ML20136B165
| ML20136B165 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/08/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20136B168 | List: |
| References | |
| NUDOCS 8511200149 | |
| Download: ML20136B165 (1) | |
See also: IR 05000321/1985031
Text
fuldU
,
.
November 8,1985
Georgia Power Company
/ ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT NOS. 50-321/85-31 AND 50-366/85-31
On October 7-11, 1985, NRC inspected activities authorized by NRC Operating
License Nos. DPR-57 and NPF-5 for your Hatch facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by VLBrownlee)
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-321/85-31
and 50-366/85-31
cc w/ encl:
d. T. Beckham, Vice President and
d.GeneralManager-NuclearOperation
C. Nix, Site General Manager
4 , E. Fornel, Site QA Supervisor
vC. Gucwa, Chief, Nuclear Engineer
8511200149 851108
bec w/ encl:
$DR
ADOCK 05000321
4RC Resident Inspector
Wugh S. Jordan, Executive Secretary
Document Control Desk
State of Georgia
RII
RI
RII
RI)
MScott: Ib
GBelisle
CJ&Wan
VPa ci ra
10/ /85
10/p/85
10/
'55
5
/[y/tS
'K
1\\
t
y oI