ENS 42865: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 09/27/2006 02:47 EDT | | event date = 09/27/2006 02:47 EDT | ||
| last update date = 09/29/2006 | | last update date = 09/29/2006 | ||
| title = Technical Support Center Hvac Removed | | title = Technical Support Center Hvac Removed from Service for Maintenance | ||
| event text = On 9/27/2006, the HVAC for the Hatch Nuclear Plant's Technical Support Center (TSC) was removed from service for planned preventive maintenance and inspections and testing activities. These work activities are planned to be performed and completed within a 12 hour work shift. During the time these activities are being performed, the TSC air handling unit, TSC condensing unit, TSC filter train and the fan unit for the TSC filter train will not be available for operation. As such, the TSC HVAC will be rendered non-functional during the performance of this work activity. | | event text = On 9/27/2006, the HVAC for the Hatch Nuclear Plant's Technical Support Center (TSC) was removed from service for planned preventive maintenance and inspections and testing activities. These work activities are planned to be performed and completed within a 12 hour work shift. During the time these activities are being performed, the TSC air handling unit, TSC condensing unit, TSC filter train and the fan unit for the TSC filter train will not be available for operation. As such, the TSC HVAC will be rendered non-functional during the performance of this work activity. | ||
If an emergency condition requiring activation of the TSC occurs during the time these work activities are being performed, then contingency plans call for utilization of the TSC as long as radiological conditions allow. The site Technical Support Center activation procedure provides instructions to direct TSC management to the Control Room and TSC support personnel to the Simulator Building to continue TSC activities if it is necessary to relocate from the TSC so that TSC functions can be continued. | If an emergency condition requiring activation of the TSC occurs during the time these work activities are being performed, then contingency plans call for utilization of the TSC as long as radiological conditions allow. The site Technical Support Center activation procedure provides instructions to direct TSC management to the Control Room and TSC support personnel to the Simulator Building to continue TSC activities if it is necessary to relocate from the TSC so that TSC functions can be continued. |
Latest revision as of 21:17, 1 March 2018
Where | |
---|---|
Hatch Georgia (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-2.35 h-0.0979 days <br />-0.014 weeks <br />-0.00322 months <br />) | |
Opened: | Frank G. Gorley 04:26 Sep 27, 2006 |
NRC Officer: | Mike Ripley |
Last Updated: | Sep 29, 2006 |
42865 - NRC Website
| |