ENS 51562: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/24/2015 13:30 PST
| event date = 11/24/2015 13:30 PST
| last update date = 11/23/2015
| last update date = 11/23/2015
| title = Offsite Notification Of Fuel Defects
| title = Offsite Notification of Fuel Defects
| event text = At approximately 1100 PST, Columbia Generating Station (CGS) planned to make a non-required notification to Energy Facility Site Evaluation Council (EFSEC) regarding indications of two fuel defects. This condition has not affected full power operation at CGS, and there is no impact to the health and safety of the public or to the environment. CGS plans on making this notification to EFSEC on November 24, 2015 at 1330 PST.
| event text = At approximately 1100 PST, Columbia Generating Station (CGS) planned to make a non-required notification to Energy Facility Site Evaluation Council (EFSEC) regarding indications of two fuel defects. This condition has not affected full power operation at CGS, and there is no impact to the health and safety of the public or to the environment. CGS plans on making this notification to EFSEC on November 24, 2015 at 1330 PST.
This condition is being reported pursuant to 10 CFR 50.72 (b)(2)(xi).
This condition is being reported pursuant to 10 CFR 50.72 (b)(2)(xi).

Latest revision as of 20:46, 1 March 2018

ENS 51562 +/-
Where
Columbia Generating Station Energy Northwest icon.png
Washington (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-27.67 h-1.153 days <br />-0.165 weeks <br />-0.0379 months <br />)
Opened: Bryan Heavilin
17:50 Nov 23, 2015
NRC Officer: Mark Abramovitz
Last Updated: Nov 23, 2015
51562 - NRC Website
Loading map...