ENS 41779: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/15/2005 14:00 PDT
| event date = 06/15/2005 14:00 PDT
| last update date = 06/15/2005
| last update date = 06/15/2005
| title = Automatic Reactor Scram Due To Turbine Throttle Valve Closure
| title = Automatic Reactor Scram Due to Turbine Throttle Valve Closure
| event text = On June 15, 2005 at 1400 PDT Columbia Generating Station experienced a Reactor Protection System (RPS) actuation while operating at full power.  Currently, reactor level is being controlled with the feedwater system and reactor pressure is being controlled via the turbine bypass valves to the condenser.  All safety systems functioned as expected and there was no ECCS system injection.  The initial attempt to trip the main turbine from the control room was unsuccessful and it was subsequently tripped locally.  At this time the plant is stable and indications show that the RPS actuation originated from closure of turbine throttle valves.  Determination of the cause of the RPS actuation is ongoing at this time.
| event text = On June 15, 2005 at 1400 PDT Columbia Generating Station experienced a Reactor Protection System (RPS) actuation while operating at full power.  Currently, reactor level is being controlled with the feedwater system and reactor pressure is being controlled via the turbine bypass valves to the condenser.  All safety systems functioned as expected and there was no ECCS system injection.  The initial attempt to trip the main turbine from the control room was unsuccessful and it was subsequently tripped locally.  At this time the plant is stable and indications show that the RPS actuation originated from closure of turbine throttle valves.  Determination of the cause of the RPS actuation is ongoing at this time.
All rods fully inserted and no relief valves lifted.   
All rods fully inserted and no relief valves lifted.   

Latest revision as of 22:20, 1 March 2018

ENS 41779 +/-
Where
Columbia Generating Station Energy Northwest icon.png
Washington (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000397/LER-2005-003
Time - Person (Reporting Time:+-2.37 h-0.0988 days <br />-0.0141 weeks <br />-0.00325 months <br />)
Opened: Fred Schill
18:38 Jun 15, 2005
NRC Officer: Chauncey Gould
Last Updated: Jun 15, 2005
41779 - NRC Website
Loading map...