ENS 49901: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 03/12/2014 08:41 CDT | | event date = 03/12/2014 08:41 CDT | ||
| last update date = 03/12/2014 | | last update date = 03/12/2014 | ||
| title = Pyro Panel Maintenance Results | | title = Pyro Panel Maintenance Results in Loss of Emergency Assessment Capability | ||
| event text = At 0841 [CDT] on March 12, 2014, the Unit 1 Pyro Panel (fire/smoke detection panel) was removed from service for required maintenance. The pyro panel was declared non-functional when it was removed from service. Compensatory measures have been established for all affected areas except the unit 1 Containment Building. Since a fire in the Containment Building is an entry condition for the site's Emergency Plan, this is considered a loss of emergency assessment capability and is being reported per 10CFR50.72(b)(3)(xiii). Containment temperature is being monitored while the pyro panel is out of service however this is not considered a satisfactory compensatory measure for maintaining effective assessment capability. A courtesy follow up notification will be sent when the pyro panel is returned to service and functional. | | event text = At 0841 [CDT] on March 12, 2014, the Unit 1 Pyro Panel (fire/smoke detection panel) was removed from service for required maintenance. The pyro panel was declared non-functional when it was removed from service. Compensatory measures have been established for all affected areas except the unit 1 Containment Building. Since a fire in the Containment Building is an entry condition for the site's Emergency Plan, this is considered a loss of emergency assessment capability and is being reported per 10CFR50.72(b)(3)(xiii). Containment temperature is being monitored while the pyro panel is out of service however this is not considered a satisfactory compensatory measure for maintaining effective assessment capability. A courtesy follow up notification will be sent when the pyro panel is returned to service and functional. | ||
The NRC Resident Inspector has been informed. | The NRC Resident Inspector has been informed. |
Latest revision as of 21:51, 1 March 2018
Where | |
---|---|
Farley Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.12 h-0.13 days <br />-0.0186 weeks <br />-0.00427 months <br />) | |
Opened: | Darrin Gard 10:34 Mar 12, 2014 |
NRC Officer: | Vince Klco |
Last Updated: | Mar 12, 2014 |
49901 - NRC Website
| |