At approximately 0800, lost all FMB control room monitors associated with Digital Control System (
DCS). Several valves in
UF6 process failed in unexpected position. No release and no exposures. System immediately put in a safe configuration. Root cause has begun and system will be kept in safe configuration for now (not restarted) until cause determined and corrected. This is a Courtesy Notification.
The NRC Resident Inspector and the NRC Regional Project Manager (Pelchat) were informed of this information call by the licensee.
- * * UPDATE FROM PARSCALE TO HUFFMAN AT 1146 EDT ON 7/11/07 * * *
The cause has been determined to be attributable to a UPS failure. This UPS failure resulted in a re-initialization of system configuration which, upon power restoration, caused process valves to move to the system's default configuration for the subsequent re-start mode. This default configuration was not correct for the state the system was in at the time of the re-initialization. The programming logic for valve alignment in the event of a re-initialization has since been corrected. There was no release and no exposure, and the system was immediately put in a safe configuration. The root cause is continuing. This is an update to the Courtesy Notification made on 6/18/07.
Notified R2DO (Hopper),
FSME (Burgess).