  %.                                                                                                                          l
I Florida Power CORPORATION Doc a January 19, 1996 3F0196-14 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
    .                                                                                                                          l l
I                                                                                                               _
Florida Power CORPORATION Doc a l
January 19, 1996 3F0196-14 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555


==Subject:==
==Subject:==
10 CFR 26, Fitness-For-Duty Program Performance Data                                             l l
10 CFR 26, Fitness-For-Duty Program Performance Data (Six-Month Report)
(Six-Month Report)


==Dear Sir:==
==Dear Sir:==
Florida Power Corporation hereby submits the six-month Fitness-For-Duty program performance data for the period July 1,1995 through December 31, 1995 in accordance with 10CFR26.71(d).
Sin ly, m
L. C.
elley, Director Nuclear Operations Site Support
/tc Attachment Regional Administrator, Region II xc:
Senior Resident Inspector NRR Project Manager 9601290275 960119 M
PDR ADOCK 05000302 R
PDR
\\}0t\\
i
\\\\\\
CRYSTAL MVER ENERGY COMPLIX.157e0 W. Power Une Street. Crystal Rver e notkia 3442fM708. (904) 790>448t5 A novida Progress Com;wmy


Florida Power Corporation hereby submits the six-month Fitness-For-Duty program performance data for the period July 1,1995 through December 31, 1995 in                                        ;
Attaciunent 3P0196-14 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Florida Power Corooration (FPC) Crystal River U9it 3 December 31.1995 du da.r w cm St. Petersburg. Florida / Crystal River. Florida (352) 563-4355 Jeffrev B. Kessler. MD Phone (Induds aren oude)
accordance with 10CFR26.71(d).
Cordam Name Cutoffs: Screen / Confirmation (ng/ml)
Sin      ly, m
Appendix A to 10CFR 26 Marijuana 50
L. C. elley, Director Nuclear Operations Site Support                                                                                l I
/
              /tc Attachment xc:    Regional Administrator, Region II Senior Resident Inspector NRR Project Manager 9601290275 960119 PDR    ADOCK 05000302 R                  PDR                                                                              M i
15 Aniphetamines 1000 / 500
                                                                                                                    \}0t\
/
                                                                                                                        \\\
Cocaine 300
CRYSTAL MVER ENERGY COMPLIX .157e0 W. Power Une Street . Crystal Rver e notkia 3442fM708 . (904) 790>448t5 A novida Progress Com;wmy
/ 150 Phencyclidine 25 / 25
/
Opiates 300
/ 300 Alcohol (% BAC) 0.04
/
1 Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel t
Average Number with 869 N/A 175 Unescorted Access Casegories Tested Positive Tested Positive Tested Positive Pre-Access 210 l'
N/A N/A 68 0
i Post accident N/A N/A N/A N/A N/A N/A For Observed behavior 0
0 N/A N/A 0
0 Cause Random 236 0
N/A N/A 40 0
N/A N/A N/A N/A N/A N/A Follow-up Other N/A N/A N/A N/A N/A N/A Total 446 l'
N/A N/A 108 0
Page 1


Attaciunent 3P0196-14 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Florida Power Corooration (FPC) Crystal River U9it 3                                            December 31.1995 du da.r w cm St. Petersburg. Florida / Crystal River. Florida (352) 563-4355 Jeffrev B. Kessler. MD                                                                                  Phone (Induds aren oude)
Atrache 3P0196-14 FOOTNOTES 1.
Cordam Name Cutoffs: Screen / Confirmation (ng/ml)              Appendix A to 10CFR 26
The one confirmed positive pre-access test result was reviewed by the Medical Review Officer (MRO) and determined to be acceptable.
                                        /      15  Aniphetamines      1000 / 500                                                              /
NOTE:
Marijuana                  50 25 / 25                                                              /
As of July 1,1991, Florida Power Corporation performed all pre-access testing of Contractors.
Cocaine                    300      / 150      Phencyclidine 0.04                                                              /
Between the period February 28, 1994 and August 15, 1995, B&W Nuclear Technologies (now Framatome Technologies) performed pre-access testing for B&W personnel under the Fitness for Duty Program as approved by Florida Power Corporation.
Opiates                  300      / 300      Alcohol (% BAC) l 1
This approval was suspended on August 14, 1995 pending resolution of the NEI-coordinated annual FFD audit performed during the week of August 7, 1995. Attached to this report is a {{letter dated|date=January 18, 1996|text=letter dated January 18, 1996}} confirming that Framatome Technologies conducted no pre-access screening for FPC during the six-month period subject to this report.
Licensee Employees                  Long-Term                                Short-Term Testing Results Contractor Personnel                Contractor Personnel                        ,
l Page 2
t N/A                                                    175 Average Number with                          869 Unescorted Access Casegories                                                                                            Tested                              Positive Tested        Positive        Tested        Positive 0
Pre-Access                            210            l'            N/A            N/A                    68 i
N/A            N/A            N/A                  N/A                                N/A Post accident            N/A For N/A            N/A                    0                                  0 Observed behavior            0            0 Cause N/A            N/A                    40                                  0 236            0 Random N/A              N/A            N/A                  N/A                                N/A Follow-up                            N/A N/A            N/A            N/A                  N/A                                N/A Other                                N/A 0
Total                                446            l'            N/A            N/A                    108 Page 1


  -                                                                Atrache 3P0196-14 FOOTNOTES
l e
: 1.      The one confirmed positive pre-access test result was reviewed by the Medical Review Officer (MRO) and determined to be acceptable.
4 r
NOTE:  As of July 1,1991, Florida Power Corporation performed all pre-access testing of Contractors.
I o
Between the period February 28, 1994 and August 15, 1995, B&W Nuclear Technologies (now Framatome Technologies) performed pre-access testing for B&W personnel under the Fitness for Duty Program as approved by Florida Power Corporation. This approval was suspended on August 14, 1995 pending resolution of the NEI-coordinated annual FFD audit performed        l during the week of August 7, 1995. Attached to this report is a letter          l dated January 18, 1996 confirming that Framatome Technologies conducted no pre-access screening for FPC during the six-month period subject to this report.
1 m
l l
1 s
l l
0
l l
'y 1
Page 2
n 3
 
ap m
                .  ,                                                      l 4    .
tn o
=
5 c
e h
t
=
n A
o de 4
sa b
sev it iso 3
p de m
r ifno 2
c OR M
fo 1
re b
mun e
l t h
a s t
/
s e 0
O 0
l uT e
f v
e o e
Rt l
ffo
: t l
s o
nu h
wc e
o 0
O 0
os c
c h'sC n
l a
A sR t
aN 3
s s
t e
e b
h g
l u
ye ut a
S cn 0
O 0
s P
ni et ed r a c
hi l i
Pc d e r v f
oi t i
ci c
e s e
e s r o e
p S
pi 0
O 0
o p
h n t
n mm t e i
e r
e r
  . I 1            o              .
At pb a
    %                                                            m              _
l o
1                                                            s              -
s f
0                                                          'y 1                                                            n 3                                                            a p
e yv l
t n                                                          m o
a s
c 5
l s
    = -
e ah t
e ht
t n
    =                                                          n A                                                            o d
a 1
e s
O 1
4                                              a b
o d )s s
s e
i l l e
i v
p gue T
t i
O a ov idwl e e
s o
et f v
p 3
r af i
d e
e ah ot t
m r
n t
i f
s u
n o
i a
c 2
0 O
O R
0 i
M f
ns c s
o 1                                                r e
c ml t
b m
u u e o
u n
o P
e l t                                          ht a
C s v loei t
s s   e                                      /
r c c
0            O        0            l fuT e
i d
e v
t r 0
Rt o                                          l e
0 est e
f f
a h e s m
: t o
n e
l o                                      nu s
r a
e      h o      0            O         0      wc os c      c                                    h' n      l A                                      sC a                                               sR t
T (t r u
s                                              aN                3 b                                              s e               e
i j
                      -                                  t g
0 f
u        ye                                  l ut    h          a S        cn ni    0              O        0      s et               P ed                                    r      a c      hi l d e i        Pc                                      r v f                                                oi t i                                                ci c                                              e s e        e- se                                r o    p p      hpi n  0              O        0      o S                                                t n
ir n
r mm At a i
a o
l t e e
M 0
pb o                                              s f                                                yv e s        s                                    l l        a e                                     ah t         t a                    O                n s      i p
0 C
1                      1 o ldl )s gue e                                              a ove T      O                                      i e
fo n
dwl et f i
s nr ms s
v        e r af aht o t          n                                     s t
r e
u i
no r o w
i a     0             O       0       nst c s         c                                     ml o                                     uu    s e o       C                                                 v P                                              l oei        t c     r ci d                    0             0                   t r e         a                                   hest  e se m         n a                                   T (t r r        u                             0 i         j i                  '
ee et et c
f           r n         a o       M       0             0 C
c T-o ey T-a s o a
f o
d nl gt r
n                  s e
a E
nr no s
r S
ms r o r
r t
w                ee   et c et c
l t
o               ey s  o T- a   T-  a           :
k e p nn o n t
d                 nl   gt r   t   r    l     S                  _
a c m oo h o o
e p nn       r  t a    E k
T e
a               c m oo       on h o t
UE C
o    T e
SC T O
r              UE   l  C   SC T             O                 _
l r
B                                             N
N B


Attachment 3P0196-14 In accordance with 10 CFR 26.71(d), collect and compile fitness-for-duty program performance data on a standard form and submit to the NRC. The data for each site (corporate and other support staff locations combined) must include the following:
, P0196-14 In accordance with 10 CFR 26.71(d), collect and compile fitness-for-duty program performance data on a standard form and submit to the NRC.
: 1.     Random Test Rate - Total tested - 236 + 40       -  276      x 100 - 27.6%
The data for each site (corporate and other support staff locations combined) must include the following:
for 6 months       Total in Pool - 869 + 175   =   1044 (NOTE: Random testing rate is 50% per year.)
276 x 100 - 27.6%
1.
Random Test Rate - Total tested - 236 + 40 1044 for 6 months Total in Pool - 869 + 175
=
(NOTE: Random testing rate is 50% per year.)
(27.6% X 2 - 55.2%)
(27.6% X 2 - 55.2%)
: 2.     Drugs tested for and cutoff levels.                     See Table
2.
: 3.     Workforce population tested.                             See Table
Drugs tested for and cutoff levels.
: 4.       Number of tests and results by population             See Table Process stage                                         Lab & confirmatory screening Type of test                                         See Table
See Table 3.
: 5.     Substances identified.                                   See Table
Workforce population tested.
: 6.     Number of temporary suspensions or other                 N/A administrative actions taken based on on-site presumptive positives for marijuana (THC) and for cocaine.
See Table 4.
l l
Number of tests and results by population See Table Process stage Lab & confirmatory screening See Table Type of test 5.
1 1
Substances identified.
Page 4
See Table 6.
Number of temporary suspensions or other N/A administrative actions taken based on on-site presumptive positives for marijuana (THC) and for cocaine.
1 Page 4


_ _ __ 7 A''=rhmem 3P0196-14 1
_ _ __ 7 A''=rhmem 3P0196-14


==SUMMARY==
==SUMMARY==
OF MANAGEMENT ACT!jfLi INITIATIVES TAKEN:         N/A LESSONS LEARNED:           N/A l
OF MANAGEMENT ACT!jfLi INITIATIVES TAKEN:
1 EFFECTIVENESS EVALVATION-During this six month period, FPC tested 554 employees including contractors       (random,   pre-accesx.,   and         j for-cause). Only one explainable confirmed   positive         l result was identified (0.0018%)                                     l PROGRAM WEAKNESS:         N/A CORRECTIVE ACTIONS:       N/A AUDIT  
N/A LESSONS LEARNED:
N/A 1
EFFECTIVENESS EVALVATION-During this six month period, FPC tested 554 employees including contractors (random, pre-accesx.,
and j
for-cause).
Only one explainable confirmed positive l
result was identified (0.0018%)
PROGRAM WEAKNESS:
N/A CORRECTIVE ACTIONS:
N/A AUDIT  


==SUMMARY==
==SUMMARY==
In accordance with 10CFR26.80, Florida Power Corporation conducted an annual Fitness-for-Duty audit in August,1995. The audit resulted in one finding which was identified and resolved as follows:
In accordance with 10CFR26.80, Florida Power Corporation conducted an annual Fitness-for-Duty audit in August,1995. The audit resulted in one finding which was identified and resolved as follows:
Audit Findina Although observed practices were acceptable and personnel were knowledgeable of the requirements, procedures and training documents used by the SmithKline Beecham Crystal River, Florida collection site did not sufficiently address all the requirements of 10CFR26.20(c).
Audit Findina Although observed practices were acceptable and personnel were knowledgeable of the requirements, procedures and training documents used by the SmithKline Beecham Crystal River, Florida collection site did not sufficiently address all the requirements of 10CFR26.20(c).
Line 147: Line 236:
Page 5
Page 5


Attachm:nt 3F0196-14 l
Attachm:nt 3F0196-14
l


==SUMMARY==
==SUMMARY==
LISTING OF EVENTS REPORTED                     l l
LISTING OF EVENTS REPORTED No events occurred; none reported.
l No events occurred; none reported.
i l
i l
l l
i Page 6
i l
Page 6


M%^?.9Wi FRAMATDWE NES'                                                                   155 Mill Ridge Road P.o. Box 10935 Lynchburg, VA 246024936 Telephone: 5o4-832-4000 Telecopy: 804 832 4029     !
M%^?.9Wi FRAMATDWE NES' 155 Mill Ridge Road P.o. Box 10935 Lynchburg, VA 246024936 Telephone: 5o4-832-4000 Telecopy: 804 832 4029 J nuary 18,1996 i
1 J nuary 18,1996                                                                                         !
l i
Mr. Tim W. Catchpole Senior Nuclear Licensing Engineer Florida Power Corporation (352) 503-4451
Mr. Tim W. Catchpole Senior Nuclear Licensing Engineer Florida Power Corporation (352) 503-4451


==Dear Mr. Catchpole:==
==Dear Mr. Catchpole:==
With regard to fitness for duty program six month performance data, Framatome Technologies, Inc. Access Control conducted no pre-access drug screening for Florida Power Company from July,1995 through December,1995. A six month report, therefore, was not prepared for you.
With regard to fitness for duty program six month performance data, Framatome Technologies, Inc. Access Control conducted no pre-access drug screening for Florida Power Company from July,1995 through December,1995. A six month report, therefore, was not prepared for you.
Should you require further information, please contact me at (804) 832-4010.
Should you require further information, please contact me at (804) 832-4010.
Sincer   ,
Sincer
                      ,1 Amy L~
,1L~
Hanse, Manager FTl Access Control
Amy Hanse, Manager FTl Access Control
    .    ..}}
..}}

Latest revision as of 06:05, 13 December 2024

Forwards Six Month Fitness-For-Duty Program Performance Data for Period 950701-1231,per 10CFR26.71(d)
ML20100B930
Person / Time
Site: Crystal River 
Issue date: 01/19/1996
From: Kelley L
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0196-4, 3F196-4, NUDOCS 9601290275
Download: ML20100B930 (8)


Text

.

I Florida Power CORPORATION Doc a January 19, 1996 3F0196-14 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

Subject:

10 CFR 26, Fitness-For-Duty Program Performance Data (Six-Month Report)

Dear Sir:

Florida Power Corporation hereby submits the six-month Fitness-For-Duty program performance data for the period July 1,1995 through December 31, 1995 in accordance with 10CFR26.71(d).

Sin ly, m

L. C.

elley, Director Nuclear Operations Site Support

/tc Attachment Regional Administrator, Region II xc:

Senior Resident Inspector NRR Project Manager 9601290275 960119 M

PDR ADOCK 05000302 R

PDR

\\}0t\\

i

\\\\\\

CRYSTAL MVER ENERGY COMPLIX.157e0 W. Power Une Street. Crystal Rver e notkia 3442fM708. (904) 790>448t5 A novida Progress Com;wmy

Attaciunent 3P0196-14 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Florida Power Corooration (FPC) Crystal River U9it 3 December 31.1995 du da.r w cm St. Petersburg. Florida / Crystal River. Florida (352) 563-4355 Jeffrev B. Kessler. MD Phone (Induds aren oude)

Cordam Name Cutoffs: Screen / Confirmation (ng/ml)

Appendix A to 10CFR 26 Marijuana 50

/

15 Aniphetamines 1000 / 500

/

Cocaine 300

/ 150 Phencyclidine 25 / 25

/

Opiates 300

/ 300 Alcohol (% BAC) 0.04

/

1 Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel t

Average Number with 869 N/A 175 Unescorted Access Casegories Tested Positive Tested Positive Tested Positive Pre-Access 210 l'

N/A N/A 68 0

i Post accident N/A N/A N/A N/A N/A N/A For Observed behavior 0

0 N/A N/A 0

0 Cause Random 236 0

N/A N/A 40 0

N/A N/A N/A N/A N/A N/A Follow-up Other N/A N/A N/A N/A N/A N/A Total 446 l'

N/A N/A 108 0

Page 1

Atrache 3P0196-14 FOOTNOTES 1.

The one confirmed positive pre-access test result was reviewed by the Medical Review Officer (MRO) and determined to be acceptable.

NOTE:

As of July 1,1991, Florida Power Corporation performed all pre-access testing of Contractors.

Between the period February 28, 1994 and August 15, 1995, B&W Nuclear Technologies (now Framatome Technologies) performed pre-access testing for B&W personnel under the Fitness for Duty Program as approved by Florida Power Corporation.

This approval was suspended on August 14, 1995 pending resolution of the NEI-coordinated annual FFD audit performed during the week of August 7, 1995. Attached to this report is a letter dated January 18, 1996 confirming that Framatome Technologies conducted no pre-access screening for FPC during the six-month period subject to this report.

l Page 2

l e

4 r

I o

1 m

1 s

0

'y 1

n 3

ap m

tn o

=

5 c

e h

t

=

n A

o de 4

sa b

sev it iso 3

p de m

r ifno 2

c OR M

fo 1

re b

mun e

l t h

a s t

/

s e 0

O 0

l uT e

f v

e o e

Rt l

ffo

t l

s o

nu h

wc e

o 0

O 0

os c

c h'sC n

l a

A sR t

aN 3

s s

t e

e b

h g

l u

ye ut a

S cn 0

O 0

s P

ni et ed r a c

hi l i

Pc d e r v f

oi t i

ci c

e s e

e s r o e

p S

pi 0

O 0

o p

h n t

n mm t e i

e r

At pb a

l o

s f

e yv l

a s

l s

e ah t

t n

a 1

O 1

o d )s s

i l l e

p gue T

O a ov idwl e e

et f v

r af i

e ah ot t

n t

s u

i a

0 O

0 i

ns c s

c ml t

u u e o

o P

C s v loei t

r c c

i d

t r 0

0 est e

a h e s m

n e

r a

T (t r u

i j

0 f

ir n

a o

M 0

0 C

fo n

s nr ms s

r e

no r o w

ee et et c

c T-o ey T-a s o a

d nl gt r

a E

r S

r t

l t

k e p nn o n t

a c m oo h o o

T e

UE C

SC T O

l r

N B

, P0196-14 In accordance with 10 CFR 26.71(d), collect and compile fitness-for-duty program performance data on a standard form and submit to the NRC.

The data for each site (corporate and other support staff locations combined) must include the following:

276 x 100 - 27.6%

1.

Random Test Rate - Total tested - 236 + 40 1044 for 6 months Total in Pool - 869 + 175

=

(NOTE: Random testing rate is 50% per year.)

(27.6% X 2 - 55.2%)

2.

Drugs tested for and cutoff levels.

See Table 3.

Workforce population tested.

See Table 4.

Number of tests and results by population See Table Process stage Lab & confirmatory screening See Table Type of test 5.

Substances identified.

See Table 6.

Number of temporary suspensions or other N/A administrative actions taken based on on-site presumptive positives for marijuana (THC) and for cocaine.

1 Page 4

_ _ __ 7 A=rhmem 3P0196-14

SUMMARY

OF MANAGEMENT ACT!jfLi INITIATIVES TAKEN:

N/A LESSONS LEARNED:

N/A 1

EFFECTIVENESS EVALVATION-During this six month period, FPC tested 554 employees including contractors (random, pre-accesx.,

and j

for-cause).

Only one explainable confirmed positive l

result was identified (0.0018%)

PROGRAM WEAKNESS:

N/A CORRECTIVE ACTIONS:

N/A AUDIT

SUMMARY

In accordance with 10CFR26.80, Florida Power Corporation conducted an annual Fitness-for-Duty audit in August,1995. The audit resulted in one finding which was identified and resolved as follows:

Audit Findina Although observed practices were acceptable and personnel were knowledgeable of the requirements, procedures and training documents used by the SmithKline Beecham Crystal River, Florida collection site did not sufficiently address all the requirements of 10CFR26.20(c).

Corrective Action As confirmed by on-site surveillances conducted by FPC Quality Assurance personnel, SmithKline Beecham has developed the necessary administrative instructions relative to security of the laboratory, sample collection, actions to be taken in the event of substitution or adulteration of samples and actions to be taken in the event the donor fails to arrive at the collection site at the scheduled time.

Page 5

Attachm:nt 3F0196-14

SUMMARY

LISTING OF EVENTS REPORTED No events occurred; none reported.

i l

i Page 6

M%^?.9Wi FRAMATDWE NES' 155 Mill Ridge Road P.o. Box 10935 Lynchburg, VA 246024936 Telephone: 5o4-832-4000 Telecopy: 804 832 4029 J nuary 18,1996 i

Mr. Tim W. Catchpole Senior Nuclear Licensing Engineer Florida Power Corporation (352) 503-4451

Dear Mr. Catchpole:

With regard to fitness for duty program six month performance data, Framatome Technologies, Inc. Access Control conducted no pre-access drug screening for Florida Power Company from July,1995 through December,1995. A six month report, therefore, was not prepared for you.

Should you require further information, please contact me at (804) 832-4010.

Sincer

,1L~

Amy Hanse, Manager FTl Access Control

..