ENS 40309: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/10/2003 10:36 CST
| event date = 11/10/2003 10:36 CST
| last update date = 11/10/2003
| last update date = 11/10/2003
| title = Automatic Reactor Trip Due To False Rcp Breaker Open Signal
| title = Automatic Reactor Trip Due to False Rcp Breaker Open Signal
| event text = Reactor Protection System actuation in response to an indicated (not an actual) 2A RCP [Reactor Coolant Pump] breaker open position signal.  All reactor protection and support systems operated as expected.  The Aux Feedwater System started as required in response to the tripping of both Steam Generator Feed Pumps.  All 3 RCPs are running; none have tripped.
| event text = Reactor Protection System actuation in response to an indicated (not an actual) 2A RCP [Reactor Coolant Pump] breaker open position signal.  All reactor protection and support systems operated as expected.  The Aux Feedwater System started as required in response to the tripping of both Steam Generator Feed Pumps.  All 3 RCPs are running; none have tripped.
Not understood is the indication of the 2A RCP breaker open when the breaker has remained closed.
Not understood is the indication of the 2A RCP breaker open when the breaker has remained closed.

Latest revision as of 21:24, 1 March 2018

ENS 40309 +/-
Where
Farley Southern Nuclear icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-3.92 h-0.163 days <br />-0.0233 weeks <br />-0.00537 months <br />)
Opened: Forest Lero
12:41 Nov 10, 2003
NRC Officer: Mike Ripley
Last Updated: Nov 10, 2003
40309 - NRC Website