ML20093M827: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:.. - - -. | ||
a2 M Y NIAGARA-R UMOHAWK NIAGARA MOHAWK POWER CORPORAT10N/300 ERIE BOULEVARD WEST, SYRACUSE. N.Y.13202/ TELEPHONE (315) 474-1511 1 | |||
r October 9, 1984 (NMP2L 0193) 4-1 | |||
' Mr.~ R. W. Starostecki, Director. | |||
;U. S. Nuclear Regulatory Coinnission. | |||
Region I. | |||
' Division of. Project and Resident Programs | |||
'631. Park Avenue King of Prussia, PA'' 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410 | |||
==Dear Mr. Starostecki:== | |||
. Enclosed is an interim report, in accordance with 10CFR50.55(e), for the | |||
. problem -concerning the curtain-type fire dampers. | |||
This. problem was reported | |||
:via tel-con to S. Collins of your staff on September 7,1984 Very truly yours, F | |||
C Yice President | |||
~ Nuclear Engineering and Licensing CVM/GG/pbd xc: ' Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gramm, NRC Resident Inspector Project File (2) | |||
\\ | |||
<x: | |||
L x | |||
T !) | |||
8410230311 841009 PDR ADOCK 05000410 S | |||
PDR 8 | |||
1 | |||
_ _. _.... _.... _. _ _ _. -. _. _ L.. -. _,.. _- _ _. _... _. _ _. Ih_ 2.1 _ | |||
'b | |||
.c | |||
: x.. | |||
n r n An > < | |||
f; tj[ | |||
A ').. y, | |||
t fMIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 | |||
- ~ | |||
InteNm Report for a Problem Concerning Curtain-Type Fire Dampers (55(e)-84-36) | |||
~ | |||
.t' | |||
.,f | |||
*/ w s | |||
f.' | |||
f 4 | |||
~ | |||
Description'of the Problem An operability test' of a representative sample of Quality Assurance Category | |||
'II and Category III, ' UL-listed scurtain-type fire dar-s revealed that some | |||
~ | |||
dampers. fail ed ~ to satisfactorily close under a'r flow and pressure conditions. The test was performed by American Warming and Ventilating, Inc., | |||
- at our request. | |||
J,'g Due to the failuie.of;some Quality Assurance Category IL and III curtain-type fire-dampers to'.seti5factorily close during testing in the presence of air | |||
-flow, an evaluation of Quality Assurance Category I curta n-type f re dampers i | |||
i | |||
^ | |||
is being made, to ensure that they will close against the system air flow. | |||
This evaluation,. is based on the test results of Quality Assurance Category II L | |||
-and --III' dampers. | |||
Category I curtain-type fire dampers have been supplied.to P | |||
Nine Mile Point 2 by Pacific Air Products. | |||
The; matter is still under investigation-and a final report will be submitted by August 29, 1985 | |||
<,q | |||
(! | |||
L, s. | |||
.D | |||
,4 2 u | |||
k< | |||
y w | |||
'4 r | |||
b. | |||
e s | |||
j.' | |||
y o | |||
Y m. | |||
94,t; | |||
(]) - | |||
:= ', | |||
'}} | |||
Latest revision as of 10:08, 13 December 2024
| ML20093M827 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/09/1984 |
| From: | Mangan C NIAGARA MOHAWK POWER CORP. |
| To: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| (55(E)-84-36), (559E-84-36), (NMP2L-0193), (NMP2L-193), NUDOCS 8410230311 | |
| Download: ML20093M827 (3) | |
Text
.. - - -.
a2 M Y NIAGARA-R UMOHAWK NIAGARA MOHAWK POWER CORPORAT10N/300 ERIE BOULEVARD WEST, SYRACUSE. N.Y.13202/ TELEPHONE (315) 474-1511 1
r October 9, 1984 (NMP2L 0193) 4-1
' Mr.~ R. W. Starostecki, Director.
- U. S. Nuclear Regulatory Coinnission.
Region I.
' Division of. Project and Resident Programs
'631. Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
. Enclosed is an interim report, in accordance with 10CFR50.55(e), for the
. problem -concerning the curtain-type fire dampers.
This. problem was reported
- via tel-con to S. Collins of your staff on September 7,1984 Very truly yours, F
C Yice President
~ Nuclear Engineering and Licensing CVM/GG/pbd xc: ' Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gramm, NRC Resident Inspector Project File (2)
\\
<x:
L x
T !)
8410230311 841009 PDR ADOCK 05000410 S
PDR 8
1
_ _. _.... _.... _. _ _ _. -. _. _ L.. -. _,.. _- _ _. _... _. _ _. Ih_ 2.1 _
'b
.c
- x..
n r n An > <
f; tj[
A ').. y,
t fMIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410
- ~
InteNm Report for a Problem Concerning Curtain-Type Fire Dampers (55(e)-84-36)
~
.t'
.,f
- / w s
f.'
f 4
~
Description'of the Problem An operability test' of a representative sample of Quality Assurance Category
'II and Category III, ' UL-listed scurtain-type fire dar-s revealed that some
~
dampers. fail ed ~ to satisfactorily close under a'r flow and pressure conditions. The test was performed by American Warming and Ventilating, Inc.,
- at our request.
J,'g Due to the failuie.of;some Quality Assurance Category IL and III curtain-type fire-dampers to'.seti5factorily close during testing in the presence of air
-flow, an evaluation of Quality Assurance Category I curta n-type f re dampers i
i
^
is being made, to ensure that they will close against the system air flow.
This evaluation,. is based on the test results of Quality Assurance Category II L
-and --III' dampers.
Category I curtain-type fire dampers have been supplied.to P
Nine Mile Point 2 by Pacific Air Products.
The; matter is still under investigation-and a final report will be submitted by August 29, 1985
<,q
(!
L, s.
.D
,4 2 u
k<
y w
'4 r
b.
e s
j.'
y o
Y m.
94,t;
(]) -
- = ',
'