on El. 100'.

2EC-1073 Fuel Transfer System Change wiring on system to correct problem of both pit side and y

reactor side winch position indicators energizing simultaneously when transferring. fuel.

2ET-1645 Safety Injection This test is required to determine feasibility of testing the 2SJ4 and 2SJS valves without violating i

Technical Specification S/4.5.4.1 and to ensure that these valves s

will operate under anticipated delta P. conditions.

The 2SJ4 and 2SJ5 valves are required to open on a safety injection signal.

2SC-0530 Condensate Polishing Revise " Condensate Polishing Partial Bypass Alert" alarm circuit so that alarm is received when ?CN190 valve is open and any 21/22/23CN108 valve.

is not fully shut.

2SC-0627 Diesel Generators Relocate the lube oil and jacket (2A, 2B, 2C) water switches from the diesel skid to a remote area.

4 2SC-0683 E-H Control Oil System Replace tubing on'E-H System with heavy wall S.S. pipe.

i

  • DESIGN'GHANGE REOUEST 9-1-7.R1 Page 5 of 16 i

i n

, ~ - -,,,,, -

,,-n,

..,-,--+--mn

-,n,,-,..,

,ve---n-..,,

-,...-.m,n,,-m.gew,--,,

mm.,.--~m5.,-wa,v,-,-.

r

-- -, -, - - e gy

-g~-,-

ev--m

~~

e MAJOR' PLANT MODIFICATIONS DOCKET NO.:

50-311

' REPORT MONTH DECEMBER UNIT NAME:

Salem 2 DATE:

January 10, 1984 COMPLETED'BY:

L.K. Miller TELEPHONE:

609/339-4455 DCR.NO.-

10CFR 50.59 SAFETI EVALUATION 2EC-0765A: Provision of the' corridor, as required by the NRC, with filtered air from the EACS increases plant safety in all modes of operation.

No unreviewed safety or environmental questione are involved.

2EC-1054 The addition of these thermostats will not affect any plant process or environmental impact, nor will it create

~

~

' any new safety' hazards.

No unreviewed safety or environmental questions are involved.

2EC-1073 Implement'ation of=this DCR will not create any new safety

' hazards.

No unreviewed safety or environmental questions are involved..

2EC-1645' Implementation of this DCR'will not create any new safety

' hazards or alter plant effluent discharge.

No unreviewed safety or environmental questions are involved.

2SC-0530 This design change is not_ safety related and does not affect _ the safe shutdown of, the unit.

Ik) unreviewed y

safety or environmental questions are involved.

2SC-0627 The relocation of the switches will reduce the' amount the vibration they are subject 1to.

No.unreviewed safety or environmental questions--are involved.

2SC-0683_

'This design change will eliminate forced outages due to t

tubing failures.

No~unreviewed safety or environmental questions are involved.

-*DCR - Design Change Request i

ff l-t e

Page 6 of.16

m a

i PSE&G SALEM GENERATING SDEION:

SAFETY REIATED WORK CEDER IOG -

(;

j

.i SAI2M UNIT 2 -

WO NO DEPT WIT EQUIPBENT IudenrICATIm

)

940966 CD 2

PMS 2R41A FAIIURE DESCRIPTIW:

GANNEL IEICATES FAIIED. 831122.

4

?

CORRECTIVE PCTION:

REPIACED DITE IN IN RAM BATTERY CIRCUIT T CONTRnrIER. REPIACED BAD 7800 n

,PRm. RETEST SAT. 831122.

i 934093 MD 2

FIRE BARRIERS FAIIURE DESCRIPTIW:

REPAIR FIRE BARRIERS IOCATED WILE PEREDRMING PENEfRATIN INSPECTIO. 830819.-

4 2

CCRRECTIVE ACTION:

FTTJFn HOLES WITH SE!CO PR855 SIIJCON FOAM AFTER DAPMING UP WITH KAOW000 I

REFRACIORY FIBER. -830819.

i 934063 MD 2

FIRE BARRIERS i

FAILURE DESCRIPTIN:

PERFORM PHYSICAL INSPECTIW T ALL LNIT 2 FIRE BARRIER PENEFRATINS.- 830517.

o i

CORRECTIVE ACTION:

INSPECTED APPROPRIATE FIRE BARRIERS. REPAIRS TO BE MADE UOER WO #934093.

830819.

937078 OD 2

23 CG T. FAN COIL UNIT i

FAILURE DESCRIPTICH:

23 CECU STARTED IN SIDW SPEED AIO BKR TRIPPED IPNEDIATELY. CFCU HAD BEEN RUtNING IN FAST SPEED. INVESTIGATIm SHOWED SHUNT BKR REMAINED CLOSED.

830828.

CORRECTIVE ACTICN:

EHUNP BKR TRIP COIL FOUtO SHORTED. REPLACED WITH LIKE KIND. TESTED SAT.

4 830901.

]

937250 CD 2

CCNr. AIR IOCK EL 130 1

FAILURE DESCRIPTIW:

OUTER DOOR HAS EXCESSIVE AIR IEAK.

830831.

Cut <mJnVE ACTION:

RESET DOOR SEAL.

830831.

f 938193 CD 2

23 CHARGING FUMP l

FAIIURE DESCRIPTIN:

INNER PISim GLAt0 LEAKING BADLY. SEAL TANK IS OVERFIDWIE. 830809.

I i

CutwEunVE ACTION:

REPACKED 31 CYLINER AND REPIACED PIONGER.

830824.

l Page 7 of 16

P S E & G S M GENEPATING STATIN.

SAFETY REIATED NGK CIIDER LOG SAIIM UNIT 2

~

WO NO DEPT WIT EQUIP!ENT IuDenrICATIm 938809 CD 2

24MS10 A'IMOS.. RELIEF FAILURE DESCRIPTIN:

VALVE IIAKING BY.

830820.

Cuto<tL'nVE ACTION:

REMNED VALVE, 'IOOK CUT CN SEAT, DISC AND IAPPED. BLUE CHECKED AIO REASSDmi.m.

830825.

938950 CD 2

CWr. AIR IDCK EL 100 FAILURE DESCRIPTIW:

EXTERIm DOOR HAS EXCESSIVE IIAKAGE. 830815.

Cuto<tL'nVE ACTION:

REPIACED CUTER SEAL IN CUPER DOOR.

830815.

938858 OD 2

21 BA TRANSFER PUMP FAILURE DESCRIPTIW:

PUMP NOUID NOT DEVE[DPE ADEQUATE DISCHAIGE PRESSURE 'IO PASS 405P. 830825.

cut <FEI'nVE ACTION:

REBUILT PWP, REINSTAT.T.m AND ALINED.

830901.

935026 MD 2

23 CHARGING Pm P FAILURE DESCRIPTIW:

PUMP HAS PilIMARY PICKING LEAK.

831021.

Cutc<tL'nVE ACTION:

REPACKED #4 AND #5 CYT TNDERS. 831026.

926486 Mr 2

23SW44, DTFRETS FAILURE DESCRIPTIW:

INSPECT IAW NRC BULLYfIN 83-03 FOR ANY INTERNAL ABNNMALITIES AND ASSURE FLAPPER HAS FREEDW T MOVEMENT.

830412.

CORRHXIVE ACTIW:

RENOVED VALVE, INSPECTED AND REPLACED. 031105.

927395 MD 2

2C VITAL 230V BKRS FAILURE DESCRIPTIW:

REMOVE ALL 230V BKRS, CLEAN & TEST PER M30, M3Z. CLEAN ALL BKR CUBICLES.

830215.

CORRECTIVE ACTIW:

REMNED, CLEANED, INSPECTED AND REPAIRED AS NE'ESSARY 230V BKRS IN C BUS. 2C2Y AND 2C10Y WTT.T. E CmFIEEED AT ANOTHER TIME.

830706.

Page 8 of 16 l

P 50E & G SALEM GENERATING STATIN SAFC1Y REIATED WORK GDER IOG SAIfti UNIT 2 WO NO DEPT WIT EQUIPMENE IDENTIFICATIm 924133 Or 2

RELIEF VALVE 2RH3 FAILURE DESCRIPTICN:

PERFORM IJFf SET TEST 0:12RII3 USING M17E. LIFF SEP PRESSURE 'IO BE 375 PSIG PER DCR 2SC-1245.

830908.

TIRECTIVE PCTIN:

SET VALVE 'IO 380 PSI.

830915.

933236 IC 2

R'ID, NARROW RANGE FAILURE DESCRIPTICN:

REPLACE 2TE411A, 410A and 411B.

831031.

CORRECTIVE 7CTION:

REPLACED RID'S, CmPIETED FUNCTINAL SAT.

831104.

935719 OD 2

RMS, 2R41B FAILURE DESCRIPTICN:

GANNEL KEEPS SPIKING GIVING CWTAIMENT ISOIATICN.

831015.

4 CORRECTIVE PCTION:

REPLACED CCNTROLLER BACKPLANE PINS AND RE-INSTALLED BACKPIANE AND MQXILES.

ElRCTINAL TEST SAT.

831019.

919996 IC 2

RMS,2R2 FAILURE DESCRIPTICN:

CHANNEL IN AIARM. 830204.

CUKHtA;nVE 7CTION:

REPIACED BATTERIES, CWNECTOR CN DISPIAY CABLE, TRANSMIT OFf0 COUPLER AND UPGRADED 7 CIA'S. CAL AND CIANNEL CHECKS SAT.

830915.

935050 MD 2

23MS18, MS BYPASS FAILURE DESCRIPTICN:

BGY 'IO BWNET LEAK.

831023.

CuHatx;nVE PCTION:

REPIACED VALVE INTERNALS.

831030.

935069 MD 2

22CV155 FAILURE DESCRIPTICN:

BWNEP LEAK DRIPPING BORIC 7CID CN 22 BAT PUMP.

831027.

CohxtI:nVE ACTION:

REPIACED DIAPHRAM.

831031.

Page 9 of 16

P:S E &'G SAIst GENERATING SDTICN SAFETY REIATED WDEE ORDER IM SAIRM WIT 2 WO NO - DEPT WIT EUJIPMENT if=wnnCATIN l937026' OD 2'

L2SW352 I

FAIIURE DESCRIPfIW:

VALVE NELD 'IO SERVICE WATER HEADER HAS SLRIOUS IRAK.. 830925..

i.

COPywr1VE ACTION:

REPIACED SPOOL PIECE.

830927.

937027 OD 2

23SW24, SCREEN NASH 1

FAIIURE DESCRIPTIW:

NATER FRCM TELL TALE DRAIN I!OICATES BIDH DIAPHRAM. 830925.-

i CORRECTIVE ACTION:

REPIACED DIAPHRAM.

830927.

t 937049 CD 2

T-REFERENCE 4

FAILURE DESCRIPTICN:

T-REF, DOES NOT APPEAR TO BE 'IRACKING PROPERLY W 'IHE UNITS INCREASE IN POWER.-

THIS PRECWDES AUIO RCD CONTROL A10 PROPER STEAM DUMP CCNTROL.- 830924.

CORRECTIVE ACTIW:

REPLACED SLMIA'IOR 2IC-505 AIO CALIBRATED 830925.

I 937063 m

2 GG SEAL PRESS TRANS i

FAIIURE DESCRIPTICN:

'IHE PRESSURE TRANSMITfER HAS LEAK FRCH BOITCM CF 1 GPM RATE.

830921.-

CCRRECTIVE ACTION:

REPIACED TRANSMITTER DUE TO LEAKING BOURDCE 'IUBE. INSTAT.Tm SNUBBER AT TRANStuM. EDUtO PROBLEM IN SGNA'ICR. 830926.

}

)

937549 m

2 CCNT AIR IDCK EL 100 4

FAILURE DESCRIPTIN:

FAILED LEAK RNFE TEST.

830926.

L i

4 2

Cuous.;nVE ACTION:

RESEATED SEAL AND ADJUSTED DOOR W HINGES.

830926.

\\

937654 CD 2

RMS, 2RS 1

FAILURE DESCRIPTICN:

ALARM I<EEPG GOIIG CFF IN FHB. GANNEL BIOCKED IN CCNIPOL ROOM. 831003.

t i

i f

CORRECTIVE ACTION:

REPIACED DEFECTIVE POWER SUPPIX AND STICKING RESET SWITCH. EUNCTIONAL TEST SAT.

831006.

7

]

Page 10'of 16 l

~

V

J'.

PSE&G SALEM GENERATING STATIN SAFETY RFIATED WORK @ DER LOG -

SAIEM UNIT 2 WO NO DEPT WIT EQUIPMENT unWIIFICATIW 937683 CD 2

CCNT AIR IIXX EL 130 FAILURE DESCRIPTICN:

INNER DOOR HAS EXCESSIVE IEAKGE IM SEAL. 831005.

l Cuoer;r1VE ACTION:

REPLACED INNER AND OUIER DOOR SFAL.

831006.

i

'937937 CD 2

IEIDOWN PRESSURE 1

FAIIERE DESCRIPTIN:

BOTH CCNSOLE AND l'250, LEIDOWN PRESSURE INDICATICN FAILED TF-SCALE HIGH.

830725.

i CORRECTIVE ACTIN:

TRANSMITTER HAD BRWEN BOURDCN 'IUBE. REPLACED TRANSMITTER. 830726, 943501 MT 2

CONT AIR IOCK EL 130 3

i

. FAILURE DESCRIPTICN:

INNER DOOR IS LEAKING FROM UPPER RIGHT HAND CCENER.

831114.

t Cuwrr;r1VE ACTION:

REPIACED BOIH SEALS CN INNER DOOR.

831114.

l 938824 OD 2

21A EEEDWATER HEATER l

FAILURE DESCRIPTICE:

HEATER HAS POSSIBLE 'IUBE LEAKS. 830822.

I CORRECTIVE ACTION:

IOCATED 1 LEAK AND PIUGGED. - SEAL NEEDED DIAPHRAM AND RE-INSTATJm MANWAY.

830828.

939004 2

PZR SPRAY VALVIE FAILURE DESCRIPTICE:

DO NOT MAKE CPEN LIMIT.

830918.

)

CORRECTIVE ACTION:

AIR IEAKING AROUND DIAPHRAM CN 2P53. TIGHTENED DIAPHPAM BOLTS. REPLACED 1

LEAKING EIP CCNVERIER AND I/P.POSITICNER CN 2 PSI. 830920.

l 940329 OD 2

NIS N-43 POWER RANGE FAILURE DESCRIPTICN:

GANNEL HAS LOSS T DETECITE NOLTAGE AIABM UP.

831024.

1 CuwturiVE ACTION:

REPLACED HIGH VOLTAGE PCHER SUPPLY.

831024.

Page 11 of 16

PSE&G SAIDI GENERATING SIATIN SAFETY RELATED WOIE CRDER I/JG SALEM UNIT 2 WO NO DEPT UNIT EQUIPMENT IDENTIFICATIm 940341 CD 2

22 SI PCMP FAILURE DESCRIPTIm:

SERVICE WATER LEAK CN OU'II.ET LINE FIOi IUBE OIL COOLER.

831027.

Cut <RtL'nVE ICTION:

FABRICATED NEW SPOOL PIECE AND INSTN m. 831116.

942729 IC 2

NIS 2N31 SOURCE RANGE FAILURE DESCRIPTIW:

COUNTS DURING CALIBRATICN IfW m 2N31 CP METER. 831114.

CeuxtL'nVE ACTION:

REPIACED BAD DRIVER AMPLIFIER ASSENBLY NM-103. CAL AND MWANL CHECK GAT.

831117.

940887 CD 2

2C SBC FAILURE DESCRIPTICN:

SEC WILL NOT RESET AFTER SAFEGUARDS TEST.

831118.

CUHKtL'nVE ACTION:

RENOVED GASIS 1964-1008 AND REPIKm WITH CHASIS 1964-1004.

831118.

940861 CD 2

CONT AIR IOCK EL 130 FAILURE DESCRIPTICN:

FAILED LEAK RATE, BOTH DOOR.S 831118.

CuMxtA;nVE ACTION:

CLEANED AND TURNED AROUND SEALS.

831118.

940549 m

2 2A EMERG DIESEL FAILURE DESCRIPTICN:

JACKET WATER HEATER IS LEAKING CHRWATES.

831109.

CuKt<tA;nVE ACTICN:

FOUND HEATERS 'IO BE CORRCDED. REPIFm HEATERS. 831110.

941069 MD 2

SPARE SEC G ASSIS FAILURE DESCRIPTICN:

TROUBLESHOUP SEC GASSIS RENOVED FRCM UNIT 2C SEC. 831118.

CUKxtL'nVE ACTION:

REPIrm Dr.tu;nVE PC BOARD IN SIDF 27. TESTED SAT. 831121.

l Page 12 of 16

PSE&G SALEM GENERATING STATION SAFELY RELATED MORK WDER IfG SAIEM UNIT 2

, O NO DEPT UNIT EQUIPMENT IDENTIFICATIW W

942502 IC 2

22 BC WIDE RNG T HOP FAILURE DESCRIPTIN:

ILW LEVEL AMP QTTPUT FAIIS IIM WEN RID RECWNECTED EDLIOTING CWPLETIW T DCR 2EC-1620A, REPLACEFENT CP WR RTD TEMP RECWDERS.

830830.

CORRECTIVE PCTIO4 REPIJCED LOW LEVEL AMPLIFIER. 830830.

942533 IC 2

RMS, 2R17A FAILURE DESCRIPTIW :

GANNEL SHCWS BAD DATA N CRP ALARM AND NARNINGS. 830907.

CuxxtL'nVE PCTION:

REPIACED FIRST STAW OP AMP 715 IN SCALER. CHANNEL CAL SAT. 831003.

940927 OD 2

CONT AIR LOCK EL 100 FAILURE DESCRIPTIW:

FAILED LEAK RATE TEST. 831118.

CusatL'nVE PCTION:

('TPANED SEAL, REPIN m WE.

831118.

942586 IC 2

NIS 2N42 PWR PANGE FAILURE DESCRIPTIW:

ISOLATIN AMPLIFIER 1E307 FGJND CUT C SPDC. DUE 'IO HIS'IORY CF DRIFF, REPLACE AMPLIFIER.

831028.

CORRECTIVE PCTIW:

REPLACED ISOIATIm AMPLIFIER. 831028.

942572 IC 2

INS, 2R41A FAILURE DESCRIPTIN:

CHANNEL DRIPTS HIGH AND IG7 WITH SCAN UP W CmIVIER.

830924.

CuxxtL'nVE ACTION:

REPIACED ACIA'S U42 AhD U43 'IO BRING COUNIS 'IO NORMAL. REPIACED SCALER TEST JACK A10 REALIGNED BENT J1 C3EN PINS. 830927.

940922 CD 2

BKR 2CP PZR HEATERS FAIIERE DESCRIPTION:

OPERATIN T WEN OR CIOSED CCESOLE PUSHBUITW CAUSES A GROUT 0 CN 2A 125VDC l

BUS.

831122.

l l

CORRECTIVE PCTICN:

REPLACED BAD SPRING GARGING KTIOR IN PZR 1 EATER BREAKER. CYCLED WITH NO DETECTAnTR GROUND.

831128.

Page 13 of 16

.PSE&G SALEM GENERATING SD&IN SAFET1Y REIATED N0iE WDER IOG SAIEM UNIT 2 WO NO DEPP UNIT Bgun+1ENP IDENTIFICATIN

.938777 CD 2

2PS2,.PZR SPRAY FAIIURE DESCRIPTIW:

INSPECI VALVE INTERNALS AND LINE EUR BIOCKAGE N0/OR PROPER VALVE CPERATIN.

330812.

CORRECTIVE ACPIN:

INSTATM NW SPEM ASSEMBLY, P7CKING N0 PACKING GIAIO NUT. 831113.~ -

937758 (D

2.

2CV141, CHG RELIEF FAILURE DESCRIPTICN:

23 CHARGING PUMP RELIEF VALVE FAIIED GPEN.

830726.

CORRECTIVE ACTION:

REPIACED VALVE INTERNAIS.

830807.

l Page 14 of 16

t a

' SALEM UNIT 2 OPERATIONS

SUMMARY

REPORT DECEMBER 1983

~ Unit.No. 2 remained shutdown.the entire month as repairs to the generatorfcontinued.

A number of major items were-completed during

~ the month.- 'Five new coils were received-from Westinghouse and

. installed in the generator: stator.

Installation of-the' coil. spacers and-air gap baffle was'also completed.

Preliminary testing was

- performed on the stator cooling water nipple thermocouples and thermocouple. terminal board.

Minor problems were encountered with some of:the thermocouples tested.

These problems were corrected and'

-the affected thermocouples were tested satisfactorily.

Westinghouse is currently performing repairs to four fan coil unit motors.

Barring l

unforeseen difficulties, Unit No. 2 is currently scheduled'to return to service on February 9, 1984..

t 1

9 1

~

Page 15 of 16

,.--r e *-

  • r--

4,--

..me-wwm

-m-r---#.,

n.v n y,

=-e-,,-m--*-.e-m,--.

--wr-,-e- - -, -,,, -,,.- <

,,,m.m.,

  • -e.

-,e--v-

I N

REFUELING INFORMATION DOCKET NO.:

50-311 COMPLETED BY:

L.K. Miller UNIT NAME:

Salem 2 DATE:

January 10, 1984 TELEPHONE:

609/935-6000 EXTENSION:

4455 Month December-1983

- 1..

Refueling information _has changed from last month:

YES X-NO J2.

Scheduled date for next refueling:

January.5, 1985

- 3.

. Scheduled date for restart following refueling:

March 17, 1985 4.

A)

Will Technical Specification changes or other license amendments-be required?

YES NO NOT DETERMINED TO DATE 1/1/84 B)

Has. the reload fuel design ~ been reviewed by the Station Operating Review Coramittee?

YES NO X

If no, when is it scheduled? November 1984 1

5.

Scheduled date (s) for submitting proposed licensing action:

December 1984 (if required)

'6.

Important licensing considerations associated with refueling:

NONE 6

7.

Number of Fue1-' Asse;t.blies:

A)

Incore' 193 B)

In Spent Fuel Storage 72 8.

Present licensed spent fuel storage capacity:

1170 Future spent fuel storage capacity:

1170 Date of last refueling that can be discharged 9..

to spent fuel pool assuming the present licensed capacity:

March.2000 8-1-7.R4 Page 16 of 16

L g pggg Public Service Electric and GO Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station January 10, 1984 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT S ALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of December 1983 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours,

/

J.

M.

Zupko, Jr.

General Manager - Salem Operations (hhhKM:sbh cc:

Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Contro3.

U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page lof 16 7/

8-1-7.R4

) l?

i l

i I

The Energy People

% 21M (2(M 1181