| event date = 05/21/2010 19:37 EDT
| event date = 05/21/2010 19:37 EDT
| last update date = 05/21/2010
| last update date = 05/21/2010
| title = Automatic Reactor Trip On Turbine Trip
| title = Automatic Reactor Trip on Turbine Trip
| event text = At 1937 Eastern Daylight Saving Time (EDT), Watts Bar Nuclear Power Plant Unit 1 experienced a reactor trip due to a turbine trip.  This caused an automatic AFW Pump start from P-4 coincident with Lo Tave signal.  The cause of the turbine trip has not yet been identified, and is under investigation.
| event text = At 1937 Eastern Daylight Saving Time (EDT), Watts Bar Nuclear Power Plant Unit 1 experienced a reactor trip due to a turbine trip.  This caused an automatic AFW Pump start from P-4 coincident with Lo Tave signal.  The cause of the turbine trip has not yet been identified, and is under investigation.
The plant is stable and is being maintained in Mode 3, at normal operating pressure and temperature, with steam generator and pressurizer levels normal.
The plant is stable and is being maintained in Mode 3, at normal operating pressure and temperature, with steam generator and pressurizer levels normal.

Latest revision as of 21:09, 1 March 2018

ENS 45944 +/-
Where
Watts Bar Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.67 h-0.0279 days <br />-0.00399 weeks <br />-9.17766e-4 months <br />)