ML20101K501: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . . | {{#Wiki_filter:.... | ||
South 1rn Nucisar Operating Company Post Offics Box 1295 | South 1rn Nucisar Operating Company Post Offics Box 1295 | ||
* * ' @rrrfingham. Alabama 35201 Teltphona (205) 868 5131 Southern Nuclear Operating Company | |||
: o.. uor.y L | |||
: o. . uor.y | Vice President Farley Project the Southern electric system l | ||
March 29, 1996 Docket Nos: 50-348 10 CFR 50.4 50-364 U. S. Nuclear Regulatory Commission A'ITN: Dxument Control Desk Washin-tan, D. C. 20555-0001 i | |||
l | l Joseph M. Farley Nuclear Plant l | ||
Ladies and Gentlemen: | Resolution of Seismic Outliers Ladies and Gentlemen: | ||
l | l By {{letter dated|date=December 21, 1995|text=letter dated December 21,1995}}, Southern Nuclear provided a revised schedule to resolve certain outliers with regard to seismic evaluation criteria in response to Generic Letter 87-02, l | ||
outliers with regard to seismic evaluation criteria in response to Generic Letter 87-02, | " Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operatmg Reactors, l | ||
Unresolved Safety Issue (USI) A-46." Two items associated with the Diesel Generator 1 2A were l | |||
scheduled to be completed during the next scheduled generator outage and were to be completed by April 1,1996. These items involve improvements to equipment suchorage for the Local Control Panel and Relay Panel. | |||
i | i The Diesel Generator 1-2A outage was scheduled for March 9,1996, but due to a revised ship date l | ||
for an intercooler tube bundle, the 1-2A Diesel Generator outage is currently rescheduled for April 29,1996. 'Ihe improvements to the Diesel Generator 1-2A equipment anchorage will be completed during the next scheduled 1-2A Diesel Generator outage. | |||
If you have any questions, please advise. | If you have any questions, please advise. | ||
Respectfully submitted, f )/lo"* | Respectfully submitted, f )/lo"* | ||
Dave Morey BDM:maf NRCSEL. DOC I | Dave Morey BDM:maf NRCSEL. DOC I | ||
cc: | |||
i I | Mr. S. D. Ebneter, Region II Admmistrator Mr. B. L. Siegel, NRR Senior Project Manager l | ||
9604020391 960329 | Mr. T. M. Ross, Plant Resident Inspector 1 | ||
p | i I | ||
020098 l | |||
9604020391 960329 i | |||
PDR ADOCK 05000348 9 | |||
p PDR 4 | |||
j | |||
.}} | |||
Latest revision as of 04:37, 13 December 2024
| ML20101K501 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/29/1996 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9604020391 | |
| Download: ML20101K501 (1) | |
Text
....
South 1rn Nucisar Operating Company Post Offics Box 1295
- * ' @rrrfingham. Alabama 35201 Teltphona (205) 868 5131 Southern Nuclear Operating Company
- o.. uor.y L
Vice President Farley Project the Southern electric system l
March 29, 1996 Docket Nos: 50-348 10 CFR 50.4 50-364 U. S. Nuclear Regulatory Commission A'ITN: Dxument Control Desk Washin-tan, D. C. 20555-0001 i
l Joseph M. Farley Nuclear Plant l
Resolution of Seismic Outliers Ladies and Gentlemen:
l By letter dated December 21,1995, Southern Nuclear provided a revised schedule to resolve certain outliers with regard to seismic evaluation criteria in response to Generic Letter 87-02, l
" Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operatmg Reactors, l
Unresolved Safety Issue (USI) A-46." Two items associated with the Diesel Generator 1 2A were l
scheduled to be completed during the next scheduled generator outage and were to be completed by April 1,1996. These items involve improvements to equipment suchorage for the Local Control Panel and Relay Panel.
i The Diesel Generator 1-2A outage was scheduled for March 9,1996, but due to a revised ship date l
for an intercooler tube bundle, the 1-2A Diesel Generator outage is currently rescheduled for April 29,1996. 'Ihe improvements to the Diesel Generator 1-2A equipment anchorage will be completed during the next scheduled 1-2A Diesel Generator outage.
If you have any questions, please advise.
Respectfully submitted, f )/lo"*
Dave Morey BDM:maf NRCSEL. DOC I
cc:
Mr. S. D. Ebneter, Region II Admmistrator Mr. B. L. Siegel, NRR Senior Project Manager l
Mr. T. M. Ross, Plant Resident Inspector 1
i I
020098 l
9604020391 960329 i
PDR ADOCK 05000348 9
p PDR 4
j
.