ML20090F513: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:. 9 O
{{#Wiki_filter:. 9 O
Dmcu POWER Goxiwxy P.O. HOx 33180 CHAMLOTTE, N.C. 28242 IIAL H. TUCKEH                                                                   Ten.epuose
Dmcu POWER Goxiwxy P.O. HOx 33180 CHAMLOTTE, N.C. 28242 IIAL H. TUCKEH Ten.epuose
      .Z.","~1.                                 July 17, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414
.Z.","~1.
July 17, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414


==Dear Mr. Denton:==
==Dear Mr. Denton:==
In response to Mr. T. M. Novak's letter of May 25, 1984 which transmitted the
In response to Mr. T. M. Novak's letter of May 25, 1984 which transmitted the
      " Draft"-Catawba Unit 1 Technical Specifications, Duke certified in my {{letter dated|date=July 3, 1984|text=July 3, 1984 letter}} that the specifications as revised by your letters of June 8 and 22, 1984 accurately reflected the as-built plant. A subsequent letter dated July 17,.1984 transmitted a number of revised specifications.
" Draft"-Catawba Unit 1 Technical Specifications, Duke certified in my {{letter dated|date=July 3, 1984|text=July 3, 1984 letter}} that the specifications as revised by your letters of June 8 and 22, 1984 accurately reflected the as-built plant. A subsequent letter dated July 17,.1984 transmitted a number of revised specifications.
Based on the extensive preparation and review effort that has gone into the development of the Catawba Unit 1 Technical Specifications, Duke Power Company certifies that, to the best of our knowledge, the " Draft" Catawba Unit 1 Technical Specificatio'ns, as revised by the three referenced letters, accurately reflect the as-built plant and the Catawba FSAR. Furthermore, we are not aware of any conflicts between the " Draft" Catawba Unit 1 Technical Specifications and the NRC staff's SER analyses.
Based on the extensive preparation and review effort that has gone into the development of the Catawba Unit 1 Technical Specifications, Duke Power Company certifies that, to the best of our knowledge, the " Draft" Catawba Unit 1 Technical Specificatio'ns, as revised by the three referenced letters, accurately reflect the as-built plant and the Catawba FSAR. Furthermore, we are not aware of any conflicts between the " Draft" Catawba Unit 1 Technical Specifications and the NRC staff's SER analyses.
Very truly yours, H. B. Tucker RWO/rbs Attachment cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station                                               8 f e 0 8407230133 840717 PDR ADOCK 05000
Very truly yours, H. B. Tucker RWO/rbs Attachment cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station 8
f e 0 8407230133 840717 PDR ADOCK 05000


Mr. Harold R. D:nton, Director                                                                           l July 17, 1984                                                                                             :
Mr. Harold R. D:nton, Director July 17, 1984 Pagn 2 Mr. Robert Guild, Esq.
Pagn 2 l
Mr. Robert Guild, Esq.
Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135} Devine Street Columbia, South Carolina 29205
Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135} Devine Street Columbia, South Carolina 29205
              . Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 4
. Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 4
                                                                                                                  ]
]
H i
H i
i-4 a
i-4 a
f
f


  ..      'Mr. Harold R. Denton, Director July 17,1984 Pags 2 l
'Mr. Harold R. Denton, Director July 17,1984 Pags 2 l
1 I
1 I
HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Certification of the Catawba Unit 1 Technical Specifications, and that all statements and matters set forth therein are true and correct to the best of his knowledge.
HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Certification of the Catawba Unit 1 Technical Specifications, and that all statements and matters set forth therein are true and correct to the best of his knowledge.
k Hal B. Tucker, Vice President Subscribed and sworn to before me this 17th day of July, 1984.
k Hal B. Tucker, Vice President Subscribed and sworn to before me this 17th day of July, 1984.
L 6 db Notary Public 1/
L 6 db 1/
My Conmission Expires:
Notary Public My Conmission Expires:
Gt,,A M         2o   #tV
Gt,,A M 2o
                  /
#tV
/
l
l
                                .,    .,n ,, -          -. m.   ..-  -    -
.,n m.
y- ,m: . - - , , - - , r .,-v.-}}
y-
,m:
r
.,-v.-}}

Latest revision as of 13:17, 13 December 2024

Advises That Draft Unit 1 Tech Specs Accurately Reflect as-built Plant & FSAR
ML20090F513
Person / Time
Site: Catawba 
Issue date: 07/17/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8407230133
Download: ML20090F513 (3)


Text

. 9 O

Dmcu POWER Goxiwxy P.O. HOx 33180 CHAMLOTTE, N.C. 28242 IIAL H. TUCKEH Ten.epuose

.Z.","~1.

July 17, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

In response to Mr. T. M. Novak's letter of May 25, 1984 which transmitted the

" Draft"-Catawba Unit 1 Technical Specifications, Duke certified in my July 3, 1984 letter that the specifications as revised by your letters of June 8 and 22, 1984 accurately reflected the as-built plant. A subsequent letter dated July 17,.1984 transmitted a number of revised specifications.

Based on the extensive preparation and review effort that has gone into the development of the Catawba Unit 1 Technical Specifications, Duke Power Company certifies that, to the best of our knowledge, the " Draft" Catawba Unit 1 Technical Specificatio'ns, as revised by the three referenced letters, accurately reflect the as-built plant and the Catawba FSAR. Furthermore, we are not aware of any conflicts between the " Draft" Catawba Unit 1 Technical Specifications and the NRC staff's SER analyses.

Very truly yours, H. B. Tucker RWO/rbs Attachment cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station 8

f e 0 8407230133 840717 PDR ADOCK 05000

Mr. Harold R. D:nton, Director July 17, 1984 Pagn 2 Mr. Robert Guild, Esq.

Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135} Devine Street Columbia, South Carolina 29205

. Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 4

]

H i

i-4 a

f

'Mr. Harold R. Denton, Director July 17,1984 Pags 2 l

1 I

HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Certification of the Catawba Unit 1 Technical Specifications, and that all statements and matters set forth therein are true and correct to the best of his knowledge.

k Hal B. Tucker, Vice President Subscribed and sworn to before me this 17th day of July, 1984.

L 6 db 1/

Notary Public My Conmission Expires:

Gt,,A M 2o

  1. tV

/

l

.,n m.

y-

,m:

r

.,-v.-