ENS 45987: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/08/2010 11:26 EDT
| event date = 06/08/2010 11:26 EDT
| last update date = 06/08/2010
| last update date = 06/08/2010
| title = Technical Specification Required Shutdown Due To Primary Containment Leak Greater Than Limits
| title = Technical Specification Required Shutdown Due to Primary Containment Leak Greater than Limits
| event text = On 6/8/10 at 10:15, primary containment was declared inoperable and a 24 [hour] Limiting Condition for Operation (LCO) was entered due to Engineered Safety Features leakage in excess of the 1.0 gpm value assumed in the Alternative Source Term (AST) analysis as described in the UFSAR.  
| event text = On 6/8/10 at 10:15, primary containment was declared inoperable and a 24 [hour] Limiting Condition for Operation (LCO) was entered due to Engineered Safety Features leakage in excess of the 1.0 gpm value assumed in the Alternative Source Term (AST) analysis as described in the UFSAR.  
The leakage was from the 'B' RHR heat exchanger relief valve (SR-10-86B) and was estimated at 1.25 gpm.
The leakage was from the 'B' RHR heat exchanger relief valve (SR-10-86B) and was estimated at 1.25 gpm.

Latest revision as of 22:09, 1 March 2018

ENS 45987 +/-
Where
Vermont Yankee Entergy icon.png
Vermont (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-0.27 h-0.0113 days <br />-0.00161 weeks <br />-3.69846e-4 months <br />)
Opened: James Kritzer
15:10 Jun 8, 2010
NRC Officer: Bill Huffman
Last Updated: Jun 8, 2010
45987 - NRC Website
Loading map...