ENS 48276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/05/2012 10:40 EDT
| event date = 09/05/2012 10:40 EDT
| last update date = 09/05/2012
| last update date = 09/05/2012
| title = Technical Support Center Out Of Service Due To Preventative Maintenance On Hvac System
| title = Technical Support Center Out of Service Due to Preventative Maintenance on Hvac System
| event text = This [report] is being issued in advance of a planned activity.  Today, 9/5/2012, the (TSC) Technical Support Center Emergency Ventilation System will be removed from service to support preventative maintenance activities.  The Emergency Ventilation System will not be available and cannot be restored within the time period (75 minutes) required to staff and activate the Emergency Response Organization (ERO). This work is scheduled to complete today.
| event text = This [report] is being issued in advance of a planned activity.  Today, 9/5/2012, the (TSC) Technical Support Center Emergency Ventilation System will be removed from service to support preventative maintenance activities.  The Emergency Ventilation System will not be available and cannot be restored within the time period (75 minutes) required to staff and activate the Emergency Response Organization (ERO). This work is scheduled to complete today.
If an emergency is declared and the TSC ERO activation is required, the TSC will be staffed and activated unless the TSC becomes uninhabitable due to ambient temperature, radiological conditions, or other conditions.  If relocation of the TSC staff becomes necessary, the Station Emergency Director will relocate the staff to an alternate TSC location.
If an emergency is declared and the TSC ERO activation is required, the TSC will be staffed and activated unless the TSC becomes uninhabitable due to ambient temperature, radiological conditions, or other conditions.  If relocation of the TSC staff becomes necessary, the Station Emergency Director will relocate the staff to an alternate TSC location.

Latest revision as of 22:03, 1 March 2018

ENS 48276 +/-
Where
Mcguire Duke Energy icon.png
North Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-3.77 h-0.157 days <br />-0.0224 weeks <br />-0.00516 months <br />)
Opened: Michael Richardson
10:54 Sep 5, 2012
NRC Officer: Howie Crouch
Last Updated: Sep 5, 2012
48276 - NRC Website
Loading map...