ML20100A899: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~    '.' .
{{#Wiki_filter:'.'
RECEIVED tmc aassa monauucs                                ISM N0Y 29 Rf 12: 2t 6500 EAST SLAUSON AWNUE. oTY OF COMMUCE. CAUF0FMA 90040 [213] 725-0110 (213] 685-6730 November 26, 1984                                                                         tie (ll0[j (!in i
~
RECEIVED tmc ISM N0Y 29 Rf 12: 2t aassa monauucs 6500 EAST SLAUSON AWNUE. oTY OF COMMUCE. CAUF0FMA 90040 [213] 725-0110 (213] 685-6730 November 26, 1984 tie (ll0[j (!in i
Director of Region V Nuclear Regulatory Commission Suite 210 1450 Maria Lane Walnut, CA 94596 Re : Notification of Failure to Comply or Existence of a Defect (Section 21 Report)
Director of Region V Nuclear Regulatory Commission Suite 210 1450 Maria Lane Walnut, CA 94596 Re : Notification of Failure to Comply or Existence of a Defect (Section 21 Report)
Gentlemen :
Gentlemen :
The purpose of this letter is to confirm in writing the telepho-nic information conveyed to Mr. Young of your office on November 15, 1984,
The purpose of this letter is to confirm in writing the telepho-nic information conveyed to Mr. Young of your office on November 15, 1984, 1.
: 1. The name ar.d address of the entity informing the Ccanmission are:
The name ar.d address of the entity informing the Ccanmission are:
Greer Hydraulics division of VSI Corporation 6500 East Slauson Avenue City of Ccxamerce , CA 90040-3193 The officer is Jon Knartzer.
Greer Hydraulics division of VSI Corporation 6500 East Slauson Avenue City of Ccxamerce, CA 90040-3193 The officer is Jon Knartzer.
ii. The basic component which is believed to fail to comply with or contain a defect is an actuator. Greer has been informed that such actuators are used with the water make-up valve and that they are intended for installation at "Seabrook Unit 2" located in New Hampshire.
ii. The basic component which is believed to fail to comply with or contain a defect is an actuator. Greer has been informed that such actuators are used with the water make-up valve and that they are intended for installation at "Seabrook Unit 2" located in New Hampshire.
iii. Greer believes the general contractor is:
iii. Greer believes the general contractor is:
United Engineers and Constructors 30 S. 17th Street P.O. Box 8223 Philadelphia, PA 19101
United Engineers and Constructors 30 S. 17th Street P.O. Box 8223 Philadelphia, PA 19101
                -iv. The defect is a swelling of the seals within the actuator, in-creasing the maximum closing time above the maximum allowable time of three seconds.
-iv.
8412040125 841126 PDR ADOCK 05000444 S                       PDR S
The defect is a swelling of the seals within the actuator, in-creasing the maximum closing time above the maximum allowable time of three seconds.
anmen oevanguuos                                                                     {0 77 .2 f
8412040125 841126 PDR ADOCK 05000444 S
PDR S
anmen oevanguuos
{0 77.2 f


l           .,
l
                                  ?
?
Director of Region V
Director of Region V
  .f'                   -Nuclear Regulatory Ca mission
.f'
: November 26, 1984-
-Nuclear Regulatory Ca mission
    ~         .;          Page 2                                                        _
: November 26, 1984-Page 2
                          -v.- Information was received commencing on November' 9,1984.
~
vii Twenty-four (24) ..of such actuators have been supplied to:
-v.-
Posi-Seal' International Rt. 49 and U.S.:95 North Stonington, CT 06359-                             .
Information was received commencing on November' 9,1984.
Greer ' understands that none of such actuators -have been installed
vii Twenty-four (24)..of such actuators have been supplied to:
                        .at.any site.
Posi-Seal' International Rt. 49 and U.S.:95 North Stonington, CT 06359-Greer ' understands that none of such actuators -have been installed
.at.any site.
vii. Samples of such actuators are being. tested by: -
vii. Samples of such actuators are being. tested by: -
Sterns and Rogers 4500 Cherry Creek Drive Denver, CO 80217 Greer is 'also testing to determine the cause of swelling ofithe seals.
Sterns and Rogers 4500 Cherry Creek Drive Denver, CO 80217 Greer is 'also testing to determine the cause of swelling ofithe seals.
s iix. . It is suspected that the swelling is the result of improper long-term storage or use of improper ' lubricants -~during- the assembly .
s iix.. It is suspected that the swelling is the result of improper long-term storage or use of improper ' lubricants -~during-the assembly.
                        -procedures. Af ter determination ' of the cause ,! the seals will be re-placed and the actuators will be. reassembled and re-tested. -Such-repairs will be completed within 60 days.
-procedures. Af ter determination ' of the cause,! the seals will be re-placed and the actuators will be. reassembled and re-tested. -Such-repairs will be completed within 60 days.
ix.     Mvice to purchasers will depend upon determination of the pri-mary cause of the failure.
ix.
Mvice to purchasers will depend upon determination of the pri-mary cause of the failure.
Very truly yours,;
Very truly yours,;
on Knartzer Director of Quality Assurance
on Knartzer Director of Quality Assurance
                        .'JAK:jdl cca     H.D. Weeks RJ'Kosse File
.'JAK:jdl cca H.D. Weeks RJ'Kosse File
                                                                              .}}
.}}

Latest revision as of 06:09, 13 December 2024

Part 21 Rept Re Swelling of Seals within Actuator,Increasing Max Closing Time Above Max Allowable Time of 3 S.Swelling May Result from long-term Storage or Use of Improper Lubricants During Assembly.Testing Underway
ML20100A899
Person / Time
Site: Seabrook 
Issue date: 11/26/1984
From: Knartzer J
GREER HYDRAULICS
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-84 NUDOCS 8412040125
Download: ML20100A899 (2)


Text

'.'

~

RECEIVED tmc ISM N0Y 29 Rf 12: 2t aassa monauucs 6500 EAST SLAUSON AWNUE. oTY OF COMMUCE. CAUF0FMA 90040 [213] 725-0110 (213] 685-6730 November 26, 1984 tie (ll0[j (!in i

Director of Region V Nuclear Regulatory Commission Suite 210 1450 Maria Lane Walnut, CA 94596 Re : Notification of Failure to Comply or Existence of a Defect (Section 21 Report)

Gentlemen :

The purpose of this letter is to confirm in writing the telepho-nic information conveyed to Mr. Young of your office on November 15, 1984, 1.

The name ar.d address of the entity informing the Ccanmission are:

Greer Hydraulics division of VSI Corporation 6500 East Slauson Avenue City of Ccxamerce, CA 90040-3193 The officer is Jon Knartzer.

ii. The basic component which is believed to fail to comply with or contain a defect is an actuator. Greer has been informed that such actuators are used with the water make-up valve and that they are intended for installation at "Seabrook Unit 2" located in New Hampshire.

iii. Greer believes the general contractor is:

United Engineers and Constructors 30 S. 17th Street P.O. Box 8223 Philadelphia, PA 19101

-iv.

The defect is a swelling of the seals within the actuator, in-creasing the maximum closing time above the maximum allowable time of three seconds.

8412040125 841126 PDR ADOCK 05000444 S

PDR S

anmen oevanguuos

{0 77.2 f

l

?

Director of Region V

.f'

-Nuclear Regulatory Ca mission

November 26, 1984-Page 2

~

-v.-

Information was received commencing on November' 9,1984.

vii Twenty-four (24)..of such actuators have been supplied to:

Posi-Seal' International Rt. 49 and U.S.:95 North Stonington, CT 06359-Greer ' understands that none of such actuators -have been installed

.at.any site.

vii. Samples of such actuators are being. tested by: -

Sterns and Rogers 4500 Cherry Creek Drive Denver, CO 80217 Greer is 'also testing to determine the cause of swelling ofithe seals.

s iix.. It is suspected that the swelling is the result of improper long-term storage or use of improper ' lubricants -~during-the assembly.

-procedures. Af ter determination ' of the cause,! the seals will be re-placed and the actuators will be. reassembled and re-tested. -Such-repairs will be completed within 60 days.

ix.

Mvice to purchasers will depend upon determination of the pri-mary cause of the failure.

Very truly yours,;

on Knartzer Director of Quality Assurance

.'JAK:jdl cca H.D. Weeks RJ'Kosse File

.