| event date = 02/28/2014 08:42 CST
| event date = 02/28/2014 08:42 CST
| last update date = 02/28/2014
| last update date = 02/28/2014
| title = Pyro Panel Removed From Service For Maintenance
| title = Pyro Panel Removed from Service for Maintenance
| event text = At 0842 CST on February 28, 2014, the Unit 1 Pyro Panel (fire/smoke detection panel) was removed from service for required maintenance.  The Pyro Panel was declared non-functional when it was removed from service.  Compensatory measures have been established for all affected areas except the Unit 1 Containment Building.  Since a fire in the Containment Building is an entry condition for the site's Emergency Plan, this is considered a loss of emergency assessment capability and is being reported per 10CFR50.72(b)(3)(xiii).  Containment temperature is being monitored while the pyro panel is out of service, however this is not considered a satisfactory compensatory measure for maintaining effective assessment capability.  A courtesy follow up notification will be sent when the pyro panel is returned to service and functional.
| event text = At 0842 CST on February 28, 2014, the Unit 1 Pyro Panel (fire/smoke detection panel) was removed from service for required maintenance.  The Pyro Panel was declared non-functional when it was removed from service.  Compensatory measures have been established for all affected areas except the Unit 1 Containment Building.  Since a fire in the Containment Building is an entry condition for the site's Emergency Plan, this is considered a loss of emergency assessment capability and is being reported per 10CFR50.72(b)(3)(xiii).  Containment temperature is being monitored while the pyro panel is out of service, however this is not considered a satisfactory compensatory measure for maintaining effective assessment capability.  A courtesy follow up notification will be sent when the pyro panel is returned to service and functional.
The NRC Resident Inspector has been informed.
The NRC Resident Inspector has been informed.

Latest revision as of 21:51, 1 March 2018

ENS 49862 +/-
Where
Farley Southern Nuclear icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-3.67 h-0.153 days <br />-0.0218 weeks <br />-0.00503 months <br />)
Opened: Charles Barefield
11:02 Feb 28, 2014
NRC Officer: Jeff Rotton
Last Updated: Feb 28, 2014