ENS 50007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/08/2014 06:18 EDT
| event date = 04/08/2014 06:18 EDT
| last update date = 04/08/2014
| last update date = 04/08/2014
| title = Shutdown Action Initiated Because Hpci And Rcic Were Simultaneously Inoperable
| title = Shutdown Action Initiated Because Hpci and Rcic Were Simultaneously Inoperable
| event text = U1 entered Technical Specification 3.0.3, and initiated actions to reduce power via control rod insertion in preparations to enter startup within the following 6 hours. Entry into Tech Spec 3.0.3 was a result of both HPCI and RCIC injection systems being inoperable at the same time.
| event text = U1 entered Technical Specification 3.0.3, and initiated actions to reduce power via control rod insertion in preparations to enter startup within the following 6 hours. Entry into Tech Spec 3.0.3 was a result of both HPCI and RCIC injection systems being inoperable at the same time.
During startup from the U1 refueling outage, RCIC and HPCI full flow testing was unable to be completed at rated reactor pressure prior to the expiration of the 12 hour allowance per Tech Spec Surveillances 4.7.3.b* and 4.5.1.b.3** respectively. This occurred due to testing issues encountered while attempting to perform the rated pressure pump valve and flow tests.
During startup from the U1 refueling outage, RCIC and HPCI full flow testing was unable to be completed at rated reactor pressure prior to the expiration of the 12 hour allowance per Tech Spec Surveillances 4.7.3.b* and 4.5.1.b.3** respectively. This occurred due to testing issues encountered while attempting to perform the rated pressure pump valve and flow tests.

Latest revision as of 21:51, 1 March 2018

ENS 50007 +/-
Where
Limerick Constellation icon.png
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-0.55 h-0.0229 days <br />-0.00327 weeks <br />-7.5339e-4 months <br />)
Opened: Dan Williamson
09:45 Apr 8, 2014
NRC Officer: Pete Snyder
Last Updated: Apr 8, 2014
50007 - NRC Website
Loading map...