ML20136B165: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:fuldU
      ,
,
                                                                            fuldU
.
                                      November 8,1985
November 8,1985
  Georgia Power Company
Georgia Power Company
/ ATTN: Mr. R. J. Kelly
/ ATTN: Mr. R. J. Kelly
            Executive Vice President
Executive Vice President
  P. O. Box 4545
P. O. Box 4545
  Atlanta, GA 30302
Atlanta, GA 30302
  Gentlemen:
Gentlemen:
  SUBJECT: REPORT NOS. 50-321/85-31 AND 50-366/85-31
SUBJECT: REPORT NOS. 50-321/85-31 AND 50-366/85-31
  On October 7-11, 1985, NRC inspected activities authorized by NRC Operating
On October 7-11, 1985, NRC inspected activities authorized by NRC Operating
  License Nos. DPR-57 and NPF-5 for your Hatch facility. At the conclusion of the
License Nos. DPR-57 and NPF-5 for your Hatch facility. At the conclusion of the
  inspection, the findings were discussed with those members of your staff
inspection, the findings were discussed with those members of your staff
  identified in the enclosed inspection report.
identified in the enclosed inspection report.
  Areas examined during the inspection are identified in the report. Within these
Areas examined during the inspection are identified in the report. Within these
  areas, the inspection consisted of selective examinations of procedures and
areas, the inspection consisted of selective examinations of procedures and
  representative records, interviews with personnel, and observation of activities
representative records, interviews with personnel, and observation of activities
  in progress.
in progress.
  Within the scope of the inspection, no violations or deviations were identified.
Within the scope of the inspection, no violations or deviations were identified.
  Should you have any questions concerning this letter, please contact us.
Should you have any questions concerning this letter, please contact us.
                                            Sincerely,
Sincerely,
                                            (Original signed by VLBrownlee)
(Original signed by VLBrownlee)
                                            Virgil L. Brownlee, Chief
Virgil L. Brownlee, Chief
                                            Reactor Projects Branch 2
Reactor Projects Branch 2
                                            Division of Reactor Projects
Division of Reactor Projects
  Enclosure:
Enclosure:
  Inspection Report Nos. 50-321/85-31
Inspection Report Nos. 50-321/85-31
      and 50-366/85-31
and 50-366/85-31
  cc w/ encl:
cc w/ encl:
  d. T. Beckham, Vice President and
d. T. Beckham, Vice President and
  d.GeneralManager-NuclearOperation
d.GeneralManager-NuclearOperation
        C. Nix, Site General Manager
C. Nix, Site General Manager
  4 , E. Fornel, Site QA Supervisor
4 , E. Fornel, Site QA Supervisor
  vC. Gucwa, Chief, Nuclear Engineer
vC. Gucwa, Chief, Nuclear Engineer
                                            8511200149 851108
8511200149 851108
  bec w/ encl:                             $DR ADOCK 05000321
bec w/ encl:
  4RC Resident Inspector                                       PDR
$DR
  Wugh S. Jordan, Executive Secretary
ADOCK 05000321
  Document Control Desk
4RC Resident Inspector
  State of Georgia
PDR
  RII               RI           RII             RI)
Wugh S. Jordan, Executive Secretary
  MScott:   Ib     GBelisle     CJ&Wan         VPa ci ra
Document Control Desk
  10/ /85           10/p/85       10/ '55               5
State of Georgia
                                  /[y/tS             t 'K                         1\
RII
                                                                                    y oI
RI
RII
RI)
MScott: Ib
GBelisle
CJ&Wan
VPa ci ra
10/ /85
10/p/85
10/
'55
5
/[y/tS
'K
1\\
t
y oI
}}
}}

Latest revision as of 01:31, 12 December 2024

Forwards Insp Repts 50-321/85-31 & 50-366/85-31 on 851007-11.No Violation or Deviation Noted
ML20136B165
Person / Time
Site: Hatch  
Issue date: 11/08/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20136B168 List:
References
NUDOCS 8511200149
Download: ML20136B165 (1)


See also: IR 05000321/1985031

Text

fuldU

,

.

November 8,1985

Georgia Power Company

/ ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-321/85-31 AND 50-366/85-31

On October 7-11, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-57 and NPF-5 for your Hatch facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by VLBrownlee)

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-321/85-31

and 50-366/85-31

cc w/ encl:

d. T. Beckham, Vice President and

d.GeneralManager-NuclearOperation

C. Nix, Site General Manager

4 , E. Fornel, Site QA Supervisor

vC. Gucwa, Chief, Nuclear Engineer

8511200149 851108

bec w/ encl:

$DR

ADOCK 05000321

4RC Resident Inspector

PDR

Wugh S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

RII

RI

RII

RI)

MScott: Ib

GBelisle

CJ&Wan

VPa ci ra

10/ /85

10/p/85

10/

'55

5

/[y/tS

'K

1\\

t

y oI