ML20096E587: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:.,
{{#Wiki_filter:.,
11                                                               I g         '~
11 I
                    . . g,%
g
PO Box 1006     .
.. g,%
Senior Vicehesident '
'~
Osorlone, NC2820N006                                           NuclearGeneration '
PO Box 1006 Senior Vicehesident '
(M)382-22000Mce (M)3824360 Fat DUKEPOWER                                                             ,
Osorlone, NC2820N006 NuclearGeneration '
1 January 12,1996                                                                             ,
(M)382-22000Mce (M)3824360 Fat DUKEPOWER 1
U.'S,       Nuclear Regulatory Commission                                                   ,
January 12,1996 U.'S, Nuclear Regulatory Commission Washington,'D. C. 20555 Attention: Document Control Desk
Washington,'D. C. 20555 Attention: Document Control Desk


==Subject:==
==Subject:==
. Catawba Nuclear Station Docket Numbers 50-413 and -414 Technical Specification Revision to Implement Revised 10 CFR.50 Appendix J Attached is a proposed change to Catawba Nuclear Station's Technical Specifications, to. implement the performanced-based containment leak rate' testing (CLRT) requirements of 10 CFR 50 Appendix J, Option B. Note that the proposed change incorporates only the provisions of Option B that apply to Type A (containment) testing.           Changes to implement the Type B and C testing provisions
. Catawba Nuclear Station Docket Numbers 50-413 and -414 Technical Specification Revision to Implement Revised 10 CFR.50 Appendix J Attached is a proposed change to Catawba Nuclear Station's Technical Specifications, to. implement the performanced-based containment leak rate' testing (CLRT) requirements of 10 CFR 50 Appendix J, Option B.
                  .of Option B will be' developed in conjunction with Catawba's conversion to Improved Standard Technical Specifications; ISTS are scheduled to be submitted to the NRC in January, 1997.
Note that the proposed change incorporates only the provisions of Option B that apply to Type A (containment) testing.
The proposed (mark-up) changes to Technical Specifications are included in Attachment I, as well as new original pages. Note that the'new original pages have been providad in a unit-specific format; an amendment to create a separate Technical Specification                           ,
Changes to implement the Type B and C testing provisions
                  . volume for each unit is currently under review by the NRC staff, and is' expected to be approved shortly.           A detailed description of the changes'and their Technical Justification are provided in Attachment II. Attachment III contains an analysis which supports a finding of No.Significant Hazards, and an environmental assessment.
.of Option B will be' developed in conjunction with Catawba's conversion to Improved Standard Technical Specifications; ISTS are scheduled to be submitted to the NRC in January, 1997.
This proposed' change,.which is applicable to Units 1 and 2 of Catawba Nuclear'Stationi has been reviewed by the PlantjOperations 4        ;
The proposed (mark-up) changes to Technical Specifications are included in Attachment I, as well as new original pages.
                  / Review Committee and the corporate Nuclear. Safety Review' Board.,
Note that the'new original pages have been providad in a unit-specific format; an amendment to create a separate Technical Specification
lIt is requested that-this proposed change be approved by May 15, 1996,ito obviate.the need to perform a CLRT during the upcoming Unit 1/ refueling otitage, lEOC9.         Based ~on previous CLRT results,                   '
. volume for each unit is currently under review by the NRC staff, and is' expected to be approved shortly.
: Unit:1' meets the criterion (two consecutive successful tests) of 9601220276 960112 PDR       AD         05000413                                                                l
A detailed description of the changes'and their Technical Justification are provided in Attachment II. Attachment III contains an analysis which supports a finding of No.Significant Hazards, and an environmental assessment.
              , ! ,,,,y__OCK                   PDR                                             g l,
This proposed' change,.which is applicable to Units 1 and 2 of Catawba Nuclear'Stationi has been reviewed by the PlantjOperations
                        . e-an -r-mn -                                                       u
/ Review Committee and the corporate Nuclear. Safety Review' Board.,
4 lIt is requested that-this proposed change be approved by May 15, 1996,ito obviate.the need to perform a CLRT during the upcoming Unit 1/ refueling otitage, lEOC9.
Based ~on previous CLRT results,
: Unit:1' meets the criterion (two consecutive successful tests) of 9601220276 960112 PDR AD
, !,,,,y__OCK 05000413 l
PDR g l,
. e-an -r-mn -
u


U. S. Nuclear Regulatory Commission January 12, 1996 Page 2 10CFR50, Appendix J, Option B, to change the test frequency to once every 10 years. If this amendment is approved, a CLRT would not be required during this refueling outage.
U.
If any additional information is required, please call Scott Geweh       (703) 382-7581.
S. Nuclear Regulatory Commission January 12, 1996 Page 2 10CFR50, Appendix J, Option B, to change the test frequency to once every 10 years. If this amendment is approved, a CLRT would not be required during this refueling outage.
        )   <    <
If any additional information is required, please call Scott Geweh (703) 382-7581.
                  \        ~
\\
)
~
M. S. Tuckman l
l 1
l 1
M. S. Tuckman                                                    '
l l
l 1
I i
O
O


U. S. Nuclear Regulatory Commission January 12, 1996 Page 3 cc: Mr. R'. E. Martin, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D. C. 20555 Mr. S. D. Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 R. J. Freudenberger Senior Resident Inspector Catawba Nuclear Station l
U.
Max Batavia, Chief                               i Bureau of Radiological Health                   i South Carolina Department of Health             l I
S. Nuclear Regulatory Commission January 12, 1996 Page 3 cc:
and Environmental Control 2600 Bull Street Columbia, South Carolina 29207 American Nuclear Insurers c/o Dottie Sherman, ANI Library Town Center, Suite 300A 29 South Main Street West Hartford, CT 06107-2445 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 M & M Nuclear Consultants 1166 Avenue of the Americas New York, NY 10036-2774 i
Mr.
l i
R'.
E. Martin, Project Manager Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D.
C.
20555 Mr. S. D. Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 R. J. Freudenberger Senior Resident Inspector Catawba Nuclear Station Max Batavia, Chief i
Bureau of Radiological Health i
South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29207 American Nuclear Insurers c/o Dottie Sherman, ANI Library Town Center, Suite 300A 29 South Main Street West Hartford, CT 06107-2445 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 M & M Nuclear Consultants 1166 Avenue of the Americas New York, NY 10036-2774 i
i


                      ..  --      . _  -. ~ - . _ . . . _ - . - .     -    . ..-_. .. .  ---
-. ~ -. _... _ -. -.
  . 4 i
4 i
M. S.-Tuckman, being duly sworn, states that he is Senior Vice                               ,
M. S.-Tuckman, being duly sworn, states that he is Senior Vice President of Duke Power Company; that he is authorized on the part
President of Duke Power Company; that he is authorized on the part
- of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Facility Operating Licenses NPF-35 and NPF-52 of the Catawba Nuclear Station; and that all the g
          - of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Facility Operating Licenses NPF-35 g
statements'and matter set forth herein are true and correct to the best'of his knowledge.
and NPF-52 of the Catawba Nuclear Station; and that all the statements'and matter set forth herein are true and correct to the                           ;
W 1
best'of his knowledge.
<s M'. S. Tuckman, Senior Vice President Subscribed and sworn to before me this
1               <s
/8 day of M
* W M'. S. Tuckman, Senior Vice President
i 1996 I
                                                                      /8 day of  M                    i Subscribed and sworn to before me this                                           ,
l
1996 I                                                                                                       l
'Blaa+ 717Wau Notahy %blic t
              'Blaa+ 717Wau                                                                           ;
i 1
Notahy %blic                                                                               t i
My Commission Expires:
1 My Commission Expires:                                                                     ,
$Au 22, /f/b i
              $Au       22, /f/b i
1 i
1 i
i i
i i
Line 78: Line 89:


Attachment I Technical Specification Mark-ups and Revised Originals 6
Attachment I Technical Specification Mark-ups and Revised Originals 6
i l
i l
1 i
1 i
l l
---- - --- -- - ---_ - - - __________________ _ ___,}}
l l
i l
l 1
I i
                                          ---- - --- -- - ---_ - - - __________________ _ ___,}}

Latest revision as of 07:58, 13 December 2024

Application for Amends to Licenses NPF-35 & NPF-52, Implementing performanced-based Containment Leak Rate Testing Requirement of 10CFR50 App J,Option B
ML20096E587
Person / Time
Site: Catawba  
Issue date: 01/12/1996
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096E591 List:
References
NUDOCS 9601220276
Download: ML20096E587 (5)


Text

.,

11 I

g

.. g,%

'~

PO Box 1006 Senior Vicehesident '

Osorlone, NC2820N006 NuclearGeneration '

(M)382-22000Mce (M)3824360 Fat DUKEPOWER 1

January 12,1996 U.'S, Nuclear Regulatory Commission Washington,'D. C. 20555 Attention: Document Control Desk

Subject:

. Catawba Nuclear Station Docket Numbers 50-413 and -414 Technical Specification Revision to Implement Revised 10 CFR.50 Appendix J Attached is a proposed change to Catawba Nuclear Station's Technical Specifications, to. implement the performanced-based containment leak rate' testing (CLRT) requirements of 10 CFR 50 Appendix J, Option B.

Note that the proposed change incorporates only the provisions of Option B that apply to Type A (containment) testing.

Changes to implement the Type B and C testing provisions

.of Option B will be' developed in conjunction with Catawba's conversion to Improved Standard Technical Specifications; ISTS are scheduled to be submitted to the NRC in January, 1997.

The proposed (mark-up) changes to Technical Specifications are included in Attachment I, as well as new original pages.

Note that the'new original pages have been providad in a unit-specific format; an amendment to create a separate Technical Specification

. volume for each unit is currently under review by the NRC staff, and is' expected to be approved shortly.

A detailed description of the changes'and their Technical Justification are provided in Attachment II. Attachment III contains an analysis which supports a finding of No.Significant Hazards, and an environmental assessment.

This proposed' change,.which is applicable to Units 1 and 2 of Catawba Nuclear'Stationi has been reviewed by the PlantjOperations

/ Review Committee and the corporate Nuclear. Safety Review' Board.,

4 lIt is requested that-this proposed change be approved by May 15, 1996,ito obviate.the need to perform a CLRT during the upcoming Unit 1/ refueling otitage, lEOC9.

Based ~on previous CLRT results,

Unit:1' meets the criterion (two consecutive successful tests) of 9601220276 960112 PDR AD

, !,,,,y__OCK 05000413 l

PDR g l,

. e-an -r-mn -

u

U.

S. Nuclear Regulatory Commission January 12, 1996 Page 2 10CFR50, Appendix J, Option B, to change the test frequency to once every 10 years. If this amendment is approved, a CLRT would not be required during this refueling outage.

If any additional information is required, please call Scott Geweh (703) 382-7581.

\\

)

~

M. S. Tuckman l

l 1

O

U.

S. Nuclear Regulatory Commission January 12, 1996 Page 3 cc:

Mr.

R'.

E. Martin, Project Manager Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D.

C.

20555 Mr. S. D. Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 R. J. Freudenberger Senior Resident Inspector Catawba Nuclear Station Max Batavia, Chief i

Bureau of Radiological Health i

South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29207 American Nuclear Insurers c/o Dottie Sherman, ANI Library Town Center, Suite 300A 29 South Main Street West Hartford, CT 06107-2445 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 M & M Nuclear Consultants 1166 Avenue of the Americas New York, NY 10036-2774 i

i

-. ~ -. _... _ -. -.

4 i

M. S.-Tuckman, being duly sworn, states that he is Senior Vice President of Duke Power Company; that he is authorized on the part

- of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Facility Operating Licenses NPF-35 and NPF-52 of the Catawba Nuclear Station; and that all the g

statements'and matter set forth herein are true and correct to the best'of his knowledge.

W 1

<s M'. S. Tuckman, Senior Vice President Subscribed and sworn to before me this

/8 day of M

i 1996 I

l

'Blaa+ 717Wau Notahy %blic t

i 1

My Commission Expires:

$Au 22, /f/b i

1 i

i i

i

Attachment I Technical Specification Mark-ups and Revised Originals 6

i l

i l

1 i


- --- -- - ---_ - - - __________________ _ ___,