| event date = 10/08/2003 02:16 EST
| event date = 10/08/2003 02:16 EST
| last update date = 11/18/2003
| last update date = 11/18/2003
| title = Invalid Safety Injection Signal During Surveillance Testing At Ginna
| title = Invalid Safety Injection Signal During Surveillance Testing at Ginna
| event text = On October 8, 2003, at 0216 hours Eastern Daylight Savings Time, while in a refueling outage, R.E. Ginna Nuclear Station experienced an invalid "B" train Safety Injection (SI) signal. The invalid signal was the result of an error made while establishing pretest requirements during a 24 month surveillance. The invalid SI signal caused the �B" train Diesel Generator (DG) to actuate. The "B" DG started and functioned as designed, and all support systems functioned properly."  
| event text = On October 8, 2003, at 0216 hours Eastern Daylight Savings Time, while in a refueling outage, R.E. Ginna Nuclear Station experienced an invalid "B" train Safety Injection (SI) signal. The invalid signal was the result of an error made while establishing pretest requirements during a 24 month surveillance. The invalid SI signal caused the �B" train Diesel Generator (DG) to actuate. The "B" DG started and functioned as designed, and all support systems functioned properly."  
The licensee informed the NRC Resident Inspector.
The licensee informed the NRC Resident Inspector.

Latest revision as of 22:24, 1 March 2018

ENS 40332 +/-
Where
Ginna Constellation icon.png
New York (NRC Region 1)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+989.77 h41.24 days <br />5.891 weeks <br />1.356 months <br />)
Opened: Richard Kapp
14:02 Nov 18, 2003
NRC Officer: Chauncey Gould
Last Updated: Nov 18, 2003