| event date = 06/19/2007 06:35 CDT
| event date = 06/19/2007 06:35 CDT
| last update date = 06/19/2007
| last update date = 06/19/2007
| title = Tech Spec Required Shutdown Due To Instrument Line Steam Leak
| title = Tech Spec Required Shutdown Due to Instrument Line Steam Leak
| event text = During performance of a plant shut down personnel entered the Drywell to investigate a steam leak.  At 0635 hours, personnel identified steam leaking from a flexible hose instrument line (approximately 1" diameter) that is welded to an elbow tap on the C Main Steam line and concluded that the leak constitutes pressure boundary leakage. This required entry into TS 3.4.5, Condition C.  This requires that the unit be in Mode 3 in 12 hours and Mode 4 in 36 hours, which is a TS required shutdown.
| event text = During performance of a plant shut down personnel entered the Drywell to investigate a steam leak.  At 0635 hours, personnel identified steam leaking from a flexible hose instrument line (approximately 1" diameter) that is welded to an elbow tap on the C Main Steam line and concluded that the leak constitutes pressure boundary leakage. This required entry into TS 3.4.5, Condition C.  This requires that the unit be in Mode 3 in 12 hours and Mode 4 in 36 hours, which is a TS required shutdown.
The station has determined that this event is reportable under the provisions of: 10 CFR 50.72 (b)(2)(i) for the plant shutdown required by Technical Specifications, as a 4-hour notification; 10 CFR 50.72 (b)(3)(ii)(A) as an event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers being seriously degraded, as an 8-hour notification.
The station has determined that this event is reportable under the provisions of: 10 CFR 50.72 (b)(2)(i) for the plant shutdown required by Technical Specifications, as a 4-hour notification; 10 CFR 50.72 (b)(3)(ii)(A) as an event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers being seriously degraded, as an 8-hour notification.

Latest revision as of 22:16, 1 March 2018

ENS 43430 +/-
Where
Clinton Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown

10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded
Time - Person (Reporting Time:+-0.43 h-0.0179 days <br />-0.00256 weeks <br />-5.89014e-4 months <br />)
Opened: Ron Frantz
11:09 Jun 19, 2007
NRC Officer: Bill Huffman
Last Updated: Jun 19, 2007