ENS 45550: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/08/2009 13:28 CST
| event date = 12/08/2009 13:28 CST
| last update date = 12/08/2009
| last update date = 12/08/2009
| title = Technical Support Center Out Of Service For Planned Preventative Maintenance  
| title = Technical Support Center Out of Service for Planned Preventative Maintenance  
| event text = At 1328 [CST] on Tuesday, December 8, 2009, the Dresden Nuclear Power Station (DNPS) Technical Support Center (TSC) emergency ventilation system was removed from service for planned preventative maintenance activities on the damper flow controller and air filtration charcoal system. During the maintenance, the non-emergency ventilation system will be functional. The TSC air filtration fan and dampers will be non-functional, rendering the TSC HVAC accident mode non-functional. This maintenance is scheduled to minimize out of service time. The planned TSC ventilation outage is scheduled to be completed within 48 hours. If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing EP [Emergency Planning] procedures and checklists. If radiological conditions require TSC facility evacuation during ventilation system restoration; the Station Emergency Director will evacuate and relocate the TSC staff in accordance with, EP-AA-112-200-F-01.
| event text = At 1328 [CST] on Tuesday, December 8, 2009, the Dresden Nuclear Power Station (DNPS) Technical Support Center (TSC) emergency ventilation system was removed from service for planned preventative maintenance activities on the damper flow controller and air filtration charcoal system. During the maintenance, the non-emergency ventilation system will be functional. The TSC air filtration fan and dampers will be non-functional, rendering the TSC HVAC accident mode non-functional. This maintenance is scheduled to minimize out of service time. The planned TSC ventilation outage is scheduled to be completed within 48 hours. If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing EP [Emergency Planning] procedures and checklists. If radiological conditions require TSC facility evacuation during ventilation system restoration; the Station Emergency Director will evacuate and relocate the TSC staff in accordance with, EP-AA-112-200-F-01.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 21:10, 1 March 2018

ENS 45550 +/-
Where
Dresden Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.53 h-0.189 days <br />-0.027 weeks <br />-0.00621 months <br />)
Opened: Frank Winter
14:56 Dec 8, 2009
NRC Officer: Vince Klco
Last Updated: Dec 8, 2009
45550 - NRC Website
Loading map...