ML20136A986: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:i
{{#Wiki_filter:i OPERATING DATA REcORT (R;v.1)
!
DOCKET NO. 050-0331 DATE 10-15-85 COMPLETED BY Bradford Thomas TELEPHONE 319-851-7309 OPERATING STATUS Notes I thlt Name Duane Arnol d Energy Center
* OPERATING DATA REcORT (R;v.1)
: 2. Reporting Perlod September, 1985
DOCKET NO. 050-0331 DATE 10-15-85 COMPLETED BY Bradford Thomas TELEPHONE 319-851-7309 OPERATING STATUS Notes I thlt Name     Duane Arnol d Energy Center
: 3. Licensed Thermal Power (MWt):
: 2. Reporting Perlod     September, 1985
1658
: 3. Licensed Thermal Power (MWt):     1658
: 4. Nemoplate Rating (Gross MWe):
: 4. Nemoplate Rating (Gross MWe):       565 (Turbine)
565 (Turbine)
: 5. Design Electrical Rating (Net MWe):       538
: 5. Design Electrical Rating (Net MWe):
: 6. Newlmum Dependable Capacity (Gross MWe):       545
538
: 7. Maximum Dependable Capacity (Not MWe):       515
: 6. Newlmum Dependable Capacity (Gross MWe):
545
: 7. Maximum Dependable Capacity (Not MWe):
515
: 8. It Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since the Last Report, Give Reasons:
: 8. It Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since the Last Report, Give Reasons:
: 9. Power Level to Which Restricted, if Any (Net MWe):
: 9. Power Level to Which Restricted, if Any (Net MWe):
: 10. Reasons For Restrictions, if Any:
: 10. Reasons For Restrictions, if Any:
This Month           Yr-to-Date         Cumulative
This Month Yr-to-Date Cumulative
: 11. Hours in Reporting Period                                   720.0               6551.0             93479.0 I2. Number of Hours Reactor Was Critical                       720.0               2524.2             65112.9
: 11. Hours in Reporting Period 720.0 6551.0 93479.0 I2. Number of Hours Reactor Was Critical 720.0 2524.2 65112.9
: 13. Reactor Reserve Shut e wn Hours                               0                   0                 150.3
: 13. Reactor Reserve Shut e wn Hours 0
: 14. murs Generator On-Line                                     720.0               2502.8             63350.5
0 150.3
: 15. tmit Reserve $ hut een Hours                                 0                   0                   0
: 14. murs Generator On-Line 720.0 2502.8 63350.5
: 16. Gross Thermal Energy Generated (MWH)                   1083384             3390108           79850043
: 15. tmit Reserve $ hut een Hours 0
: 17. Gross Electrical Energy Generated (MWH)                 364611             1126490           26713844
0 0
: 18. Not Electrical Energy Generated (MWH)                   (342866)           (1055373)         (25011524)
: 16. Gross Thermal Energy Generated (MWH) 1083384 3390108 79850043
: 19. Unit Service Factor                                         100.0                 38.2               67.8 l
: 17. Gross Electrical Energy Generated (MWH) 364611 1126490 26713844
: 20. Unit Availability Factor                                   100.0                 38.2               67.8
: 18. Not Electrical Energy Generated (MWH)
: 21. thlt Capacity Factor (Using M00 Net)                       (92.5)               31.3               52.0
(342866)
: 22. Unit Capacity Factor (Using DER Net)                       (88.5)               29.9               49.7'
(1055373)
: 23. Unit Forced Outage Rate                                       0                   0                 16.4
(25011524)
: 19. Unit Service Factor 100.0 38.2 67.8 l
: 20. Unit Availability Factor 100.0 38.2 67.8
: 21. thlt Capacity Factor (Using M00 Net)
(92.5) 31.3 52.0
: 22. Unit Capacity Factor (Using DER Net)
(88.5) 29.9 49.7'
: 23. Unit Forced Outage Rate 0
0 16.4
: 24. Shuteens Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shuteens Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
kne 2$. If Shut Down At End 0f Report Period, Estimated Date of Startup       N/A 1
kne 2$. If Shut Down At End 0f Report Period, Estimated Date of Startup N/A 1


AVERAGE DAILY LMIT POWER LEVEL (Rev.1)'
AVERAGE DAILY LMIT POWER LEVEL (Rev.1)'
I DOCKET NO. 050-0331                                               ,
I DOCKET NO. 050-0331 lNIT Duane Arnol d Energy Center DATE 10-15-85 f~
lNIT Duane Arnol d Energy Center DATE 10-15-85 COMPLETED BY Bradford Thomas                                       '
COMPLETED BY Bradford Thomas l'
f~
TELEPHONE 319-851-7309 l'
l'                                                                                                      TELEPHONE 319-851-7309 l'
l MONTH September, 1985 l
l             MONTH     September, 1985 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWo-Net)
DAY       AVERAGE DAILY POWER LEVEL                                                   DAY       AVERAGE DAILY POWER LEVEL (MWo-Net)                                                                                       (MWe-Net) l             l'             427-                                                               17                               484 2               421                                                                 18                               456 3               427                                                                 19                               392 4               416                                                                 20                               497 _
(MWe-Net) l l'
f             5'             420                                                                 21                               509 I             6               410                                                                 22                               428 7               406                                                                 23                               '22 i             8               400                                                                 24                                 522 i
427-17 484 2
j             9               463                                                                 25                                 513 10               494                                                                 26                                 S I ')
421 18 456 3
11               503                                                                 27                                 521 12               509                                                                 28                                 531 13               520                                                                 29                                 527 14               507                                                                 30                           - ( 539)
427 19 392 4
(         ~ 15               507                                                                 31                                   -
416 20 497 _
16 *             -501 INSTRlCTIONS                                                                                                                                                 ,
f 5'
          .On this format, list the average elly unit power level in MWe-Net for each ey in the reporting month. Compute to the nearest whole megewatt.
420 21 509 I
6 410 22 428 7
406 23
'22 i
8 400 24 522 i
j 9
463 25 513 10 494 26 S I ')
11 503 27 521 12 509 28 531 13 520 29 527 14 507 30
- ( 539)
(
~ 15 507 31 16 *
-501 INSTRlCTIONS
.On this format, list the average elly unit power level in MWe-Net for each ey in the reporting month. Compute to the nearest whole megewatt.
(9/77) l
(9/77) l
                                                                                                                                                                          )
)
,}}
.}}

Latest revision as of 01:33, 12 December 2024

Revised Monthly Operating Rept for Sept 1985
ML20136A986
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/30/1985
From: Bernard Thomas
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20136A967 List:
References
NUDOCS 8511200103
Download: ML20136A986 (2)


Text

i OPERATING DATA REcORT (R;v.1)

DOCKET NO. 050-0331 DATE 10-15-85 COMPLETED BY Bradford Thomas TELEPHONE 319-851-7309 OPERATING STATUS Notes I thlt Name Duane Arnol d Energy Center

2. Reporting Perlod September, 1985
3. Licensed Thermal Power (MWt):

1658

4. Nemoplate Rating (Gross MWe):

565 (Turbine)

5. Design Electrical Rating (Net MWe):

538

6. Newlmum Dependable Capacity (Gross MWe):

545

7. Maximum Dependable Capacity (Not MWe):

515

8. It Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since the Last Report, Give Reasons:
9. Power Level to Which Restricted, if Any (Net MWe):
10. Reasons For Restrictions, if Any:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 720.0 6551.0 93479.0 I2. Number of Hours Reactor Was Critical 720.0 2524.2 65112.9
13. Reactor Reserve Shut e wn Hours 0

0 150.3

14. murs Generator On-Line 720.0 2502.8 63350.5
15. tmit Reserve $ hut een Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1083384 3390108 79850043
17. Gross Electrical Energy Generated (MWH) 364611 1126490 26713844
18. Not Electrical Energy Generated (MWH)

(342866)

(1055373)

(25011524)

19. Unit Service Factor 100.0 38.2 67.8 l
20. Unit Availability Factor 100.0 38.2 67.8
21. thlt Capacity Factor (Using M00 Net)

(92.5) 31.3 52.0

22. Unit Capacity Factor (Using DER Net)

(88.5) 29.9 49.7'

23. Unit Forced Outage Rate 0

0 16.4

24. Shuteens Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

kne 2$. If Shut Down At End 0f Report Period, Estimated Date of Startup N/A 1

AVERAGE DAILY LMIT POWER LEVEL (Rev.1)'

I DOCKET NO. 050-0331 lNIT Duane Arnol d Energy Center DATE 10-15-85 f~

COMPLETED BY Bradford Thomas l'

TELEPHONE 319-851-7309 l'

l MONTH September, 1985 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWo-Net)

(MWe-Net) l l'

427-17 484 2

421 18 456 3

427 19 392 4

416 20 497 _

f 5'

420 21 509 I

6 410 22 428 7

406 23

'22 i

8 400 24 522 i

j 9

463 25 513 10 494 26 S I ')

11 503 27 521 12 509 28 531 13 520 29 527 14 507 30

- ( 539)

(

~ 15 507 31 16 *

-501 INSTRlCTIONS

.On this format, list the average elly unit power level in MWe-Net for each ey in the reporting month. Compute to the nearest whole megewatt.

(9/77) l

)

.