ML20133H814: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:- _ _ _ _ _ _. | ||
\\lE llnd October 10, 1985 tu Power Company jst: | |||
Mr. H. B. Tucker, Vice President Nuclear Production Department | |||
! c2 South Church Street Icharlotte,NC 28242 Gentlemen: | |||
==SUBJECT:== | |||
CATAWBA NUCLEAR STATION EXAMINATION REPORT 413/0L-SS-03 The NRC administered examinations on September 9 - 13, 1985, to employees of your company who had applied for licenses to operate the Catawba Nuclear Plant. At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1. | |||
A table summarizing the examination results for each examined individual is provided as Enclosure 2. | |||
Copies of the written examination questions and answer key are included in this report as Enclosure 3. | |||
In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 a,d 3 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will net be sent to the Public Document Room. | |||
Should you have any questions concerning this letter, please contact us. | |||
Sincerely, (Original signed by VPanciera for) | |||
Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects | |||
==Enclosures:== | |||
: 1. Examination Report 50-413/0L-85-03 | |||
: 2. Table of Examination Results (Official Use Only-Privacy Act Information) | |||
: 3. R0/SRO Exam Questions and Answer Key cc w/encls: | |||
(See page 2) 8510180124 851010 PDR ADOCK 05000413 G | |||
PDR 2:L f >l | |||
Duke Power Company 2 | |||
October 10, 198s cc w/encls. 1 & 2: | |||
H. B. Barron, Superintendent of Operations J. W. Hampton, Station Manager P. C. McAnuity, Training and Safety Coordinator cc wiencls. 1, 2, & 3: | |||
G. Barrett, Training Supervisor bec w/encls. 1, 2, & 3: | |||
Senior Resident Inspector bcc w/ encl. | |||
1: | |||
Project Manager, NRR State of South Carolina EG&G Idaho bcc w/encls. 1 & 3: | |||
Operator Licensing Branch, DHFS,NRR Document Control Desk T gers:es BAWilson C | |||
1-lan HCDance 1oiyi8s p1oi,iss 1oqi8s 1oiri8s}} | |||
Latest revision as of 08:03, 12 December 2024
| ML20133H814 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/10/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20133H816 | List: |
| References | |
| NUDOCS 8510180124 | |
| Download: ML20133H814 (2) | |
Text
- _ _ _ _ _ _.
\\lE llnd October 10, 1985 tu Power Company jst:
Mr. H. B. Tucker, Vice President Nuclear Production Department
! c2 South Church Street Icharlotte,NC 28242 Gentlemen:
SUBJECT:
CATAWBA NUCLEAR STATION EXAMINATION REPORT 413/0L-SS-03 The NRC administered examinations on September 9 - 13, 1985, to employees of your company who had applied for licenses to operate the Catawba Nuclear Plant. At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.
A table summarizing the examination results for each examined individual is provided as Enclosure 2.
Copies of the written examination questions and answer key are included in this report as Enclosure 3.
In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 a,d 3 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will net be sent to the Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, (Original signed by VPanciera for)
Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects
Enclosures:
- 1. Examination Report 50-413/0L-85-03
- 2. Table of Examination Results (Official Use Only-Privacy Act Information)
- 3. R0/SRO Exam Questions and Answer Key cc w/encls:
(See page 2) 8510180124 851010 PDR ADOCK 05000413 G
PDR 2:L f >l
Duke Power Company 2
October 10, 198s cc w/encls. 1 & 2:
H. B. Barron, Superintendent of Operations J. W. Hampton, Station Manager P. C. McAnuity, Training and Safety Coordinator cc wiencls. 1, 2, & 3:
G. Barrett, Training Supervisor bec w/encls. 1, 2, & 3:
Senior Resident Inspector bcc w/ encl.
1:
Project Manager, NRR State of South Carolina EG&G Idaho bcc w/encls. 1 & 3:
Operator Licensing Branch, DHFS,NRR Document Control Desk T gers:es BAWilson C
1-lan HCDance 1oiyi8s p1oi,iss 1oqi8s 1oiri8s