ENS 43064: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/26/2006 10:30 EST
| event date = 12/26/2006 10:30 EST
| last update date = 12/26/2006
| last update date = 12/26/2006
| title = Emergency Sirens Fail To Operate From County Facilities
| title = Emergency Sirens Fail to Operate from County Facilities
| event text = EP [Emergency Planning] Personnel were coordinating routine silent testing of the Wayne County Alert Notification System (ANS) per EPIP 4-10.  At approximately 0930, Wayne County personnel activated the system from the Wayne County 911 Center activation point.  The test was unsuccessful.  In accordance with procedure, Wayne County personnel attempted to activate the system from the Wayne County EOC.  This test was also unsuccessful.  Per procedure guidance, if the alternate activation point is unsuccessful, Ginna EP personnel are to be notified to perform the test from the Ginna TSC.  Ginna EP performed the silent test of the system from the Ginna TSC per procedure EPIP 4-8.  The test was successful.
| event text = EP [Emergency Planning] Personnel were coordinating routine silent testing of the Wayne County Alert Notification System (ANS) per EPIP 4-10.  At approximately 0930, Wayne County personnel activated the system from the Wayne County 911 Center activation point.  The test was unsuccessful.  In accordance with procedure, Wayne County personnel attempted to activate the system from the Wayne County EOC.  This test was also unsuccessful.  Per procedure guidance, if the alternate activation point is unsuccessful, Ginna EP personnel are to be notified to perform the test from the Ginna TSC.  Ginna EP performed the silent test of the system from the Ginna TSC per procedure EPIP 4-8.  The test was successful.
Site personnel were notified and the Verizon Phone Company was contacted by Engineering to investigate.  Phone line connections from Wayne County to the Brantling Hill transmitter site were functionally tested satisfactorily by Verizon Phone Company.  Verizon personnel & Ginna Maintenance personnel were dispatched to the transmitter site to perform troubleshooting.   
Site personnel were notified and the Verizon Phone Company was contacted by Engineering to investigate.  Phone line connections from Wayne County to the Brantling Hill transmitter site were functionally tested satisfactorily by Verizon Phone Company.  Verizon personnel & Ginna Maintenance personnel were dispatched to the transmitter site to perform troubleshooting.   

Latest revision as of 21:17, 1 March 2018

ENS 43064 +/-
Where
Ginna Constellation icon.png
New York (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+0.77 h0.0321 days <br />0.00458 weeks <br />0.00105 months <br />)
Opened: Doug Gomez
16:16 Dec 26, 2006
NRC Officer: Mark Abramovitz
Last Updated: Dec 26, 2006
43064 - NRC Website
Loading map...